Steel pylon construction system and construction method
The invention relates to a steel pylon construction system and method.The steel pylon construction system comprises an attachment unit, a hydraulic unit and a climbing frame unit, a steel pylon comprises a stand column, a guide rail is arranged between the stand column and the climbing frame unit, and the attachment unit is detachably installed on the stand column; the climbing frame unit is connected with a connecting seat which can be hooked with the attachment unit; an attachment supporting assembly is arranged between the steel cable tower and the climbing frame unit, and the attachment supporting assembly is detachably connected among the steel cable tower, the guide rail and the climbing frame unit; the hydraulic unit is arranged between the guide rail and the climbing frame unit and comprises a hydraulic oil cylinder, reversing boxes are arranged on the upper side and the lower side of the hydraulic oil cylinder respectively, and the hydraulic oil cylinder can alternately jack the guide rail and the climbing frame unit through conversion of the reversing boxes.
本申请涉及一种钢索塔施工系统及施工方法,其中钢索塔施工系统包括:附着单元、液压单元以及爬架单元,钢索塔包括立柱,所述立柱与所述爬架单元之间设置有导轨,所述附着单元可拆卸地安装在所述立柱上,所述爬架单元连接有能够与所述附着单元发生挂接关系的连接座;所述钢索塔与所述爬架单元之间设置有附着支撑组件,所述附着支撑组件可拆卸地连接在所述钢索塔、所述导轨及所述爬架单元之间;所述液压单元设置在所述导轨与所述爬架单元之间,包括液压油缸,所述液压油缸的上下两侧分别设置有换向盒,通过所述换向盒的转变能够使所述液压油缸对所述导轨以及所述爬架单元交替顶升。
Steel pylon construction system and construction method
The invention relates to a steel pylon construction system and method.The steel pylon construction system comprises an attachment unit, a hydraulic unit and a climbing frame unit, a steel pylon comprises a stand column, a guide rail is arranged between the stand column and the climbing frame unit, and the attachment unit is detachably installed on the stand column; the climbing frame unit is connected with a connecting seat which can be hooked with the attachment unit; an attachment supporting assembly is arranged between the steel cable tower and the climbing frame unit, and the attachment supporting assembly is detachably connected among the steel cable tower, the guide rail and the climbing frame unit; the hydraulic unit is arranged between the guide rail and the climbing frame unit and comprises a hydraulic oil cylinder, reversing boxes are arranged on the upper side and the lower side of the hydraulic oil cylinder respectively, and the hydraulic oil cylinder can alternately jack the guide rail and the climbing frame unit through conversion of the reversing boxes.
本申请涉及一种钢索塔施工系统及施工方法,其中钢索塔施工系统包括:附着单元、液压单元以及爬架单元,钢索塔包括立柱,所述立柱与所述爬架单元之间设置有导轨,所述附着单元可拆卸地安装在所述立柱上,所述爬架单元连接有能够与所述附着单元发生挂接关系的连接座;所述钢索塔与所述爬架单元之间设置有附着支撑组件,所述附着支撑组件可拆卸地连接在所述钢索塔、所述导轨及所述爬架单元之间;所述液压单元设置在所述导轨与所述爬架单元之间,包括液压油缸,所述液压油缸的上下两侧分别设置有换向盒,通过所述换向盒的转变能够使所述液压油缸对所述导轨以及所述爬架单元交替顶升。
Steel pylon construction system and construction method
一种钢索塔施工系统及施工方法
GUO ZHIYONG (Autor:in) / LIAO FENG (Autor:in) / YANG ZHEN (Autor:in) / BAO YONGSHENG (Autor:in) / JIN ZHE (Autor:in) / ZHAO KE (Autor:in) / LI XIAOBO (Autor:in) / GUO HAO (Autor:in) / ZHAO SHUAI (Autor:in)
03.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Steel-concrete combined section construction method, steel pylon and cable-stayed bridge
Europäisches Patentamt | 2024
|Construction method of railway steel pylon crossing multi-track operation line
Europäisches Patentamt | 2021
|Railway steel pylon construction device crossing multi-track operation line
Europäisches Patentamt | 2021
|Trans Tech Publications | 2011
|British Library Conference Proceedings | 2011
|