Slope drain hole construction device
The invention relates to the technical field of building engineering, and discloses a side slope drainage hole construction device which comprises a first PVC pipe, a second PVC pipe is installed in an inner cavity of the first PVC pipe, a plastic sheet is fixedly connected to one side of the second PVC pipe, a handle is fixedly connected to one side of the plastic sheet, a plastic ring is fixedly connected to the other side of the second PVC pipe, and the plastic ring is fixedly connected to the other side of the second PVC pipe. The plastic ring and the plastic sheet are connected through the second PVC pipe and the handle to form a plug structure, and a water drainage pipe is installed in an inner cavity of the plastic ring. According to the piston type slope drain hole construction device, through cooperation of the plastic ring and the plastic sheet, the plastic ring and the plastic sheet are connected through the second PVC pipe and the handle to form the piston device with the handle, the piston device with the handle is placed in the first PVC pipe, the piston type slope drain hole construction device is formed, and the first PVC pipe and the periphery of the drain pipe are sequentially filled with clay and gravel. The whole device for slope drain hole construction is formed, the phenomenon that padding is not solid is avoided, and the construction efficiency is improved.
本发明涉及建筑工程技术领域,且公开了一种边坡泄水孔施工装置,一种边坡泄水孔施工装置,包括第一PVC管,第一PVC管的内腔中安装有第二PVC管,第二PVC管的一侧固定连接有塑料片,塑料片的一侧固定连接有手柄,第二PVC管的另一侧固定连接有塑料环,塑料环与塑料片通过第二PVC管、手柄连接形成塞头结构,塑料环的内腔中安装有泄水管。本发明,通过塑料环和塑料片的配合,将塑料环与塑料片通过第二PVC管、手柄连接形成带手柄的活塞装置,将带手柄的活塞装置放入第一PVC管内,形成一种活塞式边坡泄水孔施工装置,在第一PVC管内、泄水管四周依次填充黏土、砂石,形成边坡泄水孔施工的整体装置,避免了填料不实的现象,提高了施工效率。
Slope drain hole construction device
The invention relates to the technical field of building engineering, and discloses a side slope drainage hole construction device which comprises a first PVC pipe, a second PVC pipe is installed in an inner cavity of the first PVC pipe, a plastic sheet is fixedly connected to one side of the second PVC pipe, a handle is fixedly connected to one side of the plastic sheet, a plastic ring is fixedly connected to the other side of the second PVC pipe, and the plastic ring is fixedly connected to the other side of the second PVC pipe. The plastic ring and the plastic sheet are connected through the second PVC pipe and the handle to form a plug structure, and a water drainage pipe is installed in an inner cavity of the plastic ring. According to the piston type slope drain hole construction device, through cooperation of the plastic ring and the plastic sheet, the plastic ring and the plastic sheet are connected through the second PVC pipe and the handle to form the piston device with the handle, the piston device with the handle is placed in the first PVC pipe, the piston type slope drain hole construction device is formed, and the first PVC pipe and the periphery of the drain pipe are sequentially filled with clay and gravel. The whole device for slope drain hole construction is formed, the phenomenon that padding is not solid is avoided, and the construction efficiency is improved.
本发明涉及建筑工程技术领域,且公开了一种边坡泄水孔施工装置,一种边坡泄水孔施工装置,包括第一PVC管,第一PVC管的内腔中安装有第二PVC管,第二PVC管的一侧固定连接有塑料片,塑料片的一侧固定连接有手柄,第二PVC管的另一侧固定连接有塑料环,塑料环与塑料片通过第二PVC管、手柄连接形成塞头结构,塑料环的内腔中安装有泄水管。本发明,通过塑料环和塑料片的配合,将塑料环与塑料片通过第二PVC管、手柄连接形成带手柄的活塞装置,将带手柄的活塞装置放入第一PVC管内,形成一种活塞式边坡泄水孔施工装置,在第一PVC管内、泄水管四周依次填充黏土、砂石,形成边坡泄水孔施工的整体装置,避免了填料不实的现象,提高了施工效率。
Slope drain hole construction device
一种边坡泄水孔施工装置
ZHAO JITAO (Autor:in) / ZHAO BINGNAN (Autor:in) / WANG TIANHUAN (Autor:in) / TIAN YIXUAN (Autor:in) / PENG LIUPENG (Autor:in) / LIANG GUANGZHOU (Autor:in)
02.07.2024
Patent
Elektronische Ressource
Chinesisch