The invention provides a construction platform for a large-diameter super-long pile foundation in water of a less-filler gravel-cobble layer, and belongs to the technical field of construction. Comprising a bailey beam, and block section steel is installed at one end of the bailey beam; the bailey beam assemblies are used for forming the two side parts of the construction platform. The connecting assembly is used for fixing the relative position between the bailey beam and the sectional steel; the splicing assembly is used for forming the middle part of the construction platform. By arranging the bailey beam assembly and the splicing assembly, the blocking section type steel and the bailey beam can be quickly spliced together through the arrangement of the connecting assembly, and the stability of the connecting position is good. The segmented section steel structures can be independently disassembled, the stability of the platform structure cannot be affected in the local disassembling process, the segmented section steel is matched with the splicing assemblies, the platform disassembling and assembling efficiency can be improved, the stability of other areas of the platform cannot be affected in the disassembling and assembling process, and the assembling and disassembling efficiency of the platform is improved. Therefore, the safety in the whole construction process is improved.
本发明提供一种少填充物卵砾石层水中大直径超长桩基施工平台,属于施工技术领域。包括贝雷梁,贝雷梁的一端安装有分块段型钢;贝雷梁组件用于组成施工平台的两侧部分;连接组件用于贝雷梁和分块段型钢之间的相对位置固定;拼接组件用于组成施工平台的中间部分。本发明通过设置贝雷梁组件和拼接组件,连接组件的设置使得分块段型钢和贝雷梁之间可以快速拼接在一起,而且连接位置处稳定性好。分块段型钢结构之间可以进行单独拆卸,而且在局部拆卸的过程中不会影响到平台结构的稳定性,分块段型钢配合上拼接组件的设置不仅可以提高平台拆装的效率,而且在拆装过程中不会影响到平台其他区域的稳定性,从而提高了整个施工过程中的安全性。
The invention provides a construction platform for a large-diameter super-long pile foundation in water of a less-filler gravel-cobble layer, and belongs to the technical field of construction. Comprising a bailey beam, and block section steel is installed at one end of the bailey beam; the bailey beam assemblies are used for forming the two side parts of the construction platform. The connecting assembly is used for fixing the relative position between the bailey beam and the sectional steel; the splicing assembly is used for forming the middle part of the construction platform. By arranging the bailey beam assembly and the splicing assembly, the blocking section type steel and the bailey beam can be quickly spliced together through the arrangement of the connecting assembly, and the stability of the connecting position is good. The segmented section steel structures can be independently disassembled, the stability of the platform structure cannot be affected in the local disassembling process, the segmented section steel is matched with the splicing assemblies, the platform disassembling and assembling efficiency can be improved, the stability of other areas of the platform cannot be affected in the disassembling and assembling process, and the assembling and disassembling efficiency of the platform is improved. Therefore, the safety in the whole construction process is improved.
本发明提供一种少填充物卵砾石层水中大直径超长桩基施工平台,属于施工技术领域。包括贝雷梁,贝雷梁的一端安装有分块段型钢;贝雷梁组件用于组成施工平台的两侧部分;连接组件用于贝雷梁和分块段型钢之间的相对位置固定;拼接组件用于组成施工平台的中间部分。本发明通过设置贝雷梁组件和拼接组件,连接组件的设置使得分块段型钢和贝雷梁之间可以快速拼接在一起,而且连接位置处稳定性好。分块段型钢结构之间可以进行单独拆卸,而且在局部拆卸的过程中不会影响到平台结构的稳定性,分块段型钢配合上拼接组件的设置不仅可以提高平台拆装的效率,而且在拆装过程中不会影响到平台其他区域的稳定性,从而提高了整个施工过程中的安全性。
Underwater large-diameter super-long pile foundation construction platform for less-filler gravel-cobble layer
一种少填充物卵砾石层水中大直径超长桩基施工平台
03.09.2024
Patent
Elektronische Ressource
Chinesisch
Method for driving large-diameter super-long steel casing on less-filler gravel-cobble layer
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|Construction method for jet grouting pile forming in gravel-cobble stratum
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|