Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Verticality correcting device for steel column of steel structure building and using method of perpendicularity correcting device
The invention relates to the field of steel column perpendicularity correction. The invention discloses a perpendicularity correcting device for a steel structure building steel column and a using method, and aims to solve the problems that when an existing steel structure is corrected, the gradient of the steel structure is judged through a gradienter firstly, and then the steel structure is corrected. And when the steel structure is skewed in the mounting process, the steel column cannot be effectively corrected due to multi-section skewing of the steel structure, and multi-point gradual straightening is needed, and multi-section treatment in the correction process of the steel structure cannot be effectively treated in the scheme. The steel column can be straightened through the correcting device in the ring sleeve on the supporting plate, so that the steel column in an inclined state is gradually corrected from the top end of the steel column downwards.
本发明涉及钢柱垂直度矫正领域。本发明公开了一种钢结构建筑钢柱的垂直度矫正装置及使用方法,本发明要解决的问题是现有的钢结构在进行纠正处理时首先通过水平仪判断钢结构的倾斜度,随后对钢结构进行纠正处理,而钢结构本身在安装过程中出现歪斜等情况时,其本身结构多段式歪斜则无法有效将钢柱进行纠正需采用多点式逐步矫直,上述方案中并不能有效处理钢结构纠正过程中的多段式处理。本发明由通过支撑板上环套内的纠正装置能够将钢柱进行纠直处理,从而以钢柱的顶端向下逐步将处于歪斜状态下的钢柱进行纠正。
Verticality correcting device for steel column of steel structure building and using method of perpendicularity correcting device
The invention relates to the field of steel column perpendicularity correction. The invention discloses a perpendicularity correcting device for a steel structure building steel column and a using method, and aims to solve the problems that when an existing steel structure is corrected, the gradient of the steel structure is judged through a gradienter firstly, and then the steel structure is corrected. And when the steel structure is skewed in the mounting process, the steel column cannot be effectively corrected due to multi-section skewing of the steel structure, and multi-point gradual straightening is needed, and multi-section treatment in the correction process of the steel structure cannot be effectively treated in the scheme. The steel column can be straightened through the correcting device in the ring sleeve on the supporting plate, so that the steel column in an inclined state is gradually corrected from the top end of the steel column downwards.
本发明涉及钢柱垂直度矫正领域。本发明公开了一种钢结构建筑钢柱的垂直度矫正装置及使用方法,本发明要解决的问题是现有的钢结构在进行纠正处理时首先通过水平仪判断钢结构的倾斜度,随后对钢结构进行纠正处理,而钢结构本身在安装过程中出现歪斜等情况时,其本身结构多段式歪斜则无法有效将钢柱进行纠正需采用多点式逐步矫直,上述方案中并不能有效处理钢结构纠正过程中的多段式处理。本发明由通过支撑板上环套内的纠正装置能够将钢柱进行纠直处理,从而以钢柱的顶端向下逐步将处于歪斜状态下的钢柱进行纠正。
Verticality correcting device for steel column of steel structure building and using method of perpendicularity correcting device
一种钢结构建筑钢柱的垂直度矫正装置及使用方法
QIU RUJIA (Autor:in) / BAO YICHUN (Autor:in) / SHEN PEI (Autor:in)
30.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Verticality correcting device for steel column of steel structure building
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|Steel column perpendicularity correcting device for high-rise steel structure
Europäisches Patentamt | 2021
|Device and method for correcting perpendicularity of socket type steel column of steel structure
Europäisches Patentamt | 2023
|