Construction treatment method for light partition board wall body
The invention provides a light partition board wall body construction treatment method. The construction treatment method comprises the following steps that a wall base face is cleaned and repaired; a measuring tool is adopted to determine the installation position of the wall plate on the wall base surface, and marking is carried out; and the light partition boards are installed one by one from bottom to top and from left to right. Each wallboard is fixed by adopting a connecting piece and a fixing piece in the mounting process; after the wallboards are installed, gaps between the light partition boards and joints between the light partition boards and the concrete columns are filled; and after installation is completed, comprehensive inspection is carried out so as to ensure that each wallboard is installed in place. According to the light partition board wall body, the cracking probability of the light partition board can be reduced, the cracking phenomenon caused by improper quality and installation of the partition board is reduced, and the problem that cracks are frequently generated at joints between boards and wall columns of a building structure and joints between the boards in an existing light partition board wall body is solved.
本发明提供了一种轻质隔墙板墙体施工处理方法,该施工处理方法包括如下步骤:对墙基面进行清理和修复;采用测量工具确定墙基面上墙板的安装位置,并进行标记;按照从下到上、从左到右的顺序,逐块安装轻质隔墙板。并在安装过程中采用连接件和固定件对每块墙板进行固定;墙板安装完成后,对轻质隔墙板之间的缝隙以及轻质隔墙板与混凝土柱之间的接缝进行填充;完成安装后,进行全面的检查,以确保每个墙板均安装到位。本发明可降低轻质隔墙板的开裂几率,减少因隔墙板质量、安装不当造成的开裂现象的发生,解决了现有轻质隔墙板墙体在板与建筑结构的墙柱及板与板之间的接缝处经常产生裂缝的问题。
Construction treatment method for light partition board wall body
The invention provides a light partition board wall body construction treatment method. The construction treatment method comprises the following steps that a wall base face is cleaned and repaired; a measuring tool is adopted to determine the installation position of the wall plate on the wall base surface, and marking is carried out; and the light partition boards are installed one by one from bottom to top and from left to right. Each wallboard is fixed by adopting a connecting piece and a fixing piece in the mounting process; after the wallboards are installed, gaps between the light partition boards and joints between the light partition boards and the concrete columns are filled; and after installation is completed, comprehensive inspection is carried out so as to ensure that each wallboard is installed in place. According to the light partition board wall body, the cracking probability of the light partition board can be reduced, the cracking phenomenon caused by improper quality and installation of the partition board is reduced, and the problem that cracks are frequently generated at joints between boards and wall columns of a building structure and joints between the boards in an existing light partition board wall body is solved.
本发明提供了一种轻质隔墙板墙体施工处理方法,该施工处理方法包括如下步骤:对墙基面进行清理和修复;采用测量工具确定墙基面上墙板的安装位置,并进行标记;按照从下到上、从左到右的顺序,逐块安装轻质隔墙板。并在安装过程中采用连接件和固定件对每块墙板进行固定;墙板安装完成后,对轻质隔墙板之间的缝隙以及轻质隔墙板与混凝土柱之间的接缝进行填充;完成安装后,进行全面的检查,以确保每个墙板均安装到位。本发明可降低轻质隔墙板的开裂几率,减少因隔墙板质量、安装不当造成的开裂现象的发生,解决了现有轻质隔墙板墙体在板与建筑结构的墙柱及板与板之间的接缝处经常产生裂缝的问题。
Construction treatment method for light partition board wall body
一种轻质隔墙板墙体施工处理方法
YANG GUANG (Autor:in) / LEI JIANFENG (Autor:in) / ZHU HUAN (Autor:in) / WANG JINGQI (Autor:in) / YANG SHENGKUN (Autor:in) / SONG JIANGWEI (Autor:in) / CAI JIALE (Autor:in)
09.08.2024
Patent
Elektronische Ressource
Chinesisch
Light partition wall body structure and construction method
Europäisches Patentamt | 2024
|Light interior partition wall board and walling method for wall body
Europäisches Patentamt | 2015
|GRC light partition wall board mounting construction technology
Europäisches Patentamt | 2021
|Fabricated building internal partition wall board, wall body and construction process thereof
Europäisches Patentamt | 2021
|