Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile foundation and method for using pile foundation
The embodiment of the invention relates to the technical field of underwater construction, in particular to a pile foundation and a method for using the pile foundation, the pile foundation comprises two or more suction piles, connecting pieces, two or more branch pipes, a collecting manifold and two or more valves, and the suction piles are connected through the connecting pieces; one end of one branch pipe is connected to the internal space of one suction pile; the converging manifold is connected with the other ends of all the branch pipes, the converging manifold is provided with a first connecting port, and the first connecting port is used for being connected with a suction pump; one valve is arranged on one branch pipe, and one valve is used for controlling the closing and opening of one branch pipe and the flow of one branch pipe; when the pile foundation is installed to sink or withdrawn to be upwards pulled, the inner space of each suction pile is finally connected to the suction pump through the branch pipe, the valve and the confluence manifold. By means of the mode, the levelness of the pile foundation can be better adjusted.
本发明实施例涉及水下施工技术领域,特别涉及一种桩基及使用桩基的方法,桩基包括两根或两根以上吸力桩、连接件、两根或两根以上支管、汇流管汇和两个或两个以上阀门,各所述吸力桩之间通过所述连接件连接;一所述支管的一端连接于一所述吸力桩的内部空间;汇流管汇与所有所述支管的另一端连接,并且所述汇流管汇设置有第一连接口,所述第一连接口用于与吸力泵连接;一所述阀门设置于一所述支管,一所述阀门用于控制一所述支管的关闭和开启以及一所述支管的流量;其中,当所述桩基安装下沉或回收上拔时,各所述吸力桩的内部空间通过所述支管、阀门和汇流管汇最终连接至所述吸力泵。通过上述方式,本发明实施例能够更好的调整桩基的水平度。
Pile foundation and method for using pile foundation
The embodiment of the invention relates to the technical field of underwater construction, in particular to a pile foundation and a method for using the pile foundation, the pile foundation comprises two or more suction piles, connecting pieces, two or more branch pipes, a collecting manifold and two or more valves, and the suction piles are connected through the connecting pieces; one end of one branch pipe is connected to the internal space of one suction pile; the converging manifold is connected with the other ends of all the branch pipes, the converging manifold is provided with a first connecting port, and the first connecting port is used for being connected with a suction pump; one valve is arranged on one branch pipe, and one valve is used for controlling the closing and opening of one branch pipe and the flow of one branch pipe; when the pile foundation is installed to sink or withdrawn to be upwards pulled, the inner space of each suction pile is finally connected to the suction pump through the branch pipe, the valve and the confluence manifold. By means of the mode, the levelness of the pile foundation can be better adjusted.
本发明实施例涉及水下施工技术领域,特别涉及一种桩基及使用桩基的方法,桩基包括两根或两根以上吸力桩、连接件、两根或两根以上支管、汇流管汇和两个或两个以上阀门,各所述吸力桩之间通过所述连接件连接;一所述支管的一端连接于一所述吸力桩的内部空间;汇流管汇与所有所述支管的另一端连接,并且所述汇流管汇设置有第一连接口,所述第一连接口用于与吸力泵连接;一所述阀门设置于一所述支管,一所述阀门用于控制一所述支管的关闭和开启以及一所述支管的流量;其中,当所述桩基安装下沉或回收上拔时,各所述吸力桩的内部空间通过所述支管、阀门和汇流管汇最终连接至所述吸力泵。通过上述方式,本发明实施例能够更好的调整桩基的水平度。
Pile foundation and method for using pile foundation
一种桩基及使用桩基的方法
DU SENJIE (Autor:in) / LIN RUI (Autor:in) / XU LEI (Autor:in) / CHEN QICHUAN (Autor:in) / CAI PENGHAN (Autor:in)
26.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2015
|FOUNDATION PILE AND FOUNDATION CONSTRUCTION METHOD USING THE FOUNDATION PILE
Europäisches Patentamt | 2019
|Pile foundation and pile foundation installation method
Europäisches Patentamt | 2016
|PILE FOUNDATION REPAIR METHOD, PILE FOUNDATION REPAIR KIT, AND PILE FOUNDATION STRUCTURE
Europäisches Patentamt | 2016
|