Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction device and construction method of floor slab in steel frame structure
The invention relates to a construction device for a floor slab in a steel frame structure, the steel frame structure comprises a plurality of steel beams and a plurality of steel columns, and the steel frame structure comprises two groups of supporting parts which are respectively arranged on the side walls of two opposite steel beams; the two main keels are placed at the upper ends of the two sets of supporting parts correspondingly; the multiple secondary back ridges are arranged on the main keel at intervals, and the secondary back ridges are perpendicular to the main keel; and the formwork is arranged on the secondary back arris, the formwork is horizontally arranged in a preset space defined by the multiple steel beams, and the upper end of the formwork is flush with the tops of the steel beams. According to the construction device for the floor slab in the steel frame structure, the secondary back ridges and the main keels arranged at the bottom of the formwork serve as main force bearing structures, the connected supporting parts can transfer load force to the steel beams of the steel frame structure, the floor slab is integrally poured on the formwork, the working efficiency is improved, the construction period is shortened, and the quality is guaranteed; the device can be recycled and detached, and the cost is reduced.
本发明涉及一种钢框架结构中楼板的施工装置,钢框架结构包括多个钢梁和多个钢柱,包括:两组支撑部,两组支撑部分别设置于两个相对的钢梁侧壁;两条主龙骨,两条主龙骨分别放置于两组支撑部的上端;多条次背楞,多条次背楞间隔设置于主龙骨上,且次背楞与主龙骨垂直设置;模板,模板设置于次背楞上,且模板水平设置于多个钢梁围构的预设空间内,模板的上端与钢梁的顶部齐平。本发明一种钢框架结构中楼板的施工装置中,通过模板底部设置的次背楞和主龙骨作为主承力结构,且连接的支撑部可以将荷载力转移到钢框架结构的钢梁上,在模板上对楼板整体浇筑,提高了工作效率,缩短施工工期,保证质量,该装置还可周转拆卸,降低成本。
Construction device and construction method of floor slab in steel frame structure
The invention relates to a construction device for a floor slab in a steel frame structure, the steel frame structure comprises a plurality of steel beams and a plurality of steel columns, and the steel frame structure comprises two groups of supporting parts which are respectively arranged on the side walls of two opposite steel beams; the two main keels are placed at the upper ends of the two sets of supporting parts correspondingly; the multiple secondary back ridges are arranged on the main keel at intervals, and the secondary back ridges are perpendicular to the main keel; and the formwork is arranged on the secondary back arris, the formwork is horizontally arranged in a preset space defined by the multiple steel beams, and the upper end of the formwork is flush with the tops of the steel beams. According to the construction device for the floor slab in the steel frame structure, the secondary back ridges and the main keels arranged at the bottom of the formwork serve as main force bearing structures, the connected supporting parts can transfer load force to the steel beams of the steel frame structure, the floor slab is integrally poured on the formwork, the working efficiency is improved, the construction period is shortened, and the quality is guaranteed; the device can be recycled and detached, and the cost is reduced.
本发明涉及一种钢框架结构中楼板的施工装置,钢框架结构包括多个钢梁和多个钢柱,包括:两组支撑部,两组支撑部分别设置于两个相对的钢梁侧壁;两条主龙骨,两条主龙骨分别放置于两组支撑部的上端;多条次背楞,多条次背楞间隔设置于主龙骨上,且次背楞与主龙骨垂直设置;模板,模板设置于次背楞上,且模板水平设置于多个钢梁围构的预设空间内,模板的上端与钢梁的顶部齐平。本发明一种钢框架结构中楼板的施工装置中,通过模板底部设置的次背楞和主龙骨作为主承力结构,且连接的支撑部可以将荷载力转移到钢框架结构的钢梁上,在模板上对楼板整体浇筑,提高了工作效率,缩短施工工期,保证质量,该装置还可周转拆卸,降低成本。
Construction device and construction method of floor slab in steel frame structure
一种钢框架结构中楼板的施工装置及其施工方法
HUANG SHUAI (Autor:in) / TANG TAO (Autor:in) / WANG GUOFU (Autor:in) / LI JIALEI (Autor:in) / LIN WENBIAO (Autor:in) / FANG XUEFEI (Autor:in) / ZHOU HULIANG (Autor:in) / HU YUTING (Autor:in) / CHEN XIANG (Autor:in)
09.07.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2020
|Prefabricated floor slab supporting structure and floor slab construction method
Europäisches Patentamt | 2024
|