Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water supply pipeline construction method for preventing water leakage and moisture regain and pipeline connecting device
The invention relates to the technical field of water supply pipeline construction, in particular to a water supply pipeline construction method for preventing water leakage and moisture regain and a pipeline connecting device.The water supply pipeline construction method for preventing water leakage and moisture regain comprises the steps that the connection position of a water supply pipe is found out according to a building construction drawing and measured, and the position and height of the water supply pipe are marked according to the measurement result; after beam plate reinforcement cage construction is completed and before concrete is poured, an inclined pipe is pre-buried according to marks, and the two ends of the inclined pipe are connected with elbows correspondingly; concrete is poured on a beam plate reinforcement cage, a structural plate is formed, pre-burying of the water supply pipe is completed, the inclined pipe and the elbow are prevented from being directly irradiated by sunlight by pre-burying the inclined pipe and the elbow during construction, ultraviolet rays and light in the sunlight are prevented from stimulating precipitation and crystallization of dissolved substances in water, generation of scale is slowed down, and the service life of the water supply pipe is prolonged. The dark environment of the pre-buried pipeline is beneficial for reducing the generation speed of scale, the position and height of the water supply pipe are determined through the measuring instrument, and installation errors are avoided.
本发明涉及给水管道施工技术领域,尤其是一种防漏水返潮的给水管道施工方法及管道连接装置,其防漏水返潮的给水管道施工方法包括,根据建筑施工图找出给水管接驳位置并进行测量,根据测量结果对给水管的位置和高度进行标注;在梁板钢筋笼施工完成后浇筑混凝土前,根据标注预埋倾斜管,在倾斜管的两端分别连接弯头;往梁板钢筋笼上浇筑混凝土,形成结构板,完成给水管的预埋,通过在施工时预埋倾斜管和弯头,使倾斜管和弯头不受到阳光直射,避免阳光中的紫外线和光照刺激水中溶解物质的沉淀和结晶,减缓了水垢的生成,预埋管道的阴暗环境有助于减缓水垢的生成速度,通过测量仪器确定给水管的位置和高度,避免安装失误。
Water supply pipeline construction method for preventing water leakage and moisture regain and pipeline connecting device
The invention relates to the technical field of water supply pipeline construction, in particular to a water supply pipeline construction method for preventing water leakage and moisture regain and a pipeline connecting device.The water supply pipeline construction method for preventing water leakage and moisture regain comprises the steps that the connection position of a water supply pipe is found out according to a building construction drawing and measured, and the position and height of the water supply pipe are marked according to the measurement result; after beam plate reinforcement cage construction is completed and before concrete is poured, an inclined pipe is pre-buried according to marks, and the two ends of the inclined pipe are connected with elbows correspondingly; concrete is poured on a beam plate reinforcement cage, a structural plate is formed, pre-burying of the water supply pipe is completed, the inclined pipe and the elbow are prevented from being directly irradiated by sunlight by pre-burying the inclined pipe and the elbow during construction, ultraviolet rays and light in the sunlight are prevented from stimulating precipitation and crystallization of dissolved substances in water, generation of scale is slowed down, and the service life of the water supply pipe is prolonged. The dark environment of the pre-buried pipeline is beneficial for reducing the generation speed of scale, the position and height of the water supply pipe are determined through the measuring instrument, and installation errors are avoided.
本发明涉及给水管道施工技术领域,尤其是一种防漏水返潮的给水管道施工方法及管道连接装置,其防漏水返潮的给水管道施工方法包括,根据建筑施工图找出给水管接驳位置并进行测量,根据测量结果对给水管的位置和高度进行标注;在梁板钢筋笼施工完成后浇筑混凝土前,根据标注预埋倾斜管,在倾斜管的两端分别连接弯头;往梁板钢筋笼上浇筑混凝土,形成结构板,完成给水管的预埋,通过在施工时预埋倾斜管和弯头,使倾斜管和弯头不受到阳光直射,避免阳光中的紫外线和光照刺激水中溶解物质的沉淀和结晶,减缓了水垢的生成,预埋管道的阴暗环境有助于减缓水垢的生成速度,通过测量仪器确定给水管的位置和高度,避免安装失误。
Water supply pipeline construction method for preventing water leakage and moisture regain and pipeline connecting device
一种防漏水返潮的给水管道施工方法及管道连接装置
DIAO ZHAOYONG (Autor:in) / YANG SHANGYU (Autor:in) / LIANG JIANGXIN (Autor:in) / DENG LIJIAO (Autor:in) / CHEN YUJIE (Autor:in)
12.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
/
E03C
DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER
,
Hausinstallationen für Frisch- oder Abwasser
/
E04G
SCAFFOLDING
,
Baugerüste
/
F16L
PIPES
,
Rohre
Construction method for preventing seepage and water leakage of concrete socket type pipeline
Europäisches Patentamt | 2020
|Municipal water supply and drainage pipeline connecting structure
Europäisches Patentamt | 2020
|Construction method for municipal water supply pipeline
Europäisches Patentamt | 2021
|Water supply and drainage pipeline construction method and device
Europäisches Patentamt | 2023
|Municipal water supply and drainage pipeline construction device
Europäisches Patentamt | 2024
|