Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Work area setting system
The invention provides a work area setting system capable of easily setting a work area. The work area setting system includes a first straight line setting unit, a second straight line setting unit, and an area setting unit. The first straight line setting unit sets a first straight line (L1) that passes through a first point (PA) where a distal end (33) of the attachment is located and is parallel to an operating surface of the attachment (30) in plan view when the upper rotating body (22) faces the first direction. The second straight line setting unit sets a second straight line (L2) that passes through a second point (PB) where a distal end (33) of the attachment is located and is parallel to the operating surface in plan view when the upper rotating body (22) is oriented in a second direction different from the first direction. The region setting unit sets, as a work region (80), a region sandwiched between the first straight line (L1) and the second straight line (L2) in plan view.
本发明提供能够容易地设定作业区域的作业区域设定系统,其包括第一直线设定部、第二直线设定部及区域设定部。第一直线设定部设定在上部回转体(22)朝向第一方向时,经过附属装置的远端(33)所在的第一点(PA)且在俯视下与附属装置(30)的动作面平行的第一直线(L1)。第二直线设定部设定在上部回转体(22)朝向与第一方向不同的第二方向时,经过附属装置的远端(33)所在的第二点(PB)且在俯视下与动作面平行的第二直线(L2)。区域设定部将在俯视下被夹在第一直线(L1)和第二直线(L2)之间的区域设定为作业区域(80)。
Work area setting system
The invention provides a work area setting system capable of easily setting a work area. The work area setting system includes a first straight line setting unit, a second straight line setting unit, and an area setting unit. The first straight line setting unit sets a first straight line (L1) that passes through a first point (PA) where a distal end (33) of the attachment is located and is parallel to an operating surface of the attachment (30) in plan view when the upper rotating body (22) faces the first direction. The second straight line setting unit sets a second straight line (L2) that passes through a second point (PB) where a distal end (33) of the attachment is located and is parallel to the operating surface in plan view when the upper rotating body (22) is oriented in a second direction different from the first direction. The region setting unit sets, as a work region (80), a region sandwiched between the first straight line (L1) and the second straight line (L2) in plan view.
本发明提供能够容易地设定作业区域的作业区域设定系统,其包括第一直线设定部、第二直线设定部及区域设定部。第一直线设定部设定在上部回转体(22)朝向第一方向时,经过附属装置的远端(33)所在的第一点(PA)且在俯视下与附属装置(30)的动作面平行的第一直线(L1)。第二直线设定部设定在上部回转体(22)朝向与第一方向不同的第二方向时,经过附属装置的远端(33)所在的第二点(PB)且在俯视下与动作面平行的第二直线(L2)。区域设定部将在俯视下被夹在第一直线(L1)和第二直线(L2)之间的区域设定为作业区域(80)。
Work area setting system
作业区域设定系统
FUKUO NOBUHIRO (Autor:in) / MIYAZAKI RYUNOSUKE (Autor:in)
13.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02F
Baggern
,
DREDGING
WORK AREA SETTING SYSTEM, AND WORK OBJECT DETECTION SYSTEM
Europäisches Patentamt | 2022
|Work area setting system and operation target detection system
Europäisches Patentamt | 2023
|