Fabricated structure formwork supporting system construction method based on double-groove joists
The invention provides an assembly type structure formwork supporting system construction method based on a double-groove joist. The method comprises the steps that paying-off positioning is conducted; the adjustable base is placed according to positioning; a standard base is placed on the adjustable base; a floor sweeping transverse rod is installed on the standard base; leveling the frame body by using a level gauge and a rope; mounting two or more than two vertical rods and cross rods; diagonal draw bars are installed; the end cross rod and the diagonal draw bar are mounted in a top sealing manner; mounting a double-groove joist; and the adjustable jacking and the primary and secondary keels are installed. The bending resistance of the prefabricated parts and the bearing capacity of the novel frame body are fully utilized, the arrangement of the formwork supporting system is optimized, the material consumption is greatly reduced, the construction efficiency is improved, it is ensured that the frame body is in a safe and reliable range in the construction process, a monitoring instrument is used for conducting deformation monitoring on the supporting system, and the construction cost is reduced. And the supporting system is in a safe and reliable range in the construction process.
本发明提供了一种基于双槽托梁的装配式结构模架支撑体系施工方法,包括:放线定位;按照定位放置可调底座;在可调底座上放置标准基座;在标准基座上安装扫地横杆;用水准仪和线绳将架体调平;安装二步及以上立杆和横杆;安装斜拉杆;直至封顶安装端横杆和斜拉杆;安装双槽托梁;安装可调顶托和主次龙骨。本发明充分利用预制构件本身的抗弯性能以及新型架体的承载力,优化模架支撑体系布置,大大减少了材料用量,提高了施工效率,确保架体在施工过程中处于安全可靠的范围,还利用监控仪器对支撑体系进行变形监测,确保支撑体系在施工过程中处于安全可靠范围。
Fabricated structure formwork supporting system construction method based on double-groove joists
The invention provides an assembly type structure formwork supporting system construction method based on a double-groove joist. The method comprises the steps that paying-off positioning is conducted; the adjustable base is placed according to positioning; a standard base is placed on the adjustable base; a floor sweeping transverse rod is installed on the standard base; leveling the frame body by using a level gauge and a rope; mounting two or more than two vertical rods and cross rods; diagonal draw bars are installed; the end cross rod and the diagonal draw bar are mounted in a top sealing manner; mounting a double-groove joist; and the adjustable jacking and the primary and secondary keels are installed. The bending resistance of the prefabricated parts and the bearing capacity of the novel frame body are fully utilized, the arrangement of the formwork supporting system is optimized, the material consumption is greatly reduced, the construction efficiency is improved, it is ensured that the frame body is in a safe and reliable range in the construction process, a monitoring instrument is used for conducting deformation monitoring on the supporting system, and the construction cost is reduced. And the supporting system is in a safe and reliable range in the construction process.
本发明提供了一种基于双槽托梁的装配式结构模架支撑体系施工方法,包括:放线定位;按照定位放置可调底座;在可调底座上放置标准基座;在标准基座上安装扫地横杆;用水准仪和线绳将架体调平;安装二步及以上立杆和横杆;安装斜拉杆;直至封顶安装端横杆和斜拉杆;安装双槽托梁;安装可调顶托和主次龙骨。本发明充分利用预制构件本身的抗弯性能以及新型架体的承载力,优化模架支撑体系布置,大大减少了材料用量,提高了施工效率,确保架体在施工过程中处于安全可靠的范围,还利用监控仪器对支撑体系进行变形监测,确保支撑体系在施工过程中处于安全可靠范围。
Fabricated structure formwork supporting system construction method based on double-groove joists
一种基于双槽托梁的装配式结构模架支撑体系施工方法
HUANG WEIXING (Autor:in) / LIU YASONG (Autor:in) / SI ZHENGQI (Autor:in) / QUAN YOUWEI (Autor:in) / CHENG JIE (Autor:in)
30.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Fabricated supporting formwork system and construction method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Fabricated building formwork and matched formwork supporting device
Europäisches Patentamt | 2024
|Fabricated steel structure floor formwork supporting frame
Europäisches Patentamt | 2022
|