Node structure for staggered-floor basement, forming system and construction method
The invention relates to the technical field of house building construction, in particular to a joint structure for a staggered-floor basement, a forming system and a construction method.The joint structure comprises a low-floor bottom plate, a staggered-floor outer wall is arranged on one side of the low-floor bottom plate, a low-floor top plate is arranged above the low-floor bottom plate, and a lower-floor basement is formed between the low-floor bottom plate and the low-floor top plate; the coping beam is connected with a fender post, the fender post is arranged on the side, away from the lower basement, of the split-level outer wall, and the side, away from the split-level outer wall, of the fender post is connected with the native soil layer; the high-rise bottom plate is located above the split-level outer wall, the fender posts and the native soil layer, the upper surface of the high-rise bottom plate is flush with the upper surface of the low-rise top plate, and the split-level outer wall, the low-rise top plate and the high-rise bottom plate are integrally formed in a pouring mode; the waterproof coiled materials are laid below the low-layer bottom plate, between the split-level outer wall and the fender posts and between the coping beam and the high-layer bottom plate; the basement staggered floor structure has the effect that the waterproof effect is guaranteed while the construction time of the basement staggered floor structure is shortened.
本申请涉及房屋建筑施工技术领域,尤其涉及一种用于错层地下室的节点结构、成型系统及施工方法,包括低层底板,低层底板一侧设置有错层外墙,低层底板上方设置有低层顶板,低层底板和低层顶板之间形成下层地下室;压顶梁,压顶梁上连接有围护桩,围护桩设置于错层外墙远离下层地下室一侧,围护桩远离错层外墙一侧与原生土层连接;高层底板,高层底板位于错层外墙、围护桩以及原生土层上方,高层底板上表面与低层顶板上表面齐平设置,且错层外墙、低层顶板以及高层底板一体浇筑成型;防水卷材,防水卷材铺设于低层底板下方、错层外墙和围护桩之间以及压顶梁和高层底板之间;本申请具有在缩短地下室错层结构施工时间的同时保障防水效果的效果。
Node structure for staggered-floor basement, forming system and construction method
The invention relates to the technical field of house building construction, in particular to a joint structure for a staggered-floor basement, a forming system and a construction method.The joint structure comprises a low-floor bottom plate, a staggered-floor outer wall is arranged on one side of the low-floor bottom plate, a low-floor top plate is arranged above the low-floor bottom plate, and a lower-floor basement is formed between the low-floor bottom plate and the low-floor top plate; the coping beam is connected with a fender post, the fender post is arranged on the side, away from the lower basement, of the split-level outer wall, and the side, away from the split-level outer wall, of the fender post is connected with the native soil layer; the high-rise bottom plate is located above the split-level outer wall, the fender posts and the native soil layer, the upper surface of the high-rise bottom plate is flush with the upper surface of the low-rise top plate, and the split-level outer wall, the low-rise top plate and the high-rise bottom plate are integrally formed in a pouring mode; the waterproof coiled materials are laid below the low-layer bottom plate, between the split-level outer wall and the fender posts and between the coping beam and the high-layer bottom plate; the basement staggered floor structure has the effect that the waterproof effect is guaranteed while the construction time of the basement staggered floor structure is shortened.
本申请涉及房屋建筑施工技术领域,尤其涉及一种用于错层地下室的节点结构、成型系统及施工方法,包括低层底板,低层底板一侧设置有错层外墙,低层底板上方设置有低层顶板,低层底板和低层顶板之间形成下层地下室;压顶梁,压顶梁上连接有围护桩,围护桩设置于错层外墙远离下层地下室一侧,围护桩远离错层外墙一侧与原生土层连接;高层底板,高层底板位于错层外墙、围护桩以及原生土层上方,高层底板上表面与低层顶板上表面齐平设置,且错层外墙、低层顶板以及高层底板一体浇筑成型;防水卷材,防水卷材铺设于低层底板下方、错层外墙和围护桩之间以及压顶梁和高层底板之间;本申请具有在缩短地下室错层结构施工时间的同时保障防水效果的效果。
Node structure for staggered-floor basement, forming system and construction method
一种用于错层地下室的节点结构、成型系统及施工方法
XU JIE (Autor:in) / TAN HONGKUN (Autor:in) / WU WEICHENG (Autor:in) / SHAO JUNHUA (Autor:in) / DING JUNTAO (Autor:in)
10.09.2024
Patent
Elektronische Ressource
Chinesisch
Basement floor construction method and basement floor structure
Europäisches Patentamt | 2020
|Old basement floor waterproof structure and construction technology
Europäisches Patentamt | 2023
|Basement backfill soil layer structure floor slab construction method
Europäisches Patentamt | 2021
|