Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cantilever aerial platform hydraulic synchronous lifting system and method
The invention discloses a cantilever aerial platform hydraulic synchronous lifting system and method, and relates to the technical field of building lifting, the device is arranged between a first main building frame and a second main building frame, the device comprises an assembly jig frame arranged between the first main building frame and the second main building frame, and a suspension aerial platform is arranged on the assembly jig frame; a lifting unit is further arranged between the first main building frame and the second main building frame, an upward lifting mechanism is arranged on the suspended aerial platform, a steel strand is connected between the lifting unit and the upward lifting mechanism, and a first force measuring unit is arranged between the upward lifting mechanism and the steel strand; the lifting unit and the first force measuring unit are connected with a control system; the four lifting mechanisms can be always kept on the same horizontal plane in the lifting process of the suspended aerial platform, so that the synchronization precision of the lifting process of the suspended aerial platform is improved, and the high synchronization of the suspended aerial platform can be ensured even in a severe high-altitude operation environment.
本发明公开了一种悬挑空中平台液压同步提升系统及方法,涉及建筑提升技术领域,该装置设于第一主楼框架与第二主楼框架之间,包括设于第一主楼框架与第二主楼框架之间的拼装胎架,拼装胎架上设有悬吊空中平台,第一主楼框架与第二主楼框架之间还设有提升单元,悬吊空中平台上设有上吊机构,提升单元与上吊机构之间连接有钢绞线,上吊机构与钢绞线之间设有第一测力单元;提升单元、第一测力单元均连接有控制系统;能够在悬吊空中平台吊装过程中使四个上吊机构始终保持在同一水平面上,从而提升悬吊空中平台吊装过程的同步精度,即使在恶劣的高空作业环境下也能保证悬吊空中平台的高度同步。
Cantilever aerial platform hydraulic synchronous lifting system and method
The invention discloses a cantilever aerial platform hydraulic synchronous lifting system and method, and relates to the technical field of building lifting, the device is arranged between a first main building frame and a second main building frame, the device comprises an assembly jig frame arranged between the first main building frame and the second main building frame, and a suspension aerial platform is arranged on the assembly jig frame; a lifting unit is further arranged between the first main building frame and the second main building frame, an upward lifting mechanism is arranged on the suspended aerial platform, a steel strand is connected between the lifting unit and the upward lifting mechanism, and a first force measuring unit is arranged between the upward lifting mechanism and the steel strand; the lifting unit and the first force measuring unit are connected with a control system; the four lifting mechanisms can be always kept on the same horizontal plane in the lifting process of the suspended aerial platform, so that the synchronization precision of the lifting process of the suspended aerial platform is improved, and the high synchronization of the suspended aerial platform can be ensured even in a severe high-altitude operation environment.
本发明公开了一种悬挑空中平台液压同步提升系统及方法,涉及建筑提升技术领域,该装置设于第一主楼框架与第二主楼框架之间,包括设于第一主楼框架与第二主楼框架之间的拼装胎架,拼装胎架上设有悬吊空中平台,第一主楼框架与第二主楼框架之间还设有提升单元,悬吊空中平台上设有上吊机构,提升单元与上吊机构之间连接有钢绞线,上吊机构与钢绞线之间设有第一测力单元;提升单元、第一测力单元均连接有控制系统;能够在悬吊空中平台吊装过程中使四个上吊机构始终保持在同一水平面上,从而提升悬吊空中平台吊装过程的同步精度,即使在恶劣的高空作业环境下也能保证悬吊空中平台的高度同步。
Cantilever aerial platform hydraulic synchronous lifting system and method
一种悬挑空中平台液压同步提升系统及方法
ZHUANG XIUQING (Autor:in) / CAI GENZAI (Autor:in) / ZHANG ZUKUI (Autor:in) / ZHOU GUANGWEI (Autor:in) / ZHOU XIANQI (Autor:in) / LIN JINNA (Autor:in) / LIU SIDE (Autor:in) / WEN QIFU (Autor:in) / MA AOLING (Autor:in)
16.07.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Large-span cantilever truss integral lifting hydraulic press platform
Europäisches Patentamt | 2021
|