Method for dismantling and maintaining suspender or cable clamp of suspension bridge
The invention discloses a method for dismantling and maintaining suspenders or cable clamps of a suspension bridge. The method mainly comprises the following steps of mounting a hanging basket, mounting a temporary cable clamp and a temporary cable system, tensioning and converting a permanent cable, removing the permanent cable, dismounting the permanent cable clamp, mounting the maintained permanent cable clamp, connecting the permanent cable, tensioning the temporary cable and recovering the stress of an original hanging rod, and dismounting the temporary cable and the temporary cable clamp. Main cable corrosion prevention is recovered, and the construction platform is dismantled. According to the method, the permanent cable clamp can be removed, the bridge floor is lifted by arranging the temporary sling system, and normal use of the bridge and normal passing of vehicles are guaranteed.
本发明公开了一种悬索桥吊杆或索夹拆除维修的方法,该方法主要包括有以下步骤:安装吊篮、安装临时索夹及临时吊索系统、张拉转换永久吊索、解除永久吊索、拆除永久索夹、安装维修后的永久索夹、连接永久吊索、张拉临时吊索并恢复原吊杆受力、拆除临时吊索和临时索夹、恢复主缆防腐以及拆除施工平台。该方法不仅可以实现对永久索夹的拆除,还通过设置临时吊索系统将桥面提拉住,保证桥梁的正常使用和车辆的正常通行。
Method for dismantling and maintaining suspender or cable clamp of suspension bridge
The invention discloses a method for dismantling and maintaining suspenders or cable clamps of a suspension bridge. The method mainly comprises the following steps of mounting a hanging basket, mounting a temporary cable clamp and a temporary cable system, tensioning and converting a permanent cable, removing the permanent cable, dismounting the permanent cable clamp, mounting the maintained permanent cable clamp, connecting the permanent cable, tensioning the temporary cable and recovering the stress of an original hanging rod, and dismounting the temporary cable and the temporary cable clamp. Main cable corrosion prevention is recovered, and the construction platform is dismantled. According to the method, the permanent cable clamp can be removed, the bridge floor is lifted by arranging the temporary sling system, and normal use of the bridge and normal passing of vehicles are guaranteed.
本发明公开了一种悬索桥吊杆或索夹拆除维修的方法,该方法主要包括有以下步骤:安装吊篮、安装临时索夹及临时吊索系统、张拉转换永久吊索、解除永久吊索、拆除永久索夹、安装维修后的永久索夹、连接永久吊索、张拉临时吊索并恢复原吊杆受力、拆除临时吊索和临时索夹、恢复主缆防腐以及拆除施工平台。该方法不仅可以实现对永久索夹的拆除,还通过设置临时吊索系统将桥面提拉住,保证桥梁的正常使用和车辆的正常通行。
Method for dismantling and maintaining suspender or cable clamp of suspension bridge
一种悬索桥吊杆或索夹拆除维修的方法
WANG QIAN (Autor:in) / WANG YONGKANG (Autor:in) / CHEN XIANG (Autor:in) / HAN HONGJU (Autor:in) / GONG XINGSHENG (Autor:in) / LIU BIN (Autor:in) / WANG JIANGHUA (Autor:in) / ZOU XIN (Autor:in) / XU SONG (Autor:in) / LEE JI-EUN (Autor:in)
10.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Cable clamp suspender mounting device and mounting method of cable bridge
Europäisches Patentamt | 2021
|Overall carrying dismantling method for overline suspender arch bridge