Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Suspension rod overhauling device for suspension bridge
The invention discloses a suspender overhauling device for a suspension bridge, and belongs to the technical field of bridges. Comprising a left climbing mechanism, a right climbing mechanism and a locking mechanism, wherein the left climbing mechanism and the right climbing mechanism are arranged in mirror symmetry; the left side climbing mechanism comprises a mounting plate, climbing units are arranged at the four corners of the mounting plate, the climbing units are horizontally connected to the mounting plate in a sliding mode, and two width adjusting units used for adjusting the contact positions of the climbing units and the hanging rod are arranged on the side face, facing the hanging rod, of the mounting plate. Each width adjusting unit comprises a first sliding rod, and the two ends of each first sliding rod are fixedly connected to the mounting plate. The technical scheme is used for solving the problem that a suspender detection device in the prior art is difficult to meet the condition that two suspenders are arranged on the same anchoring point on a suspension bridge, and the problem that the climbing effect of a climbing unit for detecting a system is poor due to the change of the distance between the two suspenders.
本发明公开了一种用于悬索桥的吊杆检修装置,属于桥梁技术领域。包括镜像对称设置的左侧攀爬机构和右侧攀爬机构以及将左侧攀爬机构和右侧攀爬机构连接的锁紧机构;所述左侧攀爬机构包括安装板,所述安装板的四角处均设有攀爬单元,所述攀爬单元水平滑动连接与安装板上,所述安装板朝向吊杆的一侧面上设有两组分别用以调节攀爬单元与吊杆接触位置的宽度调节单元,一组所述宽度调节单元包括第一滑杆,所述第一滑杆的两端固定连接于安装板上。本技术方案用于解决现有技术中的吊杆检测装置,难以满足悬索桥上同一锚固点上设置两根吊杆的情况的问题,以及双吊杆之间的间距变化会导致检测装制度的攀爬单元爬行效果不佳的问题。
Suspension rod overhauling device for suspension bridge
The invention discloses a suspender overhauling device for a suspension bridge, and belongs to the technical field of bridges. Comprising a left climbing mechanism, a right climbing mechanism and a locking mechanism, wherein the left climbing mechanism and the right climbing mechanism are arranged in mirror symmetry; the left side climbing mechanism comprises a mounting plate, climbing units are arranged at the four corners of the mounting plate, the climbing units are horizontally connected to the mounting plate in a sliding mode, and two width adjusting units used for adjusting the contact positions of the climbing units and the hanging rod are arranged on the side face, facing the hanging rod, of the mounting plate. Each width adjusting unit comprises a first sliding rod, and the two ends of each first sliding rod are fixedly connected to the mounting plate. The technical scheme is used for solving the problem that a suspender detection device in the prior art is difficult to meet the condition that two suspenders are arranged on the same anchoring point on a suspension bridge, and the problem that the climbing effect of a climbing unit for detecting a system is poor due to the change of the distance between the two suspenders.
本发明公开了一种用于悬索桥的吊杆检修装置,属于桥梁技术领域。包括镜像对称设置的左侧攀爬机构和右侧攀爬机构以及将左侧攀爬机构和右侧攀爬机构连接的锁紧机构;所述左侧攀爬机构包括安装板,所述安装板的四角处均设有攀爬单元,所述攀爬单元水平滑动连接与安装板上,所述安装板朝向吊杆的一侧面上设有两组分别用以调节攀爬单元与吊杆接触位置的宽度调节单元,一组所述宽度调节单元包括第一滑杆,所述第一滑杆的两端固定连接于安装板上。本技术方案用于解决现有技术中的吊杆检测装置,难以满足悬索桥上同一锚固点上设置两根吊杆的情况的问题,以及双吊杆之间的间距变化会导致检测装制度的攀爬单元爬行效果不佳的问题。
Suspension rod overhauling device for suspension bridge
一种用于悬索桥的吊杆检修装置
HUANG XIAOBIN (Autor:in) / WAN XIANQING (Autor:in) / GAO XIAOMING (Autor:in) / QIU YANJIAN (Autor:in) / HU HAO (Autor:in) / ZHU YAODONG (Autor:in) / DUAN YINFANG (Autor:in) / LI QINGHUA (Autor:in) / YAN YUTAO (Autor:in) / CHEN JING (Autor:in)
13.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Displaceable and adjustable obstacle crossing device for overhauling main cable of suspension bridge
Europäisches Patentamt | 2020
|SUSPENSION BRIDGE FRAME, SUSPENSION BRIDGE, AND SUSPENSION BRIDGE ERECTION METHOD
Europäisches Patentamt | 2020
|