The invention relates to the technical field of wall construction, and discloses an assembly type shear wall connecting mechanism and a shear wall construction method.The assembly type shear wall connecting mechanism comprises a matching part, the matching part is arranged in a wallboard and comprises a sleeve and a limiting seat, the sleeve forms a pouring cavity, and the limiting seat is installed on the inner wall of the sleeve and forms a limiting channel; each supporting assembly comprises a base, a main rod, an auxiliary rod, a locking piece, a positioning piece and an abutting piece; the base is installed on the side portion of the wallboard, and the main rod is hinged to the base. The locking piece is arranged in the main rod; the auxiliary rod slides in the main rod and extends out of the end, away from the base, of the main rod. The positioning piece is matched on the main rod and the auxiliary rod; the abutting piece is arranged at the end, away from the base, of the auxiliary rod. The connecting steel bars are pre-buried in the floor slab and correspond to the sleeves one to one; and the base is fixed on the floor and sleeves the outer wall of the connecting steel bar, and the upper surface of the base is a supporting surface for abutting against the wallboard. The matching precision of the wallboard and the connecting steel bars can be improved.
本申请涉及墙体施工的技术领域,公开了一种装配式剪力墙连接机构及剪力墙施工方法,装配式剪力墙连接机构包括配合件,设置于墙板中,包括套筒与限位座,套筒形成浇筑腔,限位座安装于套筒内壁并形成限位通道;支撑组件,每组支撑组件包括基座、主杆、副杆、锁定件、定位件以及抵接件;基座安装于墙板侧部,主杆铰接于基座上;锁定件设置于主杆中;副杆滑移于主杆中并从主杆远离基座一端延伸出;定位件配合于主杆与副杆上;抵接件设置于副杆远离基座一端;连接钢筋,预埋于楼板中,与套筒一一对应;以及底座,固定于楼板上,并套设于连接钢筋外壁,上表面为供墙板相抵的支撑面。本申请能够提高墙板与连接钢筋的配合精度。
The invention relates to the technical field of wall construction, and discloses an assembly type shear wall connecting mechanism and a shear wall construction method.The assembly type shear wall connecting mechanism comprises a matching part, the matching part is arranged in a wallboard and comprises a sleeve and a limiting seat, the sleeve forms a pouring cavity, and the limiting seat is installed on the inner wall of the sleeve and forms a limiting channel; each supporting assembly comprises a base, a main rod, an auxiliary rod, a locking piece, a positioning piece and an abutting piece; the base is installed on the side portion of the wallboard, and the main rod is hinged to the base. The locking piece is arranged in the main rod; the auxiliary rod slides in the main rod and extends out of the end, away from the base, of the main rod. The positioning piece is matched on the main rod and the auxiliary rod; the abutting piece is arranged at the end, away from the base, of the auxiliary rod. The connecting steel bars are pre-buried in the floor slab and correspond to the sleeves one to one; and the base is fixed on the floor and sleeves the outer wall of the connecting steel bar, and the upper surface of the base is a supporting surface for abutting against the wallboard. The matching precision of the wallboard and the connecting steel bars can be improved.
本申请涉及墙体施工的技术领域,公开了一种装配式剪力墙连接机构及剪力墙施工方法,装配式剪力墙连接机构包括配合件,设置于墙板中,包括套筒与限位座,套筒形成浇筑腔,限位座安装于套筒内壁并形成限位通道;支撑组件,每组支撑组件包括基座、主杆、副杆、锁定件、定位件以及抵接件;基座安装于墙板侧部,主杆铰接于基座上;锁定件设置于主杆中;副杆滑移于主杆中并从主杆远离基座一端延伸出;定位件配合于主杆与副杆上;抵接件设置于副杆远离基座一端;连接钢筋,预埋于楼板中,与套筒一一对应;以及底座,固定于楼板上,并套设于连接钢筋外壁,上表面为供墙板相抵的支撑面。本申请能够提高墙板与连接钢筋的配合精度。
Fabricated shear wall connecting mechanism and shear wall construction method
一种装配式剪力墙连接机构及剪力墙施工方法
23.08.2024
Patent
Elektronische Ressource
Chinesisch
Fabricated shear wall connecting mechanism, shear wall and shear wall construction method
Europäisches Patentamt | 2021
|Fabricated shear wall connecting mechanism, shear wall and shear wall construction method
Europäisches Patentamt | 2021
|Fabricated shear wall connecting mechanism and method thereof