Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Roof equipment prefabricated combined type foundation support installation method
The invention discloses an installation method for a prefabricated combined type foundation support of roof equipment. The installation method for the prefabricated combined type foundation support comprises the following construction technological processes that S1, basic data are obtained according to the roof equipment; S2, model drawing is conducted through CAD and BIM software; S3, model segmentation splitting is conducted, and a machining drawing is obtained; s4, prefabricated accessory factory processing; s5, accessories enter the site and are accepted and accepted; s6, equipment foundation installation; the equipment prefabricated support used in the construction method is directly placed on the formed roof, structural layers such as a waterproof layer of the roof are not damaged, the equipment prefabricated support can be moved, later maintenance is facilitated, reutilization can be achieved, a designed equipment foundation can be repeatedly used, and the overall cost is saved; and the anti-skid and anti-vibration design is achieved, and the overall appearance is attractive and practical.
本发明公开了屋面设备预制组合式基础支架安装工法,包括预制组合式基础支架安装工法施工工艺流程如下:S 1、根据屋面设备得出基础数据:S2、利用CAD、BIM软件进行模型绘制:S3、模型分段拆分及出加工图;S4、预制配件工厂加工;S5、配件进场及验收;S6、设备基础安装;本工法所使用的设备预制支架直接放置于成型的屋面上,不破坏屋面防水层等结构层,并且可移动,方便后期维护,可二次利用,设计好的设备基础,可重复使用,整体节约成本,本工法所使用的设备预制支架下方基础底座采用塑胶材质,抗腐蚀、抗老化,具有防滑、防震动设计,整体美观实用。
Roof equipment prefabricated combined type foundation support installation method
The invention discloses an installation method for a prefabricated combined type foundation support of roof equipment. The installation method for the prefabricated combined type foundation support comprises the following construction technological processes that S1, basic data are obtained according to the roof equipment; S2, model drawing is conducted through CAD and BIM software; S3, model segmentation splitting is conducted, and a machining drawing is obtained; s4, prefabricated accessory factory processing; s5, accessories enter the site and are accepted and accepted; s6, equipment foundation installation; the equipment prefabricated support used in the construction method is directly placed on the formed roof, structural layers such as a waterproof layer of the roof are not damaged, the equipment prefabricated support can be moved, later maintenance is facilitated, reutilization can be achieved, a designed equipment foundation can be repeatedly used, and the overall cost is saved; and the anti-skid and anti-vibration design is achieved, and the overall appearance is attractive and practical.
本发明公开了屋面设备预制组合式基础支架安装工法,包括预制组合式基础支架安装工法施工工艺流程如下:S 1、根据屋面设备得出基础数据:S2、利用CAD、BIM软件进行模型绘制:S3、模型分段拆分及出加工图;S4、预制配件工厂加工;S5、配件进场及验收;S6、设备基础安装;本工法所使用的设备预制支架直接放置于成型的屋面上,不破坏屋面防水层等结构层,并且可移动,方便后期维护,可二次利用,设计好的设备基础,可重复使用,整体节约成本,本工法所使用的设备预制支架下方基础底座采用塑胶材质,抗腐蚀、抗老化,具有防滑、防震动设计,整体美观实用。
Roof equipment prefabricated combined type foundation support installation method
屋面设备预制组合式基础支架安装工法
CHEN WEI (Autor:in) / TAN GUOFENG (Autor:in) / FENG MINJING (Autor:in) / FENG SHAOLAN (Autor:in)
02.07.2024
Patent
Elektronische Ressource
Chinesisch
Support Installation Structure of Prefabricated Roof Using Waterproof Cap
Europäisches Patentamt | 2022
Support Installation Structure of Prefabricated Roof Using Waterproof Cap
Europäisches Patentamt | 2021
|Heightening installation method for prefabricated steel roof truss
Europäisches Patentamt | 2024
|PANEL INSTALLATION STRUCTURE OF PREFABRICATED ROOF IMPROVED DURABILITY
Europäisches Patentamt | 2020
|