Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rock-socketed uplift pile
A rock-socketed uplift pile comprises an uplift pile body, a pile clamping head, a pile tip structure, bed rock damage plates and a cement bag, one end of the uplift pile body is fixedly connected with the pile clamping head, the other end of the uplift pile body is fixedly connected with the pile tip structure, and the multiple bed rock damage plates are fixedly connected to the two sides of the uplift pile body. The bedrock destroying plate is obliquely arranged in the length direction of the uplift pile main body, and a cement bag is arranged on the bedrock destroying plate; compared with the prior art, the uplift pile has the advantages that the bedrock on the periphery of the uplift pile body is broken through the bedrock breaking plate, so that cement arranged on the bedrock breaking plate, the broken bedrock and underground water in a rock-soil layer react together, and the uplift pile and the bedrock structure can generate local condensation without concrete pouring after piling; and the uplift performance of the uplift pile is improved.
一种嵌岩抗拔桩,包括抗拔桩主体、夹桩头、桩尖结构、基岩破坏板和水泥包,抗拔桩主体的一端固定连接夹桩头,抗拔桩主体的另一端固定连接桩尖结构,抗拔桩主体的两侧固定连接有多个基岩破坏板,基岩破坏板沿抗拔桩主体的长度方向倾斜设置,基岩破坏板上设置有水泥包;与现有技术相比,通过基岩破坏板对抗拔桩主体周围的基岩进行破碎,使得设置于基岩破坏板上的水泥、破碎的基岩以及岩土层中的地下水共同发生反应,在打桩后无需进行混凝土的浇筑即可使抗拔桩与基岩结构产生局部凝结,提高抗拔桩的抗拔性能。
Rock-socketed uplift pile
A rock-socketed uplift pile comprises an uplift pile body, a pile clamping head, a pile tip structure, bed rock damage plates and a cement bag, one end of the uplift pile body is fixedly connected with the pile clamping head, the other end of the uplift pile body is fixedly connected with the pile tip structure, and the multiple bed rock damage plates are fixedly connected to the two sides of the uplift pile body. The bedrock destroying plate is obliquely arranged in the length direction of the uplift pile main body, and a cement bag is arranged on the bedrock destroying plate; compared with the prior art, the uplift pile has the advantages that the bedrock on the periphery of the uplift pile body is broken through the bedrock breaking plate, so that cement arranged on the bedrock breaking plate, the broken bedrock and underground water in a rock-soil layer react together, and the uplift pile and the bedrock structure can generate local condensation without concrete pouring after piling; and the uplift performance of the uplift pile is improved.
一种嵌岩抗拔桩,包括抗拔桩主体、夹桩头、桩尖结构、基岩破坏板和水泥包,抗拔桩主体的一端固定连接夹桩头,抗拔桩主体的另一端固定连接桩尖结构,抗拔桩主体的两侧固定连接有多个基岩破坏板,基岩破坏板沿抗拔桩主体的长度方向倾斜设置,基岩破坏板上设置有水泥包;与现有技术相比,通过基岩破坏板对抗拔桩主体周围的基岩进行破碎,使得设置于基岩破坏板上的水泥、破碎的基岩以及岩土层中的地下水共同发生反应,在打桩后无需进行混凝土的浇筑即可使抗拔桩与基岩结构产生局部凝结,提高抗拔桩的抗拔性能。
Rock-socketed uplift pile
一种嵌岩抗拔桩
DU YINGUANG (Autor:in) / WU QIANGQIANG (Autor:in) / SUN TAO (Autor:in) / HUANG CHAOLONG (Autor:in) / SHAO ZHENBAO (Autor:in)
09.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Rock-socketed hollow precast pile and rock-socketed construction method using precast pile
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|Model Test of Socketed Depth's Influence on Bearing Mechanism in Rock-Socketed Pile
British Library Conference Proceedings | 2011
|Study on the Uplift Bearing Capacity of Rock-Socketed Piles
Online Contents | 2021
|Study on the Uplift Bearing Capacity of Rock-Socketed Piles
Springer Verlag | 2021
|