Concrete pouring construction control instrument for long spiral cast-in-situ bored pile
The invention relates to a long spiral cast-in-situ bored pile concrete pouring construction control instrument which comprises a lifting assembly, a rotating assembly is installed at the top of the lifting assembly, an adjusting assembly is installed at the top of the rotating assembly, and a working assembly is installed at the top of the adjusting assembly. The working assembly comprises a spiral drill rod, a drill bit is installed at the bottom of the spiral drill rod, a valve controller is installed at the bottom of the drill bit, a concrete flow velocity monitor is installed at the top of the spiral drill rod, and a night vision probe is installed at the top of the drill bit. The concrete flow velocity monitoring device has the beneficial effects that concrete can be injected into the connecting pipe of the spiral drill rod through the through pipe at the concrete flow velocity monitoring instrument and is discharged from the drill bit connected with the bottom of the connecting pipe, and corresponding pouring work is carried out on a pit hole. The concrete flow velocity monitor can monitor the rate of poured concrete, meanwhile, the output flow of the concrete can be controlled through the valve controller at the bottom of the working drill bit, and the pouring process can be conveniently controlled.
本发明涉及一种长螺旋钻孔灌注桩混凝土浇筑施工控制仪器,包括升降组件,升降组件的顶部安装有旋转组件,旋转组件的顶部安装有调节组件,调节组件的顶部安装有工作组件;工作组件包括螺旋钻杆,螺旋钻杆的底部安装有钻头,钻头的底部安装有阀门控制器,螺旋钻杆的顶部安装有混凝土流速监测仪,钻头的顶部安装有夜视探头。其有益效果是,通过混凝土流速监测仪处的通管,可将混凝土注入螺旋钻杆的连接管中,并从连接管底部连接的钻头处排出,对坑洞进行相应的浇筑工作。混凝土流速监测仪可对浇筑的混凝土速率进行监测,同时可通过工作钻头底部的阀门控制器,对混凝土的输出流量进行控制,便于对浇筑过程进行控制。
Concrete pouring construction control instrument for long spiral cast-in-situ bored pile
The invention relates to a long spiral cast-in-situ bored pile concrete pouring construction control instrument which comprises a lifting assembly, a rotating assembly is installed at the top of the lifting assembly, an adjusting assembly is installed at the top of the rotating assembly, and a working assembly is installed at the top of the adjusting assembly. The working assembly comprises a spiral drill rod, a drill bit is installed at the bottom of the spiral drill rod, a valve controller is installed at the bottom of the drill bit, a concrete flow velocity monitor is installed at the top of the spiral drill rod, and a night vision probe is installed at the top of the drill bit. The concrete flow velocity monitoring device has the beneficial effects that concrete can be injected into the connecting pipe of the spiral drill rod through the through pipe at the concrete flow velocity monitoring instrument and is discharged from the drill bit connected with the bottom of the connecting pipe, and corresponding pouring work is carried out on a pit hole. The concrete flow velocity monitor can monitor the rate of poured concrete, meanwhile, the output flow of the concrete can be controlled through the valve controller at the bottom of the working drill bit, and the pouring process can be conveniently controlled.
本发明涉及一种长螺旋钻孔灌注桩混凝土浇筑施工控制仪器,包括升降组件,升降组件的顶部安装有旋转组件,旋转组件的顶部安装有调节组件,调节组件的顶部安装有工作组件;工作组件包括螺旋钻杆,螺旋钻杆的底部安装有钻头,钻头的底部安装有阀门控制器,螺旋钻杆的顶部安装有混凝土流速监测仪,钻头的顶部安装有夜视探头。其有益效果是,通过混凝土流速监测仪处的通管,可将混凝土注入螺旋钻杆的连接管中,并从连接管底部连接的钻头处排出,对坑洞进行相应的浇筑工作。混凝土流速监测仪可对浇筑的混凝土速率进行监测,同时可通过工作钻头底部的阀门控制器,对混凝土的输出流量进行控制,便于对浇筑过程进行控制。
Concrete pouring construction control instrument for long spiral cast-in-situ bored pile
一种长螺旋钻孔灌注桩混凝土浇筑施工控制仪器
DONG ZHI (Autor:in) / GUO SHIHUA (Autor:in) / YU JUN (Autor:in) / WANG YUXIANG (Autor:in) / GE YIQUN (Autor:in)
13.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E21B
EARTH OR ROCK DRILLING
,
Erd- oder Gesteinsbohren
/
G01B
MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS
,
Messen der Länge, der Dicke oder ähnlicher linearer Abmessungen
/
G01P
MEASURING LINEAR OR ANGULAR SPEED, ACCELERATION, DECELERATION OR SHOCK
,
Messen der Linear- oder Winkelgeschwindigkeit, der Beschleunigung, der Verzögerung oder des Stoßes
Underwater concrete pouring device for cast-in-situ bored pile
Europäisches Patentamt | 2021
|Construction technology for long spiral cast-in-situ bored pile
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2022
|Construction method of long spiral cast-in-situ bored pile
Europäisches Patentamt | 2022
|Method for monitoring concrete pouring height of cast-in-situ bored pile
Europäisches Patentamt | 2024
|