Kitchen and toilet flue bearing construction method
The invention discloses a kitchen and toilet flue bearing construction method. The method comprises the following construction steps that S1, a beam plate formwork is erected; s2, measuring and setting out are conducted, specifically, a flue hole is positioned, and setting out is conducted through an ink fountain; s3, a flue support is installed, specifically, the flue support is fixed to the formwork through a fixing ring; s4, structure construction is conducted, specifically, according to the drawing design, steel bar binding is completed, concrete construction is completed, and masonry construction is completed; s5, flue installation is conducted, specifically, the flue is installed on a flue support; the gap between the flue and the flue support is tightly filled with fine aggregate concrete or polymer mortar, the pre-buried flue support is adopted, the flue construction quality is improved, and the problems that the connecting position of a traditional flue is not tight in sealing, the connecting position is prone to cracking, water leakage is prone to occurring and the like are solved.
本发明公开了一种厨房、卫生间烟道承托施工方法,包括以下施工步骤:S1:梁板模板支设;S2:测量放线:将烟道孔进行定位,用墨斗放线;S3:烟道承托安装:将烟道承托通过固定固定环将烟道承托固定在模板上;S4:结构施工:根据图纸设计将钢筋绑扎完成、混凝土施工完成、砌筑施工完成;S5:烟道安装:将烟道安装在烟道托上;S6:缝隙封堵:烟道与烟道承托之间缝隙用细石混凝土或聚合物砂浆填塞严实,采用预埋烟道承托,提高了烟道施工质量,解决了传统烟道连接处密封不严密、连接部位易开裂而且容易渗漏水等问题。
Kitchen and toilet flue bearing construction method
The invention discloses a kitchen and toilet flue bearing construction method. The method comprises the following construction steps that S1, a beam plate formwork is erected; s2, measuring and setting out are conducted, specifically, a flue hole is positioned, and setting out is conducted through an ink fountain; s3, a flue support is installed, specifically, the flue support is fixed to the formwork through a fixing ring; s4, structure construction is conducted, specifically, according to the drawing design, steel bar binding is completed, concrete construction is completed, and masonry construction is completed; s5, flue installation is conducted, specifically, the flue is installed on a flue support; the gap between the flue and the flue support is tightly filled with fine aggregate concrete or polymer mortar, the pre-buried flue support is adopted, the flue construction quality is improved, and the problems that the connecting position of a traditional flue is not tight in sealing, the connecting position is prone to cracking, water leakage is prone to occurring and the like are solved.
本发明公开了一种厨房、卫生间烟道承托施工方法,包括以下施工步骤:S1:梁板模板支设;S2:测量放线:将烟道孔进行定位,用墨斗放线;S3:烟道承托安装:将烟道承托通过固定固定环将烟道承托固定在模板上;S4:结构施工:根据图纸设计将钢筋绑扎完成、混凝土施工完成、砌筑施工完成;S5:烟道安装:将烟道安装在烟道托上;S6:缝隙封堵:烟道与烟道承托之间缝隙用细石混凝土或聚合物砂浆填塞严实,采用预埋烟道承托,提高了烟道施工质量,解决了传统烟道连接处密封不严密、连接部位易开裂而且容易渗漏水等问题。
Kitchen and toilet flue bearing construction method
厨房、卫生间烟道承托施工方法
MAN KAIGUO (Autor:in) / KUANG PENGSHUN (Autor:in) / CHEN LIANG (Autor:in) / DU WENCHENG (Autor:in) / SHI MENGYUAN (Autor:in) / JIN SHANGHUA (Autor:in) / ZHAO PENGCHENG (Autor:in)
27.08.2024
Patent
Elektronische Ressource
Chinesisch
Waterproof glue, kitchen and toilet waterproof structure and construction method
Europäisches Patentamt | 2021
|Waterproof plugging construction process for kitchen and toilet pipelines
Europäisches Patentamt | 2023
|Kitchen and toilet waterproof system and construction technology thereof
Europäisches Patentamt | 2021
|Suspended formwork-free construction method for residential kitchen flue
Europäisches Patentamt | 2023
|Kitchen and toilet water stop composite formwork and construction method thereof
Europäisches Patentamt | 2015
|