Construction method for protecting and positioning device of cast-in-place floor for dense embedded pipelines
The invention discloses a construction method of a protection positioning device of a cast-in-place floor for dense embedded pipelines, which comprises the following steps: manufacturing pipeline embedded positioning horse stool ribs according to the concrete pouring thickness of the floor and the number of the embedded pipelines, hoisting the processed positioning horse stool ribs to a construction embedded pipeline mounting site by using a tower crane, and after reinforcing steel bars at the bottom of the floor are bound, hoisting the positioning horse stool ribs to a construction embedded pipeline mounting site; the positioning horse stool ribs are fixed to the bottom plate reinforcing steel bars, the embedded pipelines penetrate through the positioning horse stool ribs and are firmly fixed through binding wires, and after all the embedded pipelines are installed, a reinforcing steel bar operator can bind the floor surface reinforcing steel bars. According to the method, through the positioning device, the dense pre-buried pipelines are accurately bound to the design positions, it is ensured that the pipelines are placed according to the standard intervals, and therefore displacement is effectively prevented during concrete pouring. According to the method combining the stirrup ribs and the positioning device, the stability of the pipeline is improved, the problem of pre-burying of the water and electricity pipeline in the decoration stage is solved in advance in the main body structure construction stage, and the construction efficiency and quality are greatly improved.
本发明公开了一种现浇楼板对密集预埋管线的保护定位装置施工方法,根据楼板混凝土浇筑厚度与预埋管线数量制作管线预埋定位马凳筋,将加工好的定位马凳筋使用塔吊吊运至施工预埋管线安装现场,待楼板板底钢筋绑扎完毕后,将定位马凳筋固定在底板钢筋上,将预埋管线穿至定位马凳筋下,使用扎丝固定牢固,待所有预埋管线安装完毕后,钢筋工方可绑扎楼板面钢筋。本发明方法通过定位装置,将密集的预埋管线精确地绑扎在设计位置上,确保管线按照规范间距摆放,从而有效防止在浇筑混凝土时发生位移。这种结合马蹬筋和定位装置的方法,不仅提高了管线的稳定性,更在主体结构施工阶段就预先解决了装修阶段中的水电管线预埋问题,大大提高了施工效率和质量。
Construction method for protecting and positioning device of cast-in-place floor for dense embedded pipelines
The invention discloses a construction method of a protection positioning device of a cast-in-place floor for dense embedded pipelines, which comprises the following steps: manufacturing pipeline embedded positioning horse stool ribs according to the concrete pouring thickness of the floor and the number of the embedded pipelines, hoisting the processed positioning horse stool ribs to a construction embedded pipeline mounting site by using a tower crane, and after reinforcing steel bars at the bottom of the floor are bound, hoisting the positioning horse stool ribs to a construction embedded pipeline mounting site; the positioning horse stool ribs are fixed to the bottom plate reinforcing steel bars, the embedded pipelines penetrate through the positioning horse stool ribs and are firmly fixed through binding wires, and after all the embedded pipelines are installed, a reinforcing steel bar operator can bind the floor surface reinforcing steel bars. According to the method, through the positioning device, the dense pre-buried pipelines are accurately bound to the design positions, it is ensured that the pipelines are placed according to the standard intervals, and therefore displacement is effectively prevented during concrete pouring. According to the method combining the stirrup ribs and the positioning device, the stability of the pipeline is improved, the problem of pre-burying of the water and electricity pipeline in the decoration stage is solved in advance in the main body structure construction stage, and the construction efficiency and quality are greatly improved.
本发明公开了一种现浇楼板对密集预埋管线的保护定位装置施工方法,根据楼板混凝土浇筑厚度与预埋管线数量制作管线预埋定位马凳筋,将加工好的定位马凳筋使用塔吊吊运至施工预埋管线安装现场,待楼板板底钢筋绑扎完毕后,将定位马凳筋固定在底板钢筋上,将预埋管线穿至定位马凳筋下,使用扎丝固定牢固,待所有预埋管线安装完毕后,钢筋工方可绑扎楼板面钢筋。本发明方法通过定位装置,将密集的预埋管线精确地绑扎在设计位置上,确保管线按照规范间距摆放,从而有效防止在浇筑混凝土时发生位移。这种结合马蹬筋和定位装置的方法,不仅提高了管线的稳定性,更在主体结构施工阶段就预先解决了装修阶段中的水电管线预埋问题,大大提高了施工效率和质量。
Construction method for protecting and positioning device of cast-in-place floor for dense embedded pipelines
一种现浇楼板对密集预埋管线的保护定位装置施工方法
HUANG ZHENJIANG (Autor:in)
13.09.2024
Patent
Elektronische Ressource
Chinesisch
Pipeline protecting and positioning device of cast-in-place floor
Europäisches Patentamt | 2024
|Cast-in-place floor slab thickness embedded control construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2023
|Construction method of cast-in-place reinforced concrete dense ribbed beam floor
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2021
|