Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pipeline test vehicle emergency braking device and pipeline
The invention relates to the technical field of rail transit, and discloses a pipeline test vehicle emergency braking device and a pipeline. The device comprises a first filling assembly, a connection filling assembly, a second filling assembly, a third filling assembly and a tail end limiting assembly, the first filling assembly, the second filling assembly and the third filling assembly are arranged at the top in a pipeline, and the sectional areas of the first filling assembly, the second filling assembly and the third filling assembly are sequentially increased; when a test vehicle passes through the first filling assembly, the second filling assembly and the third filling assembly in the pipeline, preset gaps are formed between the test vehicle and the first filling assembly, between the test vehicle and the second filling assembly and between the test vehicle and the third filling assembly. The connection filling assemblies are arranged between the first filling assembly and the second filling assembly and between the second filling assembly and the third filling assembly, and the tail end limiting assembly is arranged at the tail end of the pipeline and located at the bottom in the pipeline.
本发明涉及轨道交通技术领域,公开了一种管道试验车紧急制动装置及管道。其中,该装置包括第一填充组件、衔接填充组件、第二填充组件、第三填充组件和末端限位组件,所述第一填充组件、所述第二填充组件和所述第三填充组件设置在管道内顶部且各自的截面面积依次增加,试验车在所述管道内通过所述第一填充组件、所述第二填充组件和所述第三填充组件时,与所述第一填充组件、所述第二填充组件和所述第三填充组件之间均相距预定间隙,所述衔接填充组件设置在所述第一填充组件与所述第二填充组件之间以及所述第二填充组件和所述第三填充组件之间,所述末端限位组件设置在所述管道末端且位于所述管道内底部。
Pipeline test vehicle emergency braking device and pipeline
The invention relates to the technical field of rail transit, and discloses a pipeline test vehicle emergency braking device and a pipeline. The device comprises a first filling assembly, a connection filling assembly, a second filling assembly, a third filling assembly and a tail end limiting assembly, the first filling assembly, the second filling assembly and the third filling assembly are arranged at the top in a pipeline, and the sectional areas of the first filling assembly, the second filling assembly and the third filling assembly are sequentially increased; when a test vehicle passes through the first filling assembly, the second filling assembly and the third filling assembly in the pipeline, preset gaps are formed between the test vehicle and the first filling assembly, between the test vehicle and the second filling assembly and between the test vehicle and the third filling assembly. The connection filling assemblies are arranged between the first filling assembly and the second filling assembly and between the second filling assembly and the third filling assembly, and the tail end limiting assembly is arranged at the tail end of the pipeline and located at the bottom in the pipeline.
本发明涉及轨道交通技术领域,公开了一种管道试验车紧急制动装置及管道。其中,该装置包括第一填充组件、衔接填充组件、第二填充组件、第三填充组件和末端限位组件,所述第一填充组件、所述第二填充组件和所述第三填充组件设置在管道内顶部且各自的截面面积依次增加,试验车在所述管道内通过所述第一填充组件、所述第二填充组件和所述第三填充组件时,与所述第一填充组件、所述第二填充组件和所述第三填充组件之间均相距预定间隙,所述衔接填充组件设置在所述第一填充组件与所述第二填充组件之间以及所述第二填充组件和所述第三填充组件之间,所述末端限位组件设置在所述管道末端且位于所述管道内底部。
Pipeline test vehicle emergency braking device and pipeline
管道试验车紧急制动装置及管道
02.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
G01M
TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES
,
Prüfen der statischen oder dynamischen Massenverteilung rotierender Teile von Maschinen oder Konstruktionen
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Pipeline detection device and pipeline dredging vehicle
Europäisches Patentamt | 2021
|Koffiefontein emergency pipeline project
British Library Online Contents | 2001
Municipal pipeline dredging device and municipal pipeline dredging vehicle
Europäisches Patentamt | 2021
|