Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge anti-collision guardrail integrated pouring construction equipment and using method thereof
The invention discloses integrated pouring construction equipment for a bridge anti-collision guardrail and a using method of the integrated pouring construction equipment. The construction equipment comprises a formwork component, a formwork fixing component and an operation platform. Wherein the template component is fixedly arranged at the upper end of a bridge concrete box girder; one end of the formwork fixing part is fixedly connected with the upper end of the bridge concrete box girder, and the other end of the formwork fixing part is fixedly connected with the inner side of the formwork part; the operating platform is fixedly arranged on the two longitudinal sides and the upper end of the template component; the structure of the formwork component is optimized, and the formwork component is stably fixed to the upper end of the bridge concrete box girder through the formwork fixing component, so that the problems of formwork shifting, formwork expanding and slurry leakage possibly occurring in the concrete pouring process are effectively solved, and meanwhile, the formwork component is fixed to the upper end of the bridge concrete box girder through the formwork fixing component. According to the operation platform, the overall sliding and overturning risks of the formwork component in the construction process are effectively prevented, the construction safety is ensured, and the safety of constructors is improved through the integrated design of the operation platform and the formwork component.
本发明公开了一种桥梁防撞护栏一体化浇筑施工设备及其使用方法,施工设备包括:模板部件、模板固定部件及操作平台;其中,所述模板部件固定设于桥梁混凝土箱梁上端;所述模板固定部件一端与所述桥梁混凝土箱梁上端固定连接,其另一端与所述模板部件内侧固定连接;所述操作平台固定设于所述模板部件纵向两侧及上端;通过对所述模板部件结构进行优化,并通过所述模板固定部件将所述模板部件稳定固定在所述桥梁混凝土箱梁上端,有效解决混凝土浇筑过程中可能出现的跑模、胀模和漏浆问题,同时,有效防止所述模板部件在施工过程中的整体滑移和倾覆风险,确保施工的安全性,其次,通过所述操作平台与所述模板部件的一体化设计,提高施工人员安全性。
Bridge anti-collision guardrail integrated pouring construction equipment and using method thereof
The invention discloses integrated pouring construction equipment for a bridge anti-collision guardrail and a using method of the integrated pouring construction equipment. The construction equipment comprises a formwork component, a formwork fixing component and an operation platform. Wherein the template component is fixedly arranged at the upper end of a bridge concrete box girder; one end of the formwork fixing part is fixedly connected with the upper end of the bridge concrete box girder, and the other end of the formwork fixing part is fixedly connected with the inner side of the formwork part; the operating platform is fixedly arranged on the two longitudinal sides and the upper end of the template component; the structure of the formwork component is optimized, and the formwork component is stably fixed to the upper end of the bridge concrete box girder through the formwork fixing component, so that the problems of formwork shifting, formwork expanding and slurry leakage possibly occurring in the concrete pouring process are effectively solved, and meanwhile, the formwork component is fixed to the upper end of the bridge concrete box girder through the formwork fixing component. According to the operation platform, the overall sliding and overturning risks of the formwork component in the construction process are effectively prevented, the construction safety is ensured, and the safety of constructors is improved through the integrated design of the operation platform and the formwork component.
本发明公开了一种桥梁防撞护栏一体化浇筑施工设备及其使用方法,施工设备包括:模板部件、模板固定部件及操作平台;其中,所述模板部件固定设于桥梁混凝土箱梁上端;所述模板固定部件一端与所述桥梁混凝土箱梁上端固定连接,其另一端与所述模板部件内侧固定连接;所述操作平台固定设于所述模板部件纵向两侧及上端;通过对所述模板部件结构进行优化,并通过所述模板固定部件将所述模板部件稳定固定在所述桥梁混凝土箱梁上端,有效解决混凝土浇筑过程中可能出现的跑模、胀模和漏浆问题,同时,有效防止所述模板部件在施工过程中的整体滑移和倾覆风险,确保施工的安全性,其次,通过所述操作平台与所述模板部件的一体化设计,提高施工人员安全性。
Bridge anti-collision guardrail integrated pouring construction equipment and using method thereof
桥梁防撞护栏一体化浇筑施工设备及其使用方法
JIANG WANLI (Autor:in) / YANG ZHIJUN (Autor:in) / LI BO (Autor:in)
23.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Concrete pouring construction method for edge anti-collision guardrail
Europäisches Patentamt | 2022
|Bridge concrete anti-collision guardrail and construction method thereof
Europäisches Patentamt | 2024
|Bridge anti-collision guardrail and construction method
Europäisches Patentamt | 2023
|Bridge anti-collision guardrail structure and construction method thereof
Europäisches Patentamt | 2020
|