Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Sludge curing agent, application of riverway protection slope and construction method of riverway protection slope
The invention discloses a sludge curing agent, application of a riverway protection slope and a riverway protection slope construction method, and relates to the field of curing agents. The sludge curing agent comprises the following raw materials in parts by weight: 10-20 parts of fly ash; 5 to 15 parts of limestone; 10 to 30 parts of cement; 10 to 20 parts of coal gangue; 20 to 30 parts of mineral powder; 10 to 15 parts of red mud; and 10-25 parts of construction waste powder. The river channel protection slope construction method comprises the steps of side slope trimming, equipment installation, material manufacturing, side slope reinforcing, equipment dismantling and film covering maintenance. The river channel slope protection device has the advantages that river channel slope protection can be conducted through sludge, the sludge resource utilization problem and the sludge treatment and stacking problem are solved, and meanwhile the better ecological slope protection effect is achieved.
本发明公开了一种淤泥固化剂、河道护坡的应用及河道护坡施工方法,涉及固化剂领域。一种淤泥固化剂,包括以下重量份的原料:粉煤灰10‑20份;石灰石5‑15份;水泥10‑30份;煤矸石10‑20份;矿粉20‑30份;赤泥10‑15份;建筑废弃物粉料10‑25份。一种河道护坡施工方法,步骤包括:边坡修整、设备安装、材料制作、边坡加固、拆除设备和覆膜养护。本申请具有使得淤泥可以进行河道护坡,解决淤泥的资源化利用问题和淤泥处理堆放问题,同时更好的生态护坡的效果。
Sludge curing agent, application of riverway protection slope and construction method of riverway protection slope
The invention discloses a sludge curing agent, application of a riverway protection slope and a riverway protection slope construction method, and relates to the field of curing agents. The sludge curing agent comprises the following raw materials in parts by weight: 10-20 parts of fly ash; 5 to 15 parts of limestone; 10 to 30 parts of cement; 10 to 20 parts of coal gangue; 20 to 30 parts of mineral powder; 10 to 15 parts of red mud; and 10-25 parts of construction waste powder. The river channel protection slope construction method comprises the steps of side slope trimming, equipment installation, material manufacturing, side slope reinforcing, equipment dismantling and film covering maintenance. The river channel slope protection device has the advantages that river channel slope protection can be conducted through sludge, the sludge resource utilization problem and the sludge treatment and stacking problem are solved, and meanwhile the better ecological slope protection effect is achieved.
本发明公开了一种淤泥固化剂、河道护坡的应用及河道护坡施工方法,涉及固化剂领域。一种淤泥固化剂,包括以下重量份的原料:粉煤灰10‑20份;石灰石5‑15份;水泥10‑30份;煤矸石10‑20份;矿粉20‑30份;赤泥10‑15份;建筑废弃物粉料10‑25份。一种河道护坡施工方法,步骤包括:边坡修整、设备安装、材料制作、边坡加固、拆除设备和覆膜养护。本申请具有使得淤泥可以进行河道护坡,解决淤泥的资源化利用问题和淤泥处理堆放问题,同时更好的生态护坡的效果。
Sludge curing agent, application of riverway protection slope and construction method of riverway protection slope
一种淤泥固化剂、河道护坡的应用及河道护坡施工方法
LIU YI (Autor:in) / ZHU YAGUANG (Autor:in) / ZHOU GE (Autor:in) / LIU ZHIBIN (Autor:in) / LUO RONGKUN (Autor:in) / ZHOU BAICHENG (Autor:in)
09.07.2024
Patent
Elektronische Ressource
Chinesisch
Riverway landscape slope protection construction method
Europäisches Patentamt | 2020
|Riverway ecological chain protection slope construction method
Europäisches Patentamt | 2020
|Integrated construction equipment for riverway slope protection
Europäisches Patentamt | 2024
|Ecological protection slope for riverway transformation
Europäisches Patentamt | 2023
|