Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated light steel skeleton thermal insulation wall system and construction method thereof
The invention relates to an assembly type light steel framework heat preservation wall system and a construction method thereof.The assembly type light steel framework heat preservation wall system comprises an outer wall framework and an inner wall framework, a heat preservation plate is arranged in the outer wall framework, and a pouring cavity is formed between the heat preservation plate and the outer wall framework; concrete is poured into the pouring cavity to integrally pour the outer wall body framework and the heat preservation plate and form a building outer wall, a pouring cavity is formed in the inner wall body framework, and concrete is poured into the pouring cavity to form a building inner wall. According to the pouring cavity, when concrete is poured, the heat preservation plate can be directly poured into the outer wall body framework, secondary construction after formwork removal is not needed, manpower and material resources are saved, the construction period is greatly shortened, the heat preservation plate is located in the building outer wall and protected by the concrete, the heat preservation plate is not affected by the external environment, and then the service life of the heat preservation plate is prolonged.
本发明涉及一种装配式轻钢骨架保温墙体系统及其施工方法,包括外墙体骨架和内墙体骨架,所述外墙体骨架的内部设有保温板,保温板和外墙体骨架之间形成有浇筑空腔,浇筑空腔内浇筑混凝土将外墙体骨架和保温板浇筑为一体并形成建筑外墙,所述内墙体骨架内部设有浇筑空腔,浇筑空腔浇筑混凝土形成建筑内墙。本发明浇筑空腔在浇筑混凝土时可直接将保温板浇筑于外墙体骨架内部,不需要拆模后二次施工,节省了人力物力,极大缩短了施工周期,并且保温板位于建筑外墙内部,通过混凝土保护,不受外部环境影响,进而提高了保温板的使用寿命。
Fabricated light steel skeleton thermal insulation wall system and construction method thereof
The invention relates to an assembly type light steel framework heat preservation wall system and a construction method thereof.The assembly type light steel framework heat preservation wall system comprises an outer wall framework and an inner wall framework, a heat preservation plate is arranged in the outer wall framework, and a pouring cavity is formed between the heat preservation plate and the outer wall framework; concrete is poured into the pouring cavity to integrally pour the outer wall body framework and the heat preservation plate and form a building outer wall, a pouring cavity is formed in the inner wall body framework, and concrete is poured into the pouring cavity to form a building inner wall. According to the pouring cavity, when concrete is poured, the heat preservation plate can be directly poured into the outer wall body framework, secondary construction after formwork removal is not needed, manpower and material resources are saved, the construction period is greatly shortened, the heat preservation plate is located in the building outer wall and protected by the concrete, the heat preservation plate is not affected by the external environment, and then the service life of the heat preservation plate is prolonged.
本发明涉及一种装配式轻钢骨架保温墙体系统及其施工方法,包括外墙体骨架和内墙体骨架,所述外墙体骨架的内部设有保温板,保温板和外墙体骨架之间形成有浇筑空腔,浇筑空腔内浇筑混凝土将外墙体骨架和保温板浇筑为一体并形成建筑外墙,所述内墙体骨架内部设有浇筑空腔,浇筑空腔浇筑混凝土形成建筑内墙。本发明浇筑空腔在浇筑混凝土时可直接将保温板浇筑于外墙体骨架内部,不需要拆模后二次施工,节省了人力物力,极大缩短了施工周期,并且保温板位于建筑外墙内部,通过混凝土保护,不受外部环境影响,进而提高了保温板的使用寿命。
Fabricated light steel skeleton thermal insulation wall system and construction method thereof
一种装配式轻钢骨架保温墙体系统及其施工方法
FENG ZHAOKUN (Autor:in) / MEI SHICHAO (Autor:in) / DONG BAOCAI (Autor:in) / FENG YUSHENG (Autor:in)
23.08.2024
Patent
Elektronische Ressource
Chinesisch
Fabricated thermal insulation wall structure and construction method thereof
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Fabricated light steel skeleton gypsum wall preparation process
Europäisches Patentamt | 2022
|Light steel thermal insulation wall and construction method
Europäisches Patentamt | 2024
|Construction method of light steel thermal insulation wall
Europäisches Patentamt | 2024
|