Integral translation and relocation device for ancient building and construction method of integral translation and relocation device
The invention relates to the field of overall movement of buildings, and discloses an ancient building overall translation moving device which comprises a plurality of supporting beam sets for supporting a building and two supporting rail sets for assisting the supporting beam sets in entering the bottom of the building. The supporting beam set comprises a main beam and side beam assemblies installed at the two ends of the main beam, each side beam assembly comprises a side beam connected with the main beam in a sliding mode, and two sets of side beam components are arranged on each side beam and comprise the first side beam component fixedly installed at the end of the corresponding side beam and the second side beam component arranged on the side, facing the main beam, of the first side beam component in a sliding mode. The side grooves are dug in the two sides of the building firstly, the two supporting rail sets are placed in the two side grooves respectively, then the foundation of the building is dug off, pits formed by digging off are communicated with the side grooves, and every time a preset distance is dug off, one supporting beam set is placed in a preset position through the supporting rail sets to support the building.
本发明涉及建筑物整体移动领域,其公开了一种古建筑物整体平移搬迁装置,包括支撑建筑物的支撑梁组与辅助支撑梁组进入建筑物底部的支撑轨组,支撑梁组设置有若干组,支撑轨组设置有两组,支撑梁组包括主梁与安装在主梁两端的侧梁组件,侧梁组件包括与主梁滑动连接的侧梁,侧梁上设置有两组侧梁部件并分别为固定安装在侧梁端部的侧梁部件一与滑动设置在侧梁部件一朝向主梁一侧的侧梁部件二,使用时,先在建筑物的两侧挖侧槽,将两组支撑轨组分别放在两个侧槽内,然后对建筑物的地基进行挖断,挖断形成的坑是与侧槽连通的,每挖断预设距离,就通过支撑轨组将一根支撑梁组放入预设位置处,对建筑物进行支撑。
Integral translation and relocation device for ancient building and construction method of integral translation and relocation device
The invention relates to the field of overall movement of buildings, and discloses an ancient building overall translation moving device which comprises a plurality of supporting beam sets for supporting a building and two supporting rail sets for assisting the supporting beam sets in entering the bottom of the building. The supporting beam set comprises a main beam and side beam assemblies installed at the two ends of the main beam, each side beam assembly comprises a side beam connected with the main beam in a sliding mode, and two sets of side beam components are arranged on each side beam and comprise the first side beam component fixedly installed at the end of the corresponding side beam and the second side beam component arranged on the side, facing the main beam, of the first side beam component in a sliding mode. The side grooves are dug in the two sides of the building firstly, the two supporting rail sets are placed in the two side grooves respectively, then the foundation of the building is dug off, pits formed by digging off are communicated with the side grooves, and every time a preset distance is dug off, one supporting beam set is placed in a preset position through the supporting rail sets to support the building.
本发明涉及建筑物整体移动领域,其公开了一种古建筑物整体平移搬迁装置,包括支撑建筑物的支撑梁组与辅助支撑梁组进入建筑物底部的支撑轨组,支撑梁组设置有若干组,支撑轨组设置有两组,支撑梁组包括主梁与安装在主梁两端的侧梁组件,侧梁组件包括与主梁滑动连接的侧梁,侧梁上设置有两组侧梁部件并分别为固定安装在侧梁端部的侧梁部件一与滑动设置在侧梁部件一朝向主梁一侧的侧梁部件二,使用时,先在建筑物的两侧挖侧槽,将两组支撑轨组分别放在两个侧槽内,然后对建筑物的地基进行挖断,挖断形成的坑是与侧槽连通的,每挖断预设距离,就通过支撑轨组将一根支撑梁组放入预设位置处,对建筑物进行支撑。
Integral translation and relocation device for ancient building and construction method of integral translation and relocation device
一种古建筑物整体平移搬迁装置及其施工方法
WEI PENG (Autor:in) / LIU PENG (Autor:in) / ZENG LINGSI (Autor:in) / LIANG YIZUN (Autor:in) / DONG DE (Autor:in) / ZHAO TAOCHUN (Autor:in)
26.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
MATERIAL RELOCATION DEVICE AND METHOD FOR RELOCATION OF MATERIALS
Europäisches Patentamt | 2022
|MATERIAL RELOCATION DEVICE AND METHOD FOR RELOCATION OF MATERIALS
Europäisches Patentamt | 2020
|