Construction process of concrete-based carborundum high-wear-resistance terrace
The invention discloses a concrete-based carborundum high-wear-resistance terrace construction process which comprises the following steps: treating a base layer, and cleaning dust and sundries on the surface of the base layer; formwork installation and reinforcing steel bar binding are conducted, specifically, formworks are installed on the side edge of the base layer, a pouring cavity is formed, and reinforcing steel bars are bound and fixed in the pouring cavity; concrete is poured, and concrete is poured into the pouring cavity to form a concrete layer; carborundum is laid and scattered, and the carborundum is evenly laid and scattered on the surface of the concrete layer; leveling is conducted, specifically, the surface of the concrete layer is leveled through a laser leveling machine; according to the method, carborundum is spread on the surface of concrete, and the carborundum and a concrete layer form a super-strong hardened surface layer after overall solidification, so that the compression resistance, impact resistance and wear resistance of the surface of the concrete floor are effectively improved, and the service life of the surface of the concrete floor is effectively prolonged; and the maintenance frequency is reduced, so that the maintenance cost is effectively reduced.
本发明公开了一种混凝土基金刚砂高耐磨地坪施工工艺,包括以下步骤,基层处理,清理基层表面的灰尘和杂物;模板安装及钢筋绑扎,在基层侧边安装模板并形成浇筑腔,在浇筑腔内绑扎固定钢筋;浇筑混凝土,往浇筑腔内浇筑混凝土形成混凝土层;铺撒金刚砂,将金刚砂均匀的铺洒在混凝土层表面;整平,用激光整平机对混凝土层表面进行整平;切缝养护,进行切缝操作,对成品的混凝土地坪进行水养护,通过在混凝土表面铺撒金刚砂,经整体固化后与混凝土层形成一个超强硬化面层,有效提高混凝土地坪表面的抗压、抗冲击以及耐磨损性能,有效延长混凝土地坪表面的使用寿命,降低维修的频率,进而有效降低维修成本。
Construction process of concrete-based carborundum high-wear-resistance terrace
The invention discloses a concrete-based carborundum high-wear-resistance terrace construction process which comprises the following steps: treating a base layer, and cleaning dust and sundries on the surface of the base layer; formwork installation and reinforcing steel bar binding are conducted, specifically, formworks are installed on the side edge of the base layer, a pouring cavity is formed, and reinforcing steel bars are bound and fixed in the pouring cavity; concrete is poured, and concrete is poured into the pouring cavity to form a concrete layer; carborundum is laid and scattered, and the carborundum is evenly laid and scattered on the surface of the concrete layer; leveling is conducted, specifically, the surface of the concrete layer is leveled through a laser leveling machine; according to the method, carborundum is spread on the surface of concrete, and the carborundum and a concrete layer form a super-strong hardened surface layer after overall solidification, so that the compression resistance, impact resistance and wear resistance of the surface of the concrete floor are effectively improved, and the service life of the surface of the concrete floor is effectively prolonged; and the maintenance frequency is reduced, so that the maintenance cost is effectively reduced.
本发明公开了一种混凝土基金刚砂高耐磨地坪施工工艺,包括以下步骤,基层处理,清理基层表面的灰尘和杂物;模板安装及钢筋绑扎,在基层侧边安装模板并形成浇筑腔,在浇筑腔内绑扎固定钢筋;浇筑混凝土,往浇筑腔内浇筑混凝土形成混凝土层;铺撒金刚砂,将金刚砂均匀的铺洒在混凝土层表面;整平,用激光整平机对混凝土层表面进行整平;切缝养护,进行切缝操作,对成品的混凝土地坪进行水养护,通过在混凝土表面铺撒金刚砂,经整体固化后与混凝土层形成一个超强硬化面层,有效提高混凝土地坪表面的抗压、抗冲击以及耐磨损性能,有效延长混凝土地坪表面的使用寿命,降低维修的频率,进而有效降低维修成本。
Construction process of concrete-based carborundum high-wear-resistance terrace
一种混凝土基金刚砂高耐磨地坪施工工艺
XU KE (Autor:in) / YANG HAIPING (Autor:in) / XU LIFEN (Autor:in) / HE TING (Autor:in) / YE CIBIAO (Autor:in)
12.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Europäisches Patentamt | 2024
|Flatness control method for large-area carborundum wear-resistant terrace
Europäisches Patentamt | 2021
|Carborundum anti-cracking damp-proof terrace construction method
Europäisches Patentamt | 2020
|