Construction method of waterproof structure at slab staggering position of basement bottom plate
The invention discloses a construction method for a waterproof structure at the staggered slab position of a basement bottom plate. The construction method for the waterproof structure at the staggered slab position of the basement bottom plate comprises the following steps that S1, a pouring supporting system corresponding to a basement side wall and a staggered slab bottom plate structure is erected; s2, a slab staggering bottom plate pouring formwork and a basement side wall pouring formwork are laid; s3, a pre-laid self-adhesive film waterproof roll is laid on the slab staggering bottom plate pouring formwork; s4, basement side walls and staggered slab bottom plate structural steel bars are bound, and concrete is poured; s5, the pouring supporting system, the slab staggering bottom plate pouring formwork and the basement side wall pouring formwork are dismantled; and S6, side wall waterproof coiled materials are constructed, and the side wall waterproof coiled materials are in lap joint with the bottom plate waterproof coiled materials. By means of the method, the waterproof construction process at the staggered slab position of a traditional basement bottom plate is changed, and the waterproof construction efficiency and construction quality are improved.
本发明公开了一种地下室底板错台处防水构造施工方法,所述地下室底板错台处防水构造施工方法包括如下步骤:S1:搭设地下室侧墙以及错台底板结构对应的浇筑支撑系统;S2:铺设错台底板浇筑模板及地下室侧墙浇筑模板;S3:于错台底板浇筑模板上铺设预铺式自粘胶膜防水卷材;S4:绑扎地下室侧墙以及错台底板结构钢筋并浇筑混凝土;S5:拆除浇筑支撑系统、错台底板浇筑模板及地下室侧墙浇筑模板;S6:施工侧墙防水卷材,并与底板防水卷材进行搭接。通过本发明方法改变了传统地下室底板错台处防水施工流程,提升了防水施工效率及施工质量。
Construction method of waterproof structure at slab staggering position of basement bottom plate
The invention discloses a construction method for a waterproof structure at the staggered slab position of a basement bottom plate. The construction method for the waterproof structure at the staggered slab position of the basement bottom plate comprises the following steps that S1, a pouring supporting system corresponding to a basement side wall and a staggered slab bottom plate structure is erected; s2, a slab staggering bottom plate pouring formwork and a basement side wall pouring formwork are laid; s3, a pre-laid self-adhesive film waterproof roll is laid on the slab staggering bottom plate pouring formwork; s4, basement side walls and staggered slab bottom plate structural steel bars are bound, and concrete is poured; s5, the pouring supporting system, the slab staggering bottom plate pouring formwork and the basement side wall pouring formwork are dismantled; and S6, side wall waterproof coiled materials are constructed, and the side wall waterproof coiled materials are in lap joint with the bottom plate waterproof coiled materials. By means of the method, the waterproof construction process at the staggered slab position of a traditional basement bottom plate is changed, and the waterproof construction efficiency and construction quality are improved.
本发明公开了一种地下室底板错台处防水构造施工方法,所述地下室底板错台处防水构造施工方法包括如下步骤:S1:搭设地下室侧墙以及错台底板结构对应的浇筑支撑系统;S2:铺设错台底板浇筑模板及地下室侧墙浇筑模板;S3:于错台底板浇筑模板上铺设预铺式自粘胶膜防水卷材;S4:绑扎地下室侧墙以及错台底板结构钢筋并浇筑混凝土;S5:拆除浇筑支撑系统、错台底板浇筑模板及地下室侧墙浇筑模板;S6:施工侧墙防水卷材,并与底板防水卷材进行搭接。通过本发明方法改变了传统地下室底板错台处防水施工流程,提升了防水施工效率及施工质量。
Construction method of waterproof structure at slab staggering position of basement bottom plate
一种地下室底板错台处防水构造施工方法
MAO YUNTAO (Autor:in) / FENG MIN (Autor:in) / QIAO HONGDE (Autor:in) / QIN YONGHONG (Autor:in) / YANG CHAO (Autor:in) / CHE GUOCHENG (Autor:in) / ZHU QINGJIANG (Autor:in) / DENG KUANHONG (Autor:in)
19.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Basement bottom plate waterproof structure and construction method thereof
Europäisches Patentamt | 2021
|Basement bottom plate waterproof layer construction structure and construction method
Europäisches Patentamt | 2023
|Basement bottom plate waterproof structure and construction process thereof
Europäisches Patentamt | 2021
|