Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Basement outer wall structure of assembly type transformer substation
The invention belongs to the technical field of assembly type structures, and discloses an assembly type transformer substation basement exterior wall structure which comprises a prefabricated wall body, a connecting piece and a base. The prefabricated wall body comprises ribbed wall bodies and connecting wall bodies, the ribbed wall bodies and the connecting wall bodies are sequentially and alternately connected in the first horizontal direction, the width of the ribbed wall bodies is larger than that of the connecting wall bodies in the second horizontal direction, and by increasing the thickness of the ribbed wall bodies, the bearing capacity of a local structure can be improved; and by reducing the thickness of the connecting wall body, the using amount of concrete can be reduced, and the integrity of the fabricated transformer substation basement outer wall structure is ensured. The connecting piece is arranged in the prefabricated wall body, so that the self-strength of the whole structure is further improved, and the bearing capacity of the whole structure is improved. The base is arranged at the bottom end of the prefabricated wall body in the vertical direction and connected to the connecting piece so that the stability of the whole structure can be improved. Meanwhile, through factory prefabrication of the prefabricated wall body, the field wet construction amount is reduced, and the construction efficiency is improved.
本发明属于装配式结构技术领域,公开了一种装配式变电站地下室外墙结构,其包括预制墙体、连接件和基座。预制墙体包括带肋墙体和连接墙体,带肋墙体和连接墙体沿第一水平方向依次交替连接,沿第二水平方向,带肋墙体的宽度大于连接墙体的宽度,通过增加带肋墙体的自身厚度,能够提高局部结构的承载能力,而通过减少连接墙体的自身厚度,能够减少混凝土的使用量,确保装配式变电站地下室外墙结构的整体性。连接件设置于预制墙体中,以进一步提高整体结构的自身强度,提高其承载能力。基座沿竖直方向设置于预制墙体的底端,并连接于连接件,以提高整体结构的稳固性。同时,通过预制墙体的工厂预制,减少了现场湿作业量,提高了施工效率。
Basement outer wall structure of assembly type transformer substation
The invention belongs to the technical field of assembly type structures, and discloses an assembly type transformer substation basement exterior wall structure which comprises a prefabricated wall body, a connecting piece and a base. The prefabricated wall body comprises ribbed wall bodies and connecting wall bodies, the ribbed wall bodies and the connecting wall bodies are sequentially and alternately connected in the first horizontal direction, the width of the ribbed wall bodies is larger than that of the connecting wall bodies in the second horizontal direction, and by increasing the thickness of the ribbed wall bodies, the bearing capacity of a local structure can be improved; and by reducing the thickness of the connecting wall body, the using amount of concrete can be reduced, and the integrity of the fabricated transformer substation basement outer wall structure is ensured. The connecting piece is arranged in the prefabricated wall body, so that the self-strength of the whole structure is further improved, and the bearing capacity of the whole structure is improved. The base is arranged at the bottom end of the prefabricated wall body in the vertical direction and connected to the connecting piece so that the stability of the whole structure can be improved. Meanwhile, through factory prefabrication of the prefabricated wall body, the field wet construction amount is reduced, and the construction efficiency is improved.
本发明属于装配式结构技术领域,公开了一种装配式变电站地下室外墙结构,其包括预制墙体、连接件和基座。预制墙体包括带肋墙体和连接墙体,带肋墙体和连接墙体沿第一水平方向依次交替连接,沿第二水平方向,带肋墙体的宽度大于连接墙体的宽度,通过增加带肋墙体的自身厚度,能够提高局部结构的承载能力,而通过减少连接墙体的自身厚度,能够减少混凝土的使用量,确保装配式变电站地下室外墙结构的整体性。连接件设置于预制墙体中,以进一步提高整体结构的自身强度,提高其承载能力。基座沿竖直方向设置于预制墙体的底端,并连接于连接件,以提高整体结构的稳固性。同时,通过预制墙体的工厂预制,减少了现场湿作业量,提高了施工效率。
Basement outer wall structure of assembly type transformer substation
装配式变电站地下室外墙结构
ZHENG YAFEI (Autor:in) / SHEN QUAN (Autor:in)
20.09.2024
Patent
Elektronische Ressource
Chinesisch
Basement outer wall expansion joint waterproof structure
Europäisches Patentamt | 2021
|