Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated temporarily-built road and construction method thereof
The fabricated temporarily-built road comprises a first assembly body which is spliced to form a road surface and a second assembly body which is spliced to form a drainage ditch foundation trench, the first assembly body comprises a shell and a first plate body which is formed by pouring steel fiber reinforced concrete, and water guiding grooves are inwards formed in the side walls of the periphery of the first assembly body; a plurality of first threaded holes for hoisting are formed in the top surface of the first assembly body; the second assembly body comprises a U-shaped second plate body formed by pouring steel fiber reinforced concrete, a plurality of second threaded holes used for hoisting are formed in an opening in the upper portion of the second plate body, and a rainwater grate is further arranged at the opening of the second plate body in a matched mode. The pavement and the drainage ditches of the structure are formed by splicing the assembly bodies prefabricated and formed in a factory, field splicing construction is very simple and convenient, the construction period can be greatly shortened, the construction efficiency is improved, a large number of building construction materials are saved, and the structure is more economical and environmentally friendly.
本发明公开了一种装配式临建道路,包括拼接组成道路路面的第一装配体和拼接组成排水沟基槽的第二装配体,第一装配体包括外壳和钢纤维混凝土浇筑而成的第一板体,第一装配体四周侧壁上向内开设有导水槽,所述第一装配体的顶面上设有多个用于吊装的第一螺纹孔;所述第二装配体包括由钢纤维混凝土浇筑而成、U型设计的第二板体,第二板体的上方开口处设有多个用于吊装的第二螺纹孔,且第二板体开口处还配套设有雨水箅子。该结构的路面和排水沟均由工厂预制成型的装配体拼接而成,现场拼装施工十分简答便捷,能够极大缩短工期,提高施工效率,节省了大量建筑施工材料,更加经济环保。
Fabricated temporarily-built road and construction method thereof
The fabricated temporarily-built road comprises a first assembly body which is spliced to form a road surface and a second assembly body which is spliced to form a drainage ditch foundation trench, the first assembly body comprises a shell and a first plate body which is formed by pouring steel fiber reinforced concrete, and water guiding grooves are inwards formed in the side walls of the periphery of the first assembly body; a plurality of first threaded holes for hoisting are formed in the top surface of the first assembly body; the second assembly body comprises a U-shaped second plate body formed by pouring steel fiber reinforced concrete, a plurality of second threaded holes used for hoisting are formed in an opening in the upper portion of the second plate body, and a rainwater grate is further arranged at the opening of the second plate body in a matched mode. The pavement and the drainage ditches of the structure are formed by splicing the assembly bodies prefabricated and formed in a factory, field splicing construction is very simple and convenient, the construction period can be greatly shortened, the construction efficiency is improved, a large number of building construction materials are saved, and the structure is more economical and environmentally friendly.
本发明公开了一种装配式临建道路,包括拼接组成道路路面的第一装配体和拼接组成排水沟基槽的第二装配体,第一装配体包括外壳和钢纤维混凝土浇筑而成的第一板体,第一装配体四周侧壁上向内开设有导水槽,所述第一装配体的顶面上设有多个用于吊装的第一螺纹孔;所述第二装配体包括由钢纤维混凝土浇筑而成、U型设计的第二板体,第二板体的上方开口处设有多个用于吊装的第二螺纹孔,且第二板体开口处还配套设有雨水箅子。该结构的路面和排水沟均由工厂预制成型的装配体拼接而成,现场拼装施工十分简答便捷,能够极大缩短工期,提高施工效率,节省了大量建筑施工材料,更加经济环保。
Fabricated temporarily-built road and construction method thereof
一种装配式临建道路及其施工方法
LI DAOJIE (Autor:in) / ZHANG LIWEI (Autor:in) / CHEN KUNPENG (Autor:in) / ZHU LINTAO (Autor:in) / WANG LITAO (Autor:in) / WU DONGCHANG (Autor:in) / KANG JINWEI (Autor:in)
26.07.2024
Patent
Elektronische Ressource
Chinesisch
Temporarily-built fabricated building base fixing structure
Europäisches Patentamt | 2023
|Temporarily-built inner wall surface construction method
Europäisches Patentamt | 2024
|Solar hot water supply method for construction of temporarily-built board room
Europäisches Patentamt | 2022
|Enclosure device for temporarily paving road and using method thereof
Europäisches Patentamt | 2020
|