Modular construction method for fabricated steel structure factory building
The invention discloses a modular construction method for a fabricated steel structure factory building. Characterized in that; comprising the following steps; formulating a construction scheme; detecting, measuring and mounting foundation bolts; detecting the material, and blanking and correcting the steel structure plate; grouping and welding the components; polishing, derusting and coating the component; transporting the components into a site; mounting a box column, and erecting a hanging ladder; carrying out overall installation simulation and process monitoring on the steel structure; mounting and detecting a steel beam, and mounting a floor support plate; roof color steel tiles are installed; and weld joint polishing, flaw detection, paint supplementary brushing and fireproof coating coating are conducted. The progress and quality of the hoisting process are visually controlled, the installation precision is high, the installation quality is improved, the construction efficiency is high, and the cost is low.
本发明公开了一种装配式钢结构厂房模块化施工方法;其特征在于;包括以下步骤;施工方案的制定;检测、测量、地脚螺栓安装;材料检测、钢结构板材下料、矫正;构件组队、焊接;构件的打磨除锈涂装;构件运输进场;箱型柱安装、挂梯搭设;钢结构整体安装模拟、过程监测;钢梁安装,检测、楼承板安装;屋面彩钢瓦安装;焊缝打磨、探伤、油漆补刷,防火涂料涂装。本发明吊装过程进度和质量的可视化控制,安装精度高,提高安装质量,施工效率高、成本低。
Modular construction method for fabricated steel structure factory building
The invention discloses a modular construction method for a fabricated steel structure factory building. Characterized in that; comprising the following steps; formulating a construction scheme; detecting, measuring and mounting foundation bolts; detecting the material, and blanking and correcting the steel structure plate; grouping and welding the components; polishing, derusting and coating the component; transporting the components into a site; mounting a box column, and erecting a hanging ladder; carrying out overall installation simulation and process monitoring on the steel structure; mounting and detecting a steel beam, and mounting a floor support plate; roof color steel tiles are installed; and weld joint polishing, flaw detection, paint supplementary brushing and fireproof coating coating are conducted. The progress and quality of the hoisting process are visually controlled, the installation precision is high, the installation quality is improved, the construction efficiency is high, and the cost is low.
本发明公开了一种装配式钢结构厂房模块化施工方法;其特征在于;包括以下步骤;施工方案的制定;检测、测量、地脚螺栓安装;材料检测、钢结构板材下料、矫正;构件组队、焊接;构件的打磨除锈涂装;构件运输进场;箱型柱安装、挂梯搭设;钢结构整体安装模拟、过程监测;钢梁安装,检测、楼承板安装;屋面彩钢瓦安装;焊缝打磨、探伤、油漆补刷,防火涂料涂装。本发明吊装过程进度和质量的可视化控制,安装精度高,提高安装质量,施工效率高、成本低。
Modular construction method for fabricated steel structure factory building
一种装配式钢结构厂房模块化施工方法
ZHONG TAIYONG (Autor:in) / WANG YANG (Autor:in) / ZHANG JINGSONG (Autor:in) / ZHANG HENGRUI (Autor:in)
17.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
A62B
DEVICES, APPARATUS OR METHODS FOR LIFE-SAVING
,
Vorrichtungen, Geräte oder Verfahren zur Lebensrettung
/
B23K
Löten
,
SOLDERING OR UNSOLDERING
/
B25H
Werkstatteinrichtungen, z.B. zum Anreißen von Werkstücken
,
WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK
/
E04D
ROOF COVERINGS
,
Dacheindeckungen
/
E04G
SCAFFOLDING
,
Baugerüste
Steel structure factory building construction structure
Europäisches Patentamt | 2022
|Fabricated roof drainage structure of modular building, modular building and construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|