Installation method of steel structure box type inclined strut
The invention relates to a mounting method of a steel structure box type inclined strut, which comprises the following steps: step 1, a sleeve is arranged in each of two ends of the inclined strut in a sliding manner, a handle rod is vertically arranged on the side wall of each sleeve, and a long round hole for the handle rod to penetrate out is formed in the side wall of the inclined strut; secondly, the handle rod is moved, so that the sleeve completely retracts into the inclined strut; after the inclined strut is moved to the installation position, the handle rod is moved again, and the sleeve extends out of the end of the inclined strut and is inserted into the bracket by a preset length; and thirdly, the inclined strut and the bracket are welded. According to the mounting method of the steel structure box-type inclined strut, the sleeves are arranged in the two ends of the box-type inclined strut in the sliding mode respectively, the sleeves stretch out of the inclined strut to be inserted into the brackets when the inclined strut is mounted, the inclined strut and the brackets are temporarily connected through the sleeves, welding of the brackets and the inclined strut is facilitated, and the mounting efficiency of the steel structure box-type inclined strut is improved. Meanwhile, the sleeve is used as a welding lining plate when the inclined strut and the bracket are welded, so that the welding quality is guaranteed.
本发明涉及一种钢结构箱式斜撑的安装方法,其包括如下步骤:步骤一、在所述斜撑的两端内部分别滑动设置一个套筒,所述套筒的侧壁上垂直设置有把手杆,所述斜撑的侧壁上设置有用于所述把手杆穿出的长圆孔;步骤二、移动把手杆,使套筒完全缩回到斜撑内部;将斜撑移动至安装位置后,再次移动把手杆,将套筒从斜撑端部伸出并插入牛腿中预设长度;步骤三、将所述斜撑与牛腿进行焊接。本发明提供的钢结构箱式斜撑的安装方法,通过在箱式斜撑的两端内部分别滑动设置一个套筒,斜撑安装时使套筒伸出斜撑插设在牛腿中,斜撑与牛腿之间通过套筒进行临时连接,方便进行牛腿和斜撑的焊接,套筒同时作为斜撑与牛腿焊接时的焊接衬板,保证了焊接的质量。
Installation method of steel structure box type inclined strut
The invention relates to a mounting method of a steel structure box type inclined strut, which comprises the following steps: step 1, a sleeve is arranged in each of two ends of the inclined strut in a sliding manner, a handle rod is vertically arranged on the side wall of each sleeve, and a long round hole for the handle rod to penetrate out is formed in the side wall of the inclined strut; secondly, the handle rod is moved, so that the sleeve completely retracts into the inclined strut; after the inclined strut is moved to the installation position, the handle rod is moved again, and the sleeve extends out of the end of the inclined strut and is inserted into the bracket by a preset length; and thirdly, the inclined strut and the bracket are welded. According to the mounting method of the steel structure box-type inclined strut, the sleeves are arranged in the two ends of the box-type inclined strut in the sliding mode respectively, the sleeves stretch out of the inclined strut to be inserted into the brackets when the inclined strut is mounted, the inclined strut and the brackets are temporarily connected through the sleeves, welding of the brackets and the inclined strut is facilitated, and the mounting efficiency of the steel structure box-type inclined strut is improved. Meanwhile, the sleeve is used as a welding lining plate when the inclined strut and the bracket are welded, so that the welding quality is guaranteed.
本发明涉及一种钢结构箱式斜撑的安装方法,其包括如下步骤:步骤一、在所述斜撑的两端内部分别滑动设置一个套筒,所述套筒的侧壁上垂直设置有把手杆,所述斜撑的侧壁上设置有用于所述把手杆穿出的长圆孔;步骤二、移动把手杆,使套筒完全缩回到斜撑内部;将斜撑移动至安装位置后,再次移动把手杆,将套筒从斜撑端部伸出并插入牛腿中预设长度;步骤三、将所述斜撑与牛腿进行焊接。本发明提供的钢结构箱式斜撑的安装方法,通过在箱式斜撑的两端内部分别滑动设置一个套筒,斜撑安装时使套筒伸出斜撑插设在牛腿中,斜撑与牛腿之间通过套筒进行临时连接,方便进行牛腿和斜撑的焊接,套筒同时作为斜撑与牛腿焊接时的焊接衬板,保证了焊接的质量。
Installation method of steel structure box type inclined strut
一种钢结构箱式斜撑的安装方法
ZENG ZHILI (Autor:in) / ZHANG JIAJIAN (Autor:in) / DU GUOKANG (Autor:in) / HUANG HUI (Autor:in) / YIN YIFENG (Autor:in)
05.07.2024
Patent
Elektronische Ressource
Chinesisch
Profile steel concrete inclined strut formwork installation method
Europäisches Patentamt | 2020
|Inclined strut structure and inclined strut structure supporting method
Europäisches Patentamt | 2023
|Integral lifting installation construction method for steel structure inclined strut ceiling joist
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Angle installation adjusting device and method for foundation pit steel inclined strut
Europäisches Patentamt | 2024
|