Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated base station iron tower and mounting method thereof
The invention discloses a fabricated base station iron tower and a mounting method thereof. The fabricated base station iron tower comprises a mounting base; the first section of tower body is connected with the base; the second section of tower body is hinged to the upper end edge of the first section of tower body, the third section of tower body is hinged to the upper end edge of the second section of tower body, and the fourth section of tower body is hinged to the upper end edge of the third section of tower body; the second section of tower body, the third section of tower body and the fourth section of tower body are connected with the first unmanned aerial vehicle, the second unmanned aerial vehicle and the third unmanned aerial vehicle through inhaul cables correspondingly; the first unmanned aerial vehicle, the second unmanned aerial vehicle and the third unmanned aerial vehicle are controlled to pull the second tower body, the third tower body and the fourth tower body at the same time until the second tower body is vertically aligned with the first tower body, the third tower body is vertically aligned with the second tower body, and the fourth tower body is vertically aligned with the third tower body, and the second tower body is sequentially connected with the first tower body; and the third section of tower body is connected with the second section of tower body, the fourth section of tower body is connected with the third section of tower body, and iron tower installation is completed. The installation speed and the installation precision of the base station iron tower can be improved.
本发明公开了装配式基站铁塔及其安装方法,包括:安装底座;将第一节塔身与底座连接;将第二节塔身与第一节塔身上端边缘铰接,将第三节塔身与第二节塔身上端边缘铰接,将第四节塔身与第三节塔身上端边缘铰接;将第二节塔身、第三节塔身、第四节塔身分别与第一无人机、第二无人机和第三无人机通过拉索连接;控制第一无人机、第二无人机、第三无人机同时拉拽第二节塔身、第三节塔身和第四节塔身,依次至第二节塔身与第一节塔身、第三节塔身与第二节塔身、第四节塔身与第三节塔身竖直对齐,并依次将第二节塔身与第一节塔身连接,将第三节塔身与第二节塔身连接,将第四节塔身与第三节塔身连接,完成铁塔安装。本发明能够提升基站铁塔的安装速度和安装精度。
Fabricated base station iron tower and mounting method thereof
The invention discloses a fabricated base station iron tower and a mounting method thereof. The fabricated base station iron tower comprises a mounting base; the first section of tower body is connected with the base; the second section of tower body is hinged to the upper end edge of the first section of tower body, the third section of tower body is hinged to the upper end edge of the second section of tower body, and the fourth section of tower body is hinged to the upper end edge of the third section of tower body; the second section of tower body, the third section of tower body and the fourth section of tower body are connected with the first unmanned aerial vehicle, the second unmanned aerial vehicle and the third unmanned aerial vehicle through inhaul cables correspondingly; the first unmanned aerial vehicle, the second unmanned aerial vehicle and the third unmanned aerial vehicle are controlled to pull the second tower body, the third tower body and the fourth tower body at the same time until the second tower body is vertically aligned with the first tower body, the third tower body is vertically aligned with the second tower body, and the fourth tower body is vertically aligned with the third tower body, and the second tower body is sequentially connected with the first tower body; and the third section of tower body is connected with the second section of tower body, the fourth section of tower body is connected with the third section of tower body, and iron tower installation is completed. The installation speed and the installation precision of the base station iron tower can be improved.
本发明公开了装配式基站铁塔及其安装方法,包括:安装底座;将第一节塔身与底座连接;将第二节塔身与第一节塔身上端边缘铰接,将第三节塔身与第二节塔身上端边缘铰接,将第四节塔身与第三节塔身上端边缘铰接;将第二节塔身、第三节塔身、第四节塔身分别与第一无人机、第二无人机和第三无人机通过拉索连接;控制第一无人机、第二无人机、第三无人机同时拉拽第二节塔身、第三节塔身和第四节塔身,依次至第二节塔身与第一节塔身、第三节塔身与第二节塔身、第四节塔身与第三节塔身竖直对齐,并依次将第二节塔身与第一节塔身连接,将第三节塔身与第二节塔身连接,将第四节塔身与第三节塔身连接,完成铁塔安装。本发明能够提升基站铁塔的安装速度和安装精度。
Fabricated base station iron tower and mounting method thereof
装配式基站铁塔及其安装方法
ZHU XINHUI (Autor:in) / YU JIAN (Autor:in) / GUO FUSHENG (Autor:in) / ZHU KEQING (Autor:in) / FU CHENGLIN (Autor:in) / YU HAICANG (Autor:in)
27.08.2024
Patent
Elektronische Ressource
Chinesisch
5G communication base station tower body mounting method
Europäisches Patentamt | 2021
|Fabricated building supporting base and mounting method thereof
Europäisches Patentamt | 2024
|Iron tower mounting base based on 5G communication network
Europäisches Patentamt | 2023
|