Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Existing subway tunnel protection structure adjacent to excavated foundation pit and construction method
The invention provides a protection structure of an existing subway tunnel adjacent to an excavated foundation pit. The protection structure comprises two rows of meat and vegetable secant piles, secant pile crown beams, a soil body transverse reinforcing area, parallel connecting beams and stress unloading holes. The two rows of meat and vegetable secant piles are arranged on the two sides of the existing subway tunnel respectively. The secant pile crown beam is arranged at the top of the meat and vegetable secant pile; the soil body transverse reinforcing area is arranged at the bottom of the meat and vegetable secant pile and used for transverse reinforcing; the parallel connecting beams are arranged between the tops of the meat and vegetable secant piles; the stress unloading holes are vertically formed in the sides, away from the excavated foundation pit, of the meat and vegetable secant piles. The invention further provides a construction method of the protection structure. The device has the advantages that the structure is simple, the number of construction procedures is small, stability is good, site construction is convenient, normal excavation of a foundation pit is not affected, and meanwhile the protection effect on an existing line is good.
本发明提供了一种紧邻开挖基坑的既有地铁隧道保护结构,包括荤素咬合桩、咬合桩冠梁、土体横向加固区、平行连梁、应力卸荷孔:荤素咬合桩设有两排,分别布置在既有地铁隧道两侧;咬合桩冠梁设在荤素咬合桩顶部;土体横向加固区设在荤素咬合桩底部,用于横向加固;平行连梁设在荤素咬合桩的顶部之间;应力卸荷孔竖向设在荤素咬合桩的远离开挖基坑的一侧。本发明还提供了一种上述保护结构的施工方法。本发明的优点在于:结构简单、施工工序少、稳定性好、现场施工方便,且不影响基坑正常开挖,同时对既有线路保护效果好。
Existing subway tunnel protection structure adjacent to excavated foundation pit and construction method
The invention provides a protection structure of an existing subway tunnel adjacent to an excavated foundation pit. The protection structure comprises two rows of meat and vegetable secant piles, secant pile crown beams, a soil body transverse reinforcing area, parallel connecting beams and stress unloading holes. The two rows of meat and vegetable secant piles are arranged on the two sides of the existing subway tunnel respectively. The secant pile crown beam is arranged at the top of the meat and vegetable secant pile; the soil body transverse reinforcing area is arranged at the bottom of the meat and vegetable secant pile and used for transverse reinforcing; the parallel connecting beams are arranged between the tops of the meat and vegetable secant piles; the stress unloading holes are vertically formed in the sides, away from the excavated foundation pit, of the meat and vegetable secant piles. The invention further provides a construction method of the protection structure. The device has the advantages that the structure is simple, the number of construction procedures is small, stability is good, site construction is convenient, normal excavation of a foundation pit is not affected, and meanwhile the protection effect on an existing line is good.
本发明提供了一种紧邻开挖基坑的既有地铁隧道保护结构,包括荤素咬合桩、咬合桩冠梁、土体横向加固区、平行连梁、应力卸荷孔:荤素咬合桩设有两排,分别布置在既有地铁隧道两侧;咬合桩冠梁设在荤素咬合桩顶部;土体横向加固区设在荤素咬合桩底部,用于横向加固;平行连梁设在荤素咬合桩的顶部之间;应力卸荷孔竖向设在荤素咬合桩的远离开挖基坑的一侧。本发明还提供了一种上述保护结构的施工方法。本发明的优点在于:结构简单、施工工序少、稳定性好、现场施工方便,且不影响基坑正常开挖,同时对既有线路保护效果好。
Existing subway tunnel protection structure adjacent to excavated foundation pit and construction method
一种紧邻开挖基坑的既有地铁隧道保护结构及施工方法
LI ZHANFENG (Autor:in) / CHENG GUIZHI (Autor:in) / GUO YUANBO (Autor:in) / TAO LULU (Autor:in) / BI YANZHE (Autor:in) / WU DIANWEI (Autor:in) / HE BANGLIANG (Autor:in)
30.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Protection construction method for subway excavated above existing subway interval
Europäisches Patentamt | 2022
|Construction method of foundation pit adjacent to subway tunnel
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Pretreatment method adopted before subway tunnel being excavated
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2024
|