Winding type steam curing method for bridge pier column
The invention discloses a bridge pier column winding type steam curing method. The bridge pier column winding type steam curing method comprises the following steps that S1, a pouring formwork is dismantled; s2, a pouring intelligent start-stop system is arranged; s3, intelligent maintenance equipment is installed; 4, geotextile wrapping is conducted; 5, pier surface maintenance is completed; and S5, after S1 to S4 are completed, the intelligent start-stop system in S2 is adopted to detect the temperature and humidity state of the surface of the pier, and the intelligent maintenance equipment is controlled to conduct steam maintenance on the surface of the pier according to the detection result. The defects of traditional steam curing are overcome, and potential safety hazards caused by building of a warm shed or a working platform are avoided. Practice proves that 7d and 14d strength detection is higher than design strength, the appearance is free of defects, facilities such as a warm shed and an operation platform do not need to be erected, potential safety hazards are greatly eliminated, meanwhile, the purpose of intelligent control is achieved through a temperature and humidity sensor, and the maintenance cost is reduced. And construction measures and cost are reduced while bridge pier column concrete is ensured to meet design standards.
本发明公开了一种桥梁墩柱缠绕式蒸气养护方法,包括如下步骤:S 1:拆除浇筑模板;S 2:设置浇筑智能启停系统;S 3:安装智能养护设备;S 4:包裹土工布;S 5:完成桥墩表面养护;S5中,在完成S1~S4后,采用S2中智能启停系统对桥墩表面温湿度状态进行检测,并依据检测结果控制智能养护设备对桥墩表面进行蒸气养护。克服了传统蒸汽养护的缺点,避免了搭设暖棚或工作平台带来的安全隐患。使混凝土处于一个良好的养护环境,实践证明7d、14d强度检测均高于设计强度,外观无缺陷,且无需搭设暖棚、操作平台等设施,极大消除了安全隐患,同时通过温湿度传感器达到智能控制的目标,确保桥梁墩柱混凝土满足设计标准的同时减少施工措施及成本。
Winding type steam curing method for bridge pier column
The invention discloses a bridge pier column winding type steam curing method. The bridge pier column winding type steam curing method comprises the following steps that S1, a pouring formwork is dismantled; s2, a pouring intelligent start-stop system is arranged; s3, intelligent maintenance equipment is installed; 4, geotextile wrapping is conducted; 5, pier surface maintenance is completed; and S5, after S1 to S4 are completed, the intelligent start-stop system in S2 is adopted to detect the temperature and humidity state of the surface of the pier, and the intelligent maintenance equipment is controlled to conduct steam maintenance on the surface of the pier according to the detection result. The defects of traditional steam curing are overcome, and potential safety hazards caused by building of a warm shed or a working platform are avoided. Practice proves that 7d and 14d strength detection is higher than design strength, the appearance is free of defects, facilities such as a warm shed and an operation platform do not need to be erected, potential safety hazards are greatly eliminated, meanwhile, the purpose of intelligent control is achieved through a temperature and humidity sensor, and the maintenance cost is reduced. And construction measures and cost are reduced while bridge pier column concrete is ensured to meet design standards.
本发明公开了一种桥梁墩柱缠绕式蒸气养护方法,包括如下步骤:S 1:拆除浇筑模板;S 2:设置浇筑智能启停系统;S 3:安装智能养护设备;S 4:包裹土工布;S 5:完成桥墩表面养护;S5中,在完成S1~S4后,采用S2中智能启停系统对桥墩表面温湿度状态进行检测,并依据检测结果控制智能养护设备对桥墩表面进行蒸气养护。克服了传统蒸汽养护的缺点,避免了搭设暖棚或工作平台带来的安全隐患。使混凝土处于一个良好的养护环境,实践证明7d、14d强度检测均高于设计强度,外观无缺陷,且无需搭设暖棚、操作平台等设施,极大消除了安全隐患,同时通过温湿度传感器达到智能控制的目标,确保桥梁墩柱混凝土满足设计标准的同时减少施工措施及成本。
Winding type steam curing method for bridge pier column
一种桥梁墩柱缠绕式蒸气养护方法
SHAO SHUAI (Autor:in) / DAI JIANG (Autor:in) / ZHANG ZHIGANG (Autor:in) / ZHAO LINZHOU (Autor:in) / CAO ZHENZHONG (Autor:in) / ZHANG FENGJIE (Autor:in) / WANG LU (Autor:in) / CHENG TAO (Autor:in) / SU LIWEN (Autor:in)
12.07.2024
Patent
Elektronische Ressource
Chinesisch
Bridge pier column concrete curing device and curing method
Europäisches Patentamt | 2022
|Pier column concrete curing covering material winding device and method
Europäisches Patentamt | 2021
|Full-automatic bridge pier column hydrophobic concrete curing device
Europäisches Patentamt | 2024
|