Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway subgrade pavement construction device and construction method
The invention discloses a highway subgrade pavement construction device and method, and the device comprises a road pressing roller which is used for flattening a subgrade pavement; the power assembly is used for driving the road pressing roller to move; and the filling mechanism is matched with the road pressing roller and is used for discharging the filler onto the roadbed pavement. Compared with the prior art, the roadbed filling device has the beneficial effects that roadbed filling is discharged to a roadbed pavement through the filling mechanism and then is compacted by the road pressing roller, the step of independently laying the roadbed filling in a traditional scheme is avoided, and the problem of low construction efficiency is solved; due to the fact that the filling mechanism comprises the filling groove, the movable plates are installed at the bottom of the filling groove, and the discharging position and the discharging amount of roadbed filling can be conveniently and rapidly adjusted by adjusting the opening degree of the movable plates; and thirdly, the crushing mechanism is mounted below the filling mechanism, and the caked filling is crushed by the crushing mechanism, so that the roadbed filling can be prevented from being blocked in the discharge channel.
本发明公开了一种公路路基路面施工装置及施工方法,包括压路辊,用于将路基路面压平;动力组件,用于带动压路辊运动;填料机构,与压路辊配合并用于将填料排放至路基路面上。与现有的技术相比本发明的有益效果是:通过所述填料机构将路基填料排放到路基路面上,随后被所述压路辊压实,避免了传统方案中单独铺设路基填料这一步骤,解决了施工效率较低的问题;由于所述填料机构包括填料槽,所述填料槽底部安装有若干活动板,通过调整所述活动板的开度,能够方便快捷地调整路基填料的排放位置及排放量;三、由于所述填料机构下方安装有破碎机构,通过所述破碎机构对结块的填料进行破碎,能够避免路基填料在排放通道内堵塞。
Highway subgrade pavement construction device and construction method
The invention discloses a highway subgrade pavement construction device and method, and the device comprises a road pressing roller which is used for flattening a subgrade pavement; the power assembly is used for driving the road pressing roller to move; and the filling mechanism is matched with the road pressing roller and is used for discharging the filler onto the roadbed pavement. Compared with the prior art, the roadbed filling device has the beneficial effects that roadbed filling is discharged to a roadbed pavement through the filling mechanism and then is compacted by the road pressing roller, the step of independently laying the roadbed filling in a traditional scheme is avoided, and the problem of low construction efficiency is solved; due to the fact that the filling mechanism comprises the filling groove, the movable plates are installed at the bottom of the filling groove, and the discharging position and the discharging amount of roadbed filling can be conveniently and rapidly adjusted by adjusting the opening degree of the movable plates; and thirdly, the crushing mechanism is mounted below the filling mechanism, and the caked filling is crushed by the crushing mechanism, so that the roadbed filling can be prevented from being blocked in the discharge channel.
本发明公开了一种公路路基路面施工装置及施工方法,包括压路辊,用于将路基路面压平;动力组件,用于带动压路辊运动;填料机构,与压路辊配合并用于将填料排放至路基路面上。与现有的技术相比本发明的有益效果是:通过所述填料机构将路基填料排放到路基路面上,随后被所述压路辊压实,避免了传统方案中单独铺设路基填料这一步骤,解决了施工效率较低的问题;由于所述填料机构包括填料槽,所述填料槽底部安装有若干活动板,通过调整所述活动板的开度,能够方便快捷地调整路基填料的排放位置及排放量;三、由于所述填料机构下方安装有破碎机构,通过所述破碎机构对结块的填料进行破碎,能够避免路基填料在排放通道内堵塞。
Highway subgrade pavement construction device and construction method
一种公路路基路面施工装置及施工方法
HUANG PENG (Autor:in) / ZENG BIN (Autor:in) / QIAO YI (Autor:in) / ZHOU HENG (Autor:in) / XU YUEDUO (Autor:in) / DUAN KUN (Autor:in) / WANG MAOJUN (Autor:in) / WEI MINGWEI (Autor:in)
06.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Highway subgrade pavement auxiliary construction device and construction method thereof
Europäisches Patentamt | 2024
|Compaction monitoring system for highway subgrade and pavement construction
Europäisches Patentamt | 2020
|