Method for building movable type steel structure canopy
The invention discloses a method for building a movable steel canopy. The method comprises the following steps: S1, preparing steel members forming the movable canopy; s2, planning a given area, and determining the mounting position of a movable canopy; s3, the two supporting steel rows forming the movable canopy are independently assembled to form a whole, and the jacking steel trusses are assembled to form a whole; s4, a track is laid at the preset position, and walking wheels are installed at the bottom of the supporting steel row; s5, the gantry crane is moved to a designated position shielded by the movable canopy to be assembled; s6, a movable canopy for shielding the gantry crane is assembled; the two supporting steel rows are hoisted and fixed at designated positions, then the top supporting steel truss is hoisted and fixed to the two supporting steel rows, and finally the canopy roof covers the top of the top supporting steel truss; s7, the steps S3-S6 are repeated, and the movable canopies are constructed one by one till a preset number of movable canopies are built; s8, traffic lane construction; the function of transferring the precast beams in batches can be achieved, the production cycle is better shortened, the flow production efficiency of the precast beams is improved, and the production cost is reduced.
本发明公开了一种移动式钢构雨棚搭建方法,S1.构成活动雨棚的钢构件准备;S2.既定区域规划,确定活动雨棚安装位置;S3.构成一个活动雨棚的两片支撑钢排分别独立拼装形成整体,顶撑钢桁架拼装形成整体;S4.在预设位置铺设轨道,在支撑钢排底部安装行走轮;S5.将龙门吊移位至被待装配活动雨棚遮挡的指定位置;S6.装配将龙门吊遮挡的活动雨棚;先将两片支撑钢排在指定位置吊装固定,然后将顶撑钢桁架吊装与两片支撑钢排固定,最后将雨棚屋盖在顶撑钢桁架顶部覆盖;S7.重复步骤S3~S6,逐个施工活动雨棚,直至完成预设数量的活动雨棚搭建;S8.行车道施工;能够满足批量转移预制梁的功能,更利于降低生产周期,提升预制梁的流水生产效率,降低生产成本。
Method for building movable type steel structure canopy
The invention discloses a method for building a movable steel canopy. The method comprises the following steps: S1, preparing steel members forming the movable canopy; s2, planning a given area, and determining the mounting position of a movable canopy; s3, the two supporting steel rows forming the movable canopy are independently assembled to form a whole, and the jacking steel trusses are assembled to form a whole; s4, a track is laid at the preset position, and walking wheels are installed at the bottom of the supporting steel row; s5, the gantry crane is moved to a designated position shielded by the movable canopy to be assembled; s6, a movable canopy for shielding the gantry crane is assembled; the two supporting steel rows are hoisted and fixed at designated positions, then the top supporting steel truss is hoisted and fixed to the two supporting steel rows, and finally the canopy roof covers the top of the top supporting steel truss; s7, the steps S3-S6 are repeated, and the movable canopies are constructed one by one till a preset number of movable canopies are built; s8, traffic lane construction; the function of transferring the precast beams in batches can be achieved, the production cycle is better shortened, the flow production efficiency of the precast beams is improved, and the production cost is reduced.
本发明公开了一种移动式钢构雨棚搭建方法,S1.构成活动雨棚的钢构件准备;S2.既定区域规划,确定活动雨棚安装位置;S3.构成一个活动雨棚的两片支撑钢排分别独立拼装形成整体,顶撑钢桁架拼装形成整体;S4.在预设位置铺设轨道,在支撑钢排底部安装行走轮;S5.将龙门吊移位至被待装配活动雨棚遮挡的指定位置;S6.装配将龙门吊遮挡的活动雨棚;先将两片支撑钢排在指定位置吊装固定,然后将顶撑钢桁架吊装与两片支撑钢排固定,最后将雨棚屋盖在顶撑钢桁架顶部覆盖;S7.重复步骤S3~S6,逐个施工活动雨棚,直至完成预设数量的活动雨棚搭建;S8.行车道施工;能够满足批量转移预制梁的功能,更利于降低生产周期,提升预制梁的流水生产效率,降低生产成本。
Method for building movable type steel structure canopy
移动式钢构雨棚搭建方法
LI ZHIYUE (Autor:in) / ZHANG YULIANG (Autor:in) / YU HAILIN (Autor:in) / ZHENG HUIFEN (Autor:in) / LIU JINFANG (Autor:in) / JING CHENGQIAN (Autor:in) / LIU GUANQI (Autor:in)
23.08.2024
Patent
Elektronische Ressource
Chinesisch