Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge and culvert and construction method thereof
The invention relates to a bridge and culvert and a construction method thereof, and the bridge and culvert comprises a plurality of bridge piers which are arranged at intervals along the length direction of the bridge and culvert; the two bridge abutments are arranged on the two sides of the multiple bridge piers in the length direction of the bridge and culvert and are in butt joint with the river levees correspondingly; the multiple foundation piles are fixedly supported at the bottoms of the multiple piers and the bottoms of the two bridge abutments respectively, and the top ends of the foundation piles are located below the surface layer of the river bottom; the T-shaped beams extend in the length direction of the bridge culvert, the two ends of each T-shaped beam are erected on the two bridge abutments correspondingly, and every two adjacent T-shaped beams are in butt joint in the width direction of the T-shaped beams; and the bridge surface is poured at the top of the T-shaped beam.
本公开涉及一种桥涵及其施工方法,其中的桥涵包括:多个桥墩,沿桥涵长度方向间隔设置;两个桥台,沿桥涵长度方向设置在所述多个桥墩的两侧,并分别与河堤对接;多根基桩,分别固定支撑在多个所述桥墩和两个桥台的底部,并且所述基桩的顶端位于河底表层以下;多根T型梁,所述T型梁沿所述桥涵长度方向延伸且两端分别搭设在两个所述桥台上,相邻两根所述T型梁沿其宽度方向相互对接;以及桥面,浇筑在所述T型梁的顶部。
Bridge and culvert and construction method thereof
The invention relates to a bridge and culvert and a construction method thereof, and the bridge and culvert comprises a plurality of bridge piers which are arranged at intervals along the length direction of the bridge and culvert; the two bridge abutments are arranged on the two sides of the multiple bridge piers in the length direction of the bridge and culvert and are in butt joint with the river levees correspondingly; the multiple foundation piles are fixedly supported at the bottoms of the multiple piers and the bottoms of the two bridge abutments respectively, and the top ends of the foundation piles are located below the surface layer of the river bottom; the T-shaped beams extend in the length direction of the bridge culvert, the two ends of each T-shaped beam are erected on the two bridge abutments correspondingly, and every two adjacent T-shaped beams are in butt joint in the width direction of the T-shaped beams; and the bridge surface is poured at the top of the T-shaped beam.
本公开涉及一种桥涵及其施工方法,其中的桥涵包括:多个桥墩,沿桥涵长度方向间隔设置;两个桥台,沿桥涵长度方向设置在所述多个桥墩的两侧,并分别与河堤对接;多根基桩,分别固定支撑在多个所述桥墩和两个桥台的底部,并且所述基桩的顶端位于河底表层以下;多根T型梁,所述T型梁沿所述桥涵长度方向延伸且两端分别搭设在两个所述桥台上,相邻两根所述T型梁沿其宽度方向相互对接;以及桥面,浇筑在所述T型梁的顶部。
Bridge and culvert and construction method thereof
桥涵及其施工方法
GAO YANG (Autor:in) / YIN ZONGLIN (Autor:in) / KONG DEKAI (Autor:in) / HU YUHUI (Autor:in) / ZAN YONGQING (Autor:in) / YANG JIA (Autor:in) / LI YINGBING (Autor:in) / XIA HONGWEI (Autor:in) / LIU HONG (Autor:in)
30.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Box culvert construction assembly, application thereof and box culvert construction method
Europäisches Patentamt | 2021
|Soft soil foundation double-pavement bridge and culvert and construction method thereof
Europäisches Patentamt | 2024
|