Construction method of upright pitched roof insulation board
The invention relates to the technical field of building construction, in particular to a construction method of an upright pitched roof insulation board. Comprising the following steps that S1, according to design requirements, a fixing piece of the heat preservation plate is deeply designed; s2, pitched roof formworks and reinforcing steel bars are installed; s3, fixing parts are pre-buried and fixed on the sloping roof formwork in advance; s4, concrete pouring is conducted on the sloping roof formwork; s5, heat preservation plates are laid on the top of the concrete, and the ends of the fixing pieces are exposed out of the heat preservation plates; s6, the heat preservation plate and the fixing piece are connected; s7, a fine aggregate concrete leveling layer is laid on the outer side of the heat preservation plate; and S8, finally, a waterproof layer is constructed. The purpose of adjusting construction procedures is achieved by replacing a method of mechanically installing the fixing part with the pre-embedded fixing part, and meanwhile, the integrity can be improved, falling off can be avoided and the construction quality can be guaranteed through the pre-embedded mode.
本发明涉及建筑施工技术领域,具体是一种正置式坡屋面保温板施工方法。包括如下步骤:S1:根据设计要求进行保温板的固定件进行深化设计;S2:进行坡屋面模板和钢筋安装;S3:在坡屋面模板上提前对固定件进行预埋固定;S4:在坡屋面模板上进行混凝土浇筑;S5:在混凝土顶部进行保温板铺设,固定件的端部露在保温板外侧;S6:将保温板和固定件进行连接;S7:在保温板外侧铺设细石混凝土找平层;S8:最后进行防水层的施工。通过预埋固定件替代机械安装固定件的方法,达到调整施工工序的目的,同时利用预埋的方式可以增加整体性,避免脱落,保证施工质量。
Construction method of upright pitched roof insulation board
The invention relates to the technical field of building construction, in particular to a construction method of an upright pitched roof insulation board. Comprising the following steps that S1, according to design requirements, a fixing piece of the heat preservation plate is deeply designed; s2, pitched roof formworks and reinforcing steel bars are installed; s3, fixing parts are pre-buried and fixed on the sloping roof formwork in advance; s4, concrete pouring is conducted on the sloping roof formwork; s5, heat preservation plates are laid on the top of the concrete, and the ends of the fixing pieces are exposed out of the heat preservation plates; s6, the heat preservation plate and the fixing piece are connected; s7, a fine aggregate concrete leveling layer is laid on the outer side of the heat preservation plate; and S8, finally, a waterproof layer is constructed. The purpose of adjusting construction procedures is achieved by replacing a method of mechanically installing the fixing part with the pre-embedded fixing part, and meanwhile, the integrity can be improved, falling off can be avoided and the construction quality can be guaranteed through the pre-embedded mode.
本发明涉及建筑施工技术领域,具体是一种正置式坡屋面保温板施工方法。包括如下步骤:S1:根据设计要求进行保温板的固定件进行深化设计;S2:进行坡屋面模板和钢筋安装;S3:在坡屋面模板上提前对固定件进行预埋固定;S4:在坡屋面模板上进行混凝土浇筑;S5:在混凝土顶部进行保温板铺设,固定件的端部露在保温板外侧;S6:将保温板和固定件进行连接;S7:在保温板外侧铺设细石混凝土找平层;S8:最后进行防水层的施工。通过预埋固定件替代机械安装固定件的方法,达到调整施工工序的目的,同时利用预埋的方式可以增加整体性,避免脱落,保证施工质量。
Construction method of upright pitched roof insulation board
正置式坡屋面保温板施工方法
LU HAILONG (Autor:in) / PENG HUI (Autor:in) / LU ZHANQUAN (Autor:in) / HE YONGFEI (Autor:in) / OUYANG SINAN (Autor:in)
26.07.2024
Patent
Elektronische Ressource
Chinesisch
British Library Online Contents | 1999
Tile connecting structure of pitched roof, pitched roof and construction method of pitched roof
Europäisches Patentamt | 2024
|Emerald Group Publishing | 1988
|Control of pitched roof insulation