Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Underneath passing high-speed rail roadbed traffic culvert construction device and construction method
The invention relates to an underneath passing high-speed rail roadbed traffic culvert construction device, and belongs to the technical field of frame culvert construction, the underneath passing high-speed rail roadbed traffic culvert construction device comprises a plurality of temporary support piles, a pushing assembly and a reinforcing assembly, the temporary support piles are arranged on the two sides of a culvert, and a plurality of deflector rods are rotationally arranged on the sides, away from the side wall of the culvert, of the temporary support piles and connected with guide wheels; the pushing assembly is used for pushing the frame culvert into the culvert, and the pushing assembly is located in the working pit; the reinforcing assembly is used for reinforcing a railway above the culvert, the temporary support pile close to the railway is connected with the reinforcing assembly, and the reinforcing assembly is connected with the railway above the culvert; an anchoring assembly is arranged in the temporary supporting pile and used for anchoring the temporary supporting pile, the side wall of the culvert and the bottom soil layer. The construction method has the advantages that in the construction process, damage to a waterproof layer of the frame culvert can be reduced, meanwhile, the situation that the side wall of the culvert collapses can be reduced, and the adaptability to construction of the frame culvert is improved.
本申请涉及一种下穿高铁路基交通涵施工装置,属于框架涵施工技术领域,其包括若干临时支护桩、顶推组件和加固组件,若干临时支护桩排列设置在涵洞两侧,临时支护桩背离涵洞侧壁的一侧转动设置有若干拨杆,拨杆连接有导向轮;顶推组件用于顶推框架涵进入涵洞,顶推组件位于工作坑内;加固组件用于加固涵洞上方铁路,与铁路临近的临时支护桩与加固组件连接,加固组件与涵洞上方铁路连接;临时支护桩内设置有锚固组件,锚固组件用于将临时支护桩与涵洞侧壁、底部土层形成锚固。本申请具有实现在施工中过程中,不仅可以减少对框架涵防水层的破坏,同时还能减少涵洞侧壁坍塌的情况,提高对框架涵施工的适应性的效果。
Underneath passing high-speed rail roadbed traffic culvert construction device and construction method
The invention relates to an underneath passing high-speed rail roadbed traffic culvert construction device, and belongs to the technical field of frame culvert construction, the underneath passing high-speed rail roadbed traffic culvert construction device comprises a plurality of temporary support piles, a pushing assembly and a reinforcing assembly, the temporary support piles are arranged on the two sides of a culvert, and a plurality of deflector rods are rotationally arranged on the sides, away from the side wall of the culvert, of the temporary support piles and connected with guide wheels; the pushing assembly is used for pushing the frame culvert into the culvert, and the pushing assembly is located in the working pit; the reinforcing assembly is used for reinforcing a railway above the culvert, the temporary support pile close to the railway is connected with the reinforcing assembly, and the reinforcing assembly is connected with the railway above the culvert; an anchoring assembly is arranged in the temporary supporting pile and used for anchoring the temporary supporting pile, the side wall of the culvert and the bottom soil layer. The construction method has the advantages that in the construction process, damage to a waterproof layer of the frame culvert can be reduced, meanwhile, the situation that the side wall of the culvert collapses can be reduced, and the adaptability to construction of the frame culvert is improved.
本申请涉及一种下穿高铁路基交通涵施工装置,属于框架涵施工技术领域,其包括若干临时支护桩、顶推组件和加固组件,若干临时支护桩排列设置在涵洞两侧,临时支护桩背离涵洞侧壁的一侧转动设置有若干拨杆,拨杆连接有导向轮;顶推组件用于顶推框架涵进入涵洞,顶推组件位于工作坑内;加固组件用于加固涵洞上方铁路,与铁路临近的临时支护桩与加固组件连接,加固组件与涵洞上方铁路连接;临时支护桩内设置有锚固组件,锚固组件用于将临时支护桩与涵洞侧壁、底部土层形成锚固。本申请具有实现在施工中过程中,不仅可以减少对框架涵防水层的破坏,同时还能减少涵洞侧壁坍塌的情况,提高对框架涵施工的适应性的效果。
Underneath passing high-speed rail roadbed traffic culvert construction device and construction method
一种下穿高铁路基交通涵施工装置及施工方法
WANG DELONG (Autor:in) / YANG YUNFA (Autor:in) / JIA XIAOHUI (Autor:in) / LI HAIBING (Autor:in) / LIU LU (Autor:in) / WANG GUOMING (Autor:in) / HU QINGQUAN (Autor:in) / TANG XIN (Autor:in) / HE CHAO (Autor:in) / ARMIND (Autor:in)
27.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2020
|Underpinning construction method for roadbed culvert foundation
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|