Overall construction method for special-shaped cornice of metal roof
The invention discloses an integral construction method for a special-shaped cornice of a metal roof, which comprises the following steps of: S1, scanning a main body by using a 3D scanner according to a design drawing, retesting main control points by using a precision total station, and establishing a cornice keel model; s2, dividing into a plurality of assembly units according to the eave keel model; s3, exporting a processing dimension diagram of the cornice keel, and then splicing on site; s4, a keel is welded, then anti-corrosion treatment is conducted, aluminum veneers are installed, and inlaying plate blocks are reserved; s5, the framework and the structural rod piece are welded and fixed, and then anti-corrosion treatment is conducted; s6, the reserved plates are inlayed, and the plate joints of the aluminum veneers are glued. While the construction quality is guaranteed, the measure cost is saved, the construction period is shortened, and an interpenetration space is provided for cross line production.
本发明公开一种金属屋面异型檐口整体施工方法,包括如下步骤:S1、按照设计图纸及利用3D扫描仪扫描主体,后利用精密全站仪对主要控制点进行复测,建立檐口龙骨模型;S2、根据檐口龙骨模型的分多个拼装单元;S3、导出檐口龙骨的加工尺寸图,然后现场拼装;S4、焊接龙骨,随后进行防腐处理及安装铝单板并预留出嵌补板块;S5、将骨架与结构杆件进行焊接固定,随后进行防腐处理;S6、嵌补预留板块及对铝单板的板缝打胶处理,本发明在保障了施工质量的同时,也节约了措施费用、缩短了施工周期,为交叉流水作业提供了穿插的空间。
Overall construction method for special-shaped cornice of metal roof
The invention discloses an integral construction method for a special-shaped cornice of a metal roof, which comprises the following steps of: S1, scanning a main body by using a 3D scanner according to a design drawing, retesting main control points by using a precision total station, and establishing a cornice keel model; s2, dividing into a plurality of assembly units according to the eave keel model; s3, exporting a processing dimension diagram of the cornice keel, and then splicing on site; s4, a keel is welded, then anti-corrosion treatment is conducted, aluminum veneers are installed, and inlaying plate blocks are reserved; s5, the framework and the structural rod piece are welded and fixed, and then anti-corrosion treatment is conducted; s6, the reserved plates are inlayed, and the plate joints of the aluminum veneers are glued. While the construction quality is guaranteed, the measure cost is saved, the construction period is shortened, and an interpenetration space is provided for cross line production.
本发明公开一种金属屋面异型檐口整体施工方法,包括如下步骤:S1、按照设计图纸及利用3D扫描仪扫描主体,后利用精密全站仪对主要控制点进行复测,建立檐口龙骨模型;S2、根据檐口龙骨模型的分多个拼装单元;S3、导出檐口龙骨的加工尺寸图,然后现场拼装;S4、焊接龙骨,随后进行防腐处理及安装铝单板并预留出嵌补板块;S5、将骨架与结构杆件进行焊接固定,随后进行防腐处理;S6、嵌补预留板块及对铝单板的板缝打胶处理,本发明在保障了施工质量的同时,也节约了措施费用、缩短了施工周期,为交叉流水作业提供了穿插的空间。
Overall construction method for special-shaped cornice of metal roof
一种金属屋面异型檐口整体施工方法
ZHU XIAOKANG (Autor:in) / QIAN ZHENPENG (Autor:in) / CHEN GUANGFU (Autor:in) / XU LEI (Autor:in) / ZHU CHENGFENG (Autor:in) / BAI YIJIE (Autor:in) / QUAN YOUWEI (Autor:in)
26.07.2024
Patent
Elektronische Ressource
Chinesisch
Large-angle double-layer cornice roof special-shaped steel structure and construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Cornice structure of ETFE film roof and construction method of cornice structure