Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Novel hidden frame beam-column joint structure
The invention discloses a novel hidden type frame beam column joint structure which comprises a concrete frame column provided with a column cap, a concrete frame beam arranged on the column cap, a concrete frame beam pipeline arranged at the position, close to the bottom, of the concrete frame beam, a concrete frame column lower layer pipeline arranged on the concrete frame column, and a lower main reinforcement laid in the concrete frame beam pipeline. The lower main reinforcements penetrate through the lower-layer pipeline of the concrete frame column; a laminated layer is arranged above the concrete frame beam, the concrete frame column is provided with a concrete frame column upper-layer pipeline, an upper main reinforcement is arranged in the concrete frame column upper-layer pipeline, and the upper main reinforcement penetrates through the laminated layer; stirrups are arranged between the concrete frame columns and the concrete frame beams; grouting materials are arranged between the concrete frame column lower-layer pipeline, the concrete frame beam pipeline and the lower main reinforcement as well as between the concrete frame column upper-layer pipeline and the upper main reinforcement, and a repouring concrete material is arranged between the concrete frame column and the concrete frame beam. According to the scheme, construction is rapid, the engineering cost is remarkably reduced, and low-carbon and environment-friendly effects are achieved.
本发明公开了一种新型隐藏式框架梁柱节点结构,包括混凝土框架柱设柱帽,柱帽上放混凝土框架梁,混凝土框架梁靠近底部位置设混凝土框架梁管道,混凝土框架柱设混凝土框架柱下层管道,混凝土框架梁管道内铺设下部主筋,下部主筋穿行于混凝土框架柱下层管道内;混凝土框架梁上方设叠合层,混凝土框架柱设混凝土框架柱上层管道,混凝土框架柱上层管道内设上部主筋,上部主筋穿行于叠合层内;混凝土框架柱和混凝土框架梁之间设有箍筋;混凝土框架柱下层管道、混凝土框架梁管道和下部主筋以及混凝土框架柱上层管道和上部主筋之间均设灌浆料,混凝土框架柱和混凝土框架梁之间设补浇混凝土料,本方案施工快捷、工程成本显著降低、绿色低碳环保。
Novel hidden frame beam-column joint structure
The invention discloses a novel hidden type frame beam column joint structure which comprises a concrete frame column provided with a column cap, a concrete frame beam arranged on the column cap, a concrete frame beam pipeline arranged at the position, close to the bottom, of the concrete frame beam, a concrete frame column lower layer pipeline arranged on the concrete frame column, and a lower main reinforcement laid in the concrete frame beam pipeline. The lower main reinforcements penetrate through the lower-layer pipeline of the concrete frame column; a laminated layer is arranged above the concrete frame beam, the concrete frame column is provided with a concrete frame column upper-layer pipeline, an upper main reinforcement is arranged in the concrete frame column upper-layer pipeline, and the upper main reinforcement penetrates through the laminated layer; stirrups are arranged between the concrete frame columns and the concrete frame beams; grouting materials are arranged between the concrete frame column lower-layer pipeline, the concrete frame beam pipeline and the lower main reinforcement as well as between the concrete frame column upper-layer pipeline and the upper main reinforcement, and a repouring concrete material is arranged between the concrete frame column and the concrete frame beam. According to the scheme, construction is rapid, the engineering cost is remarkably reduced, and low-carbon and environment-friendly effects are achieved.
本发明公开了一种新型隐藏式框架梁柱节点结构,包括混凝土框架柱设柱帽,柱帽上放混凝土框架梁,混凝土框架梁靠近底部位置设混凝土框架梁管道,混凝土框架柱设混凝土框架柱下层管道,混凝土框架梁管道内铺设下部主筋,下部主筋穿行于混凝土框架柱下层管道内;混凝土框架梁上方设叠合层,混凝土框架柱设混凝土框架柱上层管道,混凝土框架柱上层管道内设上部主筋,上部主筋穿行于叠合层内;混凝土框架柱和混凝土框架梁之间设有箍筋;混凝土框架柱下层管道、混凝土框架梁管道和下部主筋以及混凝土框架柱上层管道和上部主筋之间均设灌浆料,混凝土框架柱和混凝土框架梁之间设补浇混凝土料,本方案施工快捷、工程成本显著降低、绿色低碳环保。
Novel hidden frame beam-column joint structure
一种新型隐藏式框架梁柱节点结构
CHEN JIN (Autor:in) / SHEN HOULIN (Autor:in) / ZHU QIUDONG (Autor:in)
20.09.2024
Patent
Elektronische Ressource
Chinesisch
Novel prefabricated frame structure beam column dry type connecting joint
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|