Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated building truss
The invention belongs to the technical field of buildings, and particularly relates to a fabricated building truss which comprises a supporting pipe, second sliding blocks are slidably connected to the two sides of the upper end face of the supporting pipe, second connecting rods are rotatably arranged in the middles of the second sliding blocks, a supporting beam is rotatably arranged at the upper ends of the second connecting rods, and a moving column is rotatably arranged at one end of the supporting beam. The movable column is connected with the supporting pipe in a sliding mode, and the supporting beam is provided with a centralized collection type steel pipe clamping mechanism used for positioning steel pipes. A plurality of steel pipes can be automatically disassembled and uniformly fall into the blanking frame, so that the space occupied by the whole truss is reduced; the height of the supporting beam can be changed, so that the supporting work at different heights can be met; and the inclination angles of the supporting beams on the two sides can be adjusted, so that different assembling requirements can be better met, and flexibility is achieved.
本发明属于建筑技术领域,具体的说是一种装配式建筑桁架,包括支撑管,所述支撑管上端面两侧均滑动连接有滑块二,所述滑块二中部转动设置有连杆二,所述连杆二上端转动设置有支撑梁,所述支撑梁一端转动设置有移动柱,所述移动柱与支撑管滑动相连,所述支撑梁上设置有用于对钢管进行定位的可集中收集式钢管夹持机构,本发明实现了利用可集中收集式钢管夹持机构,当需要对整个桁架更换安装地点时,可使得多根钢管实现自动拆卸并统一落入至下料框中,减少了整个桁架所占据的空间;可使支撑梁的高度得以改变,进而可满足不同高度的支撑工作;可调节两侧支撑梁的倾斜角度,从而更好地适应不同装配需求,较为灵活。
Fabricated building truss
The invention belongs to the technical field of buildings, and particularly relates to a fabricated building truss which comprises a supporting pipe, second sliding blocks are slidably connected to the two sides of the upper end face of the supporting pipe, second connecting rods are rotatably arranged in the middles of the second sliding blocks, a supporting beam is rotatably arranged at the upper ends of the second connecting rods, and a moving column is rotatably arranged at one end of the supporting beam. The movable column is connected with the supporting pipe in a sliding mode, and the supporting beam is provided with a centralized collection type steel pipe clamping mechanism used for positioning steel pipes. A plurality of steel pipes can be automatically disassembled and uniformly fall into the blanking frame, so that the space occupied by the whole truss is reduced; the height of the supporting beam can be changed, so that the supporting work at different heights can be met; and the inclination angles of the supporting beams on the two sides can be adjusted, so that different assembling requirements can be better met, and flexibility is achieved.
本发明属于建筑技术领域,具体的说是一种装配式建筑桁架,包括支撑管,所述支撑管上端面两侧均滑动连接有滑块二,所述滑块二中部转动设置有连杆二,所述连杆二上端转动设置有支撑梁,所述支撑梁一端转动设置有移动柱,所述移动柱与支撑管滑动相连,所述支撑梁上设置有用于对钢管进行定位的可集中收集式钢管夹持机构,本发明实现了利用可集中收集式钢管夹持机构,当需要对整个桁架更换安装地点时,可使得多根钢管实现自动拆卸并统一落入至下料框中,减少了整个桁架所占据的空间;可使支撑梁的高度得以改变,进而可满足不同高度的支撑工作;可调节两侧支撑梁的倾斜角度,从而更好地适应不同装配需求,较为灵活。
Fabricated building truss
一种装配式建筑桁架
CHEN LIJUN (Autor:in) / QU HAIYING (Autor:in) / ZHU GUANGCHUAN (Autor:in) / WANG XINJIAN (Autor:in) / HOU QIAO (Autor:in) / LIU ZIRONG (Autor:in)
09.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Fabricated concrete truss building reinforcing structure
Europäisches Patentamt | 2023
|Fabricated concrete truss building structure reinforcing device
Europäisches Patentamt | 2020
|