Arrangement method of ultrahigh steep slope gully debris protection structure
The invention discloses an arrangement method of an ultrahigh steep slope gully chipping protection structure, and belongs to the technical field of slope engineering governance. The arrangement method comprises intercepting and dredging nets arranged along the elevation of a gully, and buffering energy dissipation platforms and energy dissipation piles are arranged between the intercepting and dredging nets; the deslagging vertical shaft is arranged at the position of the buffering energy dissipation platform and the energy dissipation pile excavation side slope riding track along the same horizontal height, the deslagging tunnel is connected with the deslagging vertical shaft, the slag collecting structure is arranged at the bottom of the gully, the protective net is arranged on the excavation side slope riding track on the lower portion of the slag collecting structure, and the anti-collision wall is arranged at the slope toe. The ends, away from the slope, of the connecting beams are fixedly connected with the slope anti-collision wall, the ends, close to the slope, of the connecting beams are fixed to the slope, and a stone collecting groove is formed in the slope toe. Through mutual cooperation and combined action of structures such as the intercepting and dredging net and the like, graded guiding, on-way energy dissipation, graded blocking and dynamic cleaning of gully debris flow are achieved, so that the debris flow is systematically treated, and potential safety hazards caused by the gully debris flow to engineering are relieved.
本发明公开了一种超高陡边坡冲沟碎屑防护结构的布置方法,属于边坡工程治理技术领域,包括沿冲沟高程设置的拦截疏导网,缓冲消能平台和消能桩设置于拦截疏导网之间,出渣竖井沿同一水平高度布置于缓冲消能平台和消能桩开挖边坡马道处,出渣隧洞与出渣竖井相连接,集渣结构布置于冲沟底部,防护网布置于集渣结构下部开挖边坡马道上,防撞墙布置于坡脚,联系梁远离边坡一端与边坡防撞墙固定相接,联系梁的靠近边坡一端固定于边坡上,坡脚设置有集石槽;通过设置的拦截疏导网等结构的相互配合和共同作用,实现了对冲沟碎屑流的分级引导、沿程消能、分级拦挡和动态清理,从而对碎屑流进行系统治理,缓解了冲沟碎屑流对工程造成的安全隐患。
Arrangement method of ultrahigh steep slope gully debris protection structure
The invention discloses an arrangement method of an ultrahigh steep slope gully chipping protection structure, and belongs to the technical field of slope engineering governance. The arrangement method comprises intercepting and dredging nets arranged along the elevation of a gully, and buffering energy dissipation platforms and energy dissipation piles are arranged between the intercepting and dredging nets; the deslagging vertical shaft is arranged at the position of the buffering energy dissipation platform and the energy dissipation pile excavation side slope riding track along the same horizontal height, the deslagging tunnel is connected with the deslagging vertical shaft, the slag collecting structure is arranged at the bottom of the gully, the protective net is arranged on the excavation side slope riding track on the lower portion of the slag collecting structure, and the anti-collision wall is arranged at the slope toe. The ends, away from the slope, of the connecting beams are fixedly connected with the slope anti-collision wall, the ends, close to the slope, of the connecting beams are fixed to the slope, and a stone collecting groove is formed in the slope toe. Through mutual cooperation and combined action of structures such as the intercepting and dredging net and the like, graded guiding, on-way energy dissipation, graded blocking and dynamic cleaning of gully debris flow are achieved, so that the debris flow is systematically treated, and potential safety hazards caused by the gully debris flow to engineering are relieved.
本发明公开了一种超高陡边坡冲沟碎屑防护结构的布置方法,属于边坡工程治理技术领域,包括沿冲沟高程设置的拦截疏导网,缓冲消能平台和消能桩设置于拦截疏导网之间,出渣竖井沿同一水平高度布置于缓冲消能平台和消能桩开挖边坡马道处,出渣隧洞与出渣竖井相连接,集渣结构布置于冲沟底部,防护网布置于集渣结构下部开挖边坡马道上,防撞墙布置于坡脚,联系梁远离边坡一端与边坡防撞墙固定相接,联系梁的靠近边坡一端固定于边坡上,坡脚设置有集石槽;通过设置的拦截疏导网等结构的相互配合和共同作用,实现了对冲沟碎屑流的分级引导、沿程消能、分级拦挡和动态清理,从而对碎屑流进行系统治理,缓解了冲沟碎屑流对工程造成的安全隐患。
Arrangement method of ultrahigh steep slope gully debris protection structure
一种超高陡边坡冲沟碎屑防护结构的布置方法
SUN WEI (Autor:in) / ZHANG HEZUO (Autor:in) / LIN JINCHENG (Autor:in) / ZHANG HENG (Autor:in) / KONG YUTIAN (Autor:in) / BAO WEI (Autor:in) / LONG YIBIN (Autor:in) / YANG DONG (Autor:in) / WANG FANG (Autor:in) / CHEN ZHILIANG (Autor:in)
19.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E03F
SEWERS
,
Abwasserkanäle
Scaffold structure for ultrahigh steep rock slope surface