Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Anti-blocking method for water-passing pavement pipe culvert
An anti-blocking method for a water-passing pavement pipe culvert comprises the following steps that firstly, when the water-passing pavement of a culvert pipe is constructed, an embedded connecting assembly is installed, and the embedded connecting assembly and concrete are poured into a whole; secondly, in the flood season or when the flow is large, a conical net is machined, and the assembly length of the conical net is larger than the river channel garbage floating width; the conical net is connected with the pre-buried connecting assembly, so that the conical net is fixed to a pipe culvert water inlet on the upstream of the water passing pavement; thirdly, upstream water flow enters the pipe culvert through the conical net and flows downstream, and garbage is guided to the outer side of a water inlet of the pipe culvert through the conical net; and 4, in the dry season or when the water flow is small, the local structure of the conical net is taken down, the large-diameter end of the conical net is connected with the chassis and arranged at the water inlet of the pipe culvert on the upstream of the water passing pavement, the device is pulled to move from the water inlet end of the pipe culvert to the water outlet end of the pipe culvert, and blockages in the culvert pipe are cleaned. According to the anti-blocking method for the water-passing pavement pipe culvert, blocking can be prevented in the flood season or the dry season.
一种过水路面管涵防堵方法,包括以下步骤:步骤一:在涵管过水路面施工时,对预埋连接组件进行安装并与混凝土浇筑成一体;步骤二:在汛期或流量较大时,加工锥形网,锥形网的组装长度大于河道垃圾漂浮宽度;将锥形网与预埋连接组件连接,使锥形网固定于过水路面上游的管涵进水口处;步骤三:上游水流通过锥形网进入管涵,流向下游,垃圾则被锥形网引到管涵的进水口外侧;步骤四:在枯水期或水流较小时,取下锥形网的局部结构,将锥形网大径端与底盘连接并置于过水路面上游的管涵进水口处,牵引本装置从管涵进水口一端移向出水口一端,对涵管内部的堵塞物进行清理。本发明提供的一种过水路面管涵防堵方法,无论汛期还是枯水期,均可防堵塞。
Anti-blocking method for water-passing pavement pipe culvert
An anti-blocking method for a water-passing pavement pipe culvert comprises the following steps that firstly, when the water-passing pavement of a culvert pipe is constructed, an embedded connecting assembly is installed, and the embedded connecting assembly and concrete are poured into a whole; secondly, in the flood season or when the flow is large, a conical net is machined, and the assembly length of the conical net is larger than the river channel garbage floating width; the conical net is connected with the pre-buried connecting assembly, so that the conical net is fixed to a pipe culvert water inlet on the upstream of the water passing pavement; thirdly, upstream water flow enters the pipe culvert through the conical net and flows downstream, and garbage is guided to the outer side of a water inlet of the pipe culvert through the conical net; and 4, in the dry season or when the water flow is small, the local structure of the conical net is taken down, the large-diameter end of the conical net is connected with the chassis and arranged at the water inlet of the pipe culvert on the upstream of the water passing pavement, the device is pulled to move from the water inlet end of the pipe culvert to the water outlet end of the pipe culvert, and blockages in the culvert pipe are cleaned. According to the anti-blocking method for the water-passing pavement pipe culvert, blocking can be prevented in the flood season or the dry season.
一种过水路面管涵防堵方法,包括以下步骤:步骤一:在涵管过水路面施工时,对预埋连接组件进行安装并与混凝土浇筑成一体;步骤二:在汛期或流量较大时,加工锥形网,锥形网的组装长度大于河道垃圾漂浮宽度;将锥形网与预埋连接组件连接,使锥形网固定于过水路面上游的管涵进水口处;步骤三:上游水流通过锥形网进入管涵,流向下游,垃圾则被锥形网引到管涵的进水口外侧;步骤四:在枯水期或水流较小时,取下锥形网的局部结构,将锥形网大径端与底盘连接并置于过水路面上游的管涵进水口处,牵引本装置从管涵进水口一端移向出水口一端,对涵管内部的堵塞物进行清理。本发明提供的一种过水路面管涵防堵方法,无论汛期还是枯水期,均可防堵塞。
Anti-blocking method for water-passing pavement pipe culvert
一种过水路面管涵防堵方法
CHENG XIN (Autor:in) / QIN XUE (Autor:in) / YOU CAN (Autor:in) / CHENG SHENWEI (Autor:in) / ZHU DAN (Autor:in) / LI CHUNYANG (Autor:in) / GAO WEI (Autor:in) / ZHOU XINYU (Autor:in) / LIU GUANGZE (Autor:in) / LU LIANGHUI (Autor:in)
16.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E03F
SEWERS
,
Abwasserkanäle
Mountainous area flood gully culvert pipe anti-blocking device
Europäisches Patentamt | 2024
|Water passing box culvert connection construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|