Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the technical field of screeding wall-driving construction processes, in particular to a screeding wall-driving building decoration construction process. The screeding wall-driving building decoration construction process aims at solving the technical problems that in the prior art, a wall face is leveled only through mortar, reinforcing steel bars are not added, the anti-seismic property of a building cannot be improved, and the squareness of the treated building is poor. According to the technical scheme, the screeding wall-driving building decoration construction technology comprises the following steps that firstly, a wall surface is cleaned; 2, drawing a line; step 3, screeding; 4, leveling is conducted; 5, external corner treatment; and 6, maintenance is conducted. The steel bars are combined with the concrete slurry, so that the stability of the steel bars in a wall is ensured, the stability of the wall is facilitated, the wall is effectively prevented from cracking, the anti-seismic characteristic is enhanced, the squareness of a building is effectively improved through leveling treatment in multiple modes, and it is ensured that decorations or furniture can be well attached to the wall; and the aesthetic degree of building decoration is ensured.
本发明涉及冲筋赶墙施工工艺技术领域,尤其涉及一种冲筋赶墙建筑装修施工工艺。技术问题:该冲筋赶墙建筑装修施工工艺旨在解决现有技术下仅通过砂浆对墙面进行找平,而没有加入钢筋,不能提高建筑的抗震性能,处理后的建筑方正性较差的技术问题。技术方案:一种冲筋赶墙建筑装修施工工艺,其步骤如下:步骤一:清理墙面;步骤二:绘线;步骤三:冲筋;步骤四:找平;步骤五:阳角处理;步骤六:养护。本发明钢筋与混凝土浆料相结合,确保钢筋在墙体内的稳定性,同样有助于墙面稳定性,有效的防止墙体开裂,增强了抗震的特性,通过多种方式的找平处理,有效提高建筑的方正性,确保装饰物或家具可以与墙面很好的贴合,保证了建筑装修的美观度。
The invention relates to the technical field of screeding wall-driving construction processes, in particular to a screeding wall-driving building decoration construction process. The screeding wall-driving building decoration construction process aims at solving the technical problems that in the prior art, a wall face is leveled only through mortar, reinforcing steel bars are not added, the anti-seismic property of a building cannot be improved, and the squareness of the treated building is poor. According to the technical scheme, the screeding wall-driving building decoration construction technology comprises the following steps that firstly, a wall surface is cleaned; 2, drawing a line; step 3, screeding; 4, leveling is conducted; 5, external corner treatment; and 6, maintenance is conducted. The steel bars are combined with the concrete slurry, so that the stability of the steel bars in a wall is ensured, the stability of the wall is facilitated, the wall is effectively prevented from cracking, the anti-seismic characteristic is enhanced, the squareness of a building is effectively improved through leveling treatment in multiple modes, and it is ensured that decorations or furniture can be well attached to the wall; and the aesthetic degree of building decoration is ensured.
本发明涉及冲筋赶墙施工工艺技术领域,尤其涉及一种冲筋赶墙建筑装修施工工艺。技术问题:该冲筋赶墙建筑装修施工工艺旨在解决现有技术下仅通过砂浆对墙面进行找平,而没有加入钢筋,不能提高建筑的抗震性能,处理后的建筑方正性较差的技术问题。技术方案:一种冲筋赶墙建筑装修施工工艺,其步骤如下:步骤一:清理墙面;步骤二:绘线;步骤三:冲筋;步骤四:找平;步骤五:阳角处理;步骤六:养护。本发明钢筋与混凝土浆料相结合,确保钢筋在墙体内的稳定性,同样有助于墙面稳定性,有效的防止墙体开裂,增强了抗震的特性,通过多种方式的找平处理,有效提高建筑的方正性,确保装饰物或家具可以与墙面很好的贴合,保证了建筑装修的美观度。
Construction technology for screeding and wall-driving building decoration
一种冲筋赶墙建筑装修施工工艺
LIU FENG (Autor:in)
19.07.2024
Patent
Elektronische Ressource
Chinesisch
Screeding and wall driving type building decoration construction process
Europäisches Patentamt | 2021
|Screeding manufacturing method for wall decoration gypsum plaster
Europäisches Patentamt | 2020
|Screeding leveling device for wall screeding and screeding leveling method
Europäisches Patentamt | 2021
|Wall screeding leveling auxiliary device for building construction
Europäisches Patentamt | 2023
|