Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Wind driven generator foundation anchor bolt construction method
The invention belongs to the technical field of fan foundation construction in construction engineering, and particularly relates to a construction method for a foundation anchor bolt of a wind driven generator. When the anchor bolt assembly is prepared, the distance between the upper end face of the positioning anchor bolt and the upper end face of the nylon nut in the axial direction of the positioning anchor bolt is set to be L1, and the distance between the upper end face of the positioning anchor bolt and the lower end face of the second nut in the axial direction of the positioning anchor bolt is set to be L2; a detachable guide sleeve is coaxially arranged at the top end of the positioning anchor bolt in a threaded connection manner; the distance between the upper end face of the common anchor bolt and the lower end face of the second nut in the axial direction of the common anchor bolt is set to be L3, and L3 is equal to L2. Before the upper anchor plate is installed, the guide sleeve is arranged at the top end of the positioning anchor bolt, the upper anchor plate can be conveniently installed in place, after the upper anchor plate is installed, the guide sleeve can be directly screwed out through a threaded connection structure, the original structure of the anchor bolt is not affected, at the moment, the upper end face of the positioning anchor bolt is flush with the upper end face of a common anchor bolt, and the exposed lengths of all the anchor bolts are consistent; and the anchor bolt is convenient to stretch and draw.
本发明属于建设工程中的风机基础施工技术领域,具体涉及一种风力发电机基础锚栓施工方法。本发明在准备锚栓组件时,定位锚栓的上端面与尼龙螺母的上端面之间在定位锚栓轴向的间距设定为L1,定位锚栓的上端面与螺母二的下端面之间在定位锚栓轴向的间距设定为L2,然后在定位锚栓的顶端螺纹连接地同轴设置有可拆卸的导向套;普通锚栓的上端面与螺母二的下端面之间在普通锚栓轴向的间距设定为L3,L3=L2。在上锚板安装前,定位锚栓的顶端设置有导向套,可以方便上锚板的安装就位,在完成上锚板安装后,可利用螺纹连接结构直接旋出导向套,不影响锚栓的原有结构,此时定位锚栓和普通锚栓的上端面齐平,所有锚栓外露长度一致,锚栓张拉也较为方便。
Wind driven generator foundation anchor bolt construction method
The invention belongs to the technical field of fan foundation construction in construction engineering, and particularly relates to a construction method for a foundation anchor bolt of a wind driven generator. When the anchor bolt assembly is prepared, the distance between the upper end face of the positioning anchor bolt and the upper end face of the nylon nut in the axial direction of the positioning anchor bolt is set to be L1, and the distance between the upper end face of the positioning anchor bolt and the lower end face of the second nut in the axial direction of the positioning anchor bolt is set to be L2; a detachable guide sleeve is coaxially arranged at the top end of the positioning anchor bolt in a threaded connection manner; the distance between the upper end face of the common anchor bolt and the lower end face of the second nut in the axial direction of the common anchor bolt is set to be L3, and L3 is equal to L2. Before the upper anchor plate is installed, the guide sleeve is arranged at the top end of the positioning anchor bolt, the upper anchor plate can be conveniently installed in place, after the upper anchor plate is installed, the guide sleeve can be directly screwed out through a threaded connection structure, the original structure of the anchor bolt is not affected, at the moment, the upper end face of the positioning anchor bolt is flush with the upper end face of a common anchor bolt, and the exposed lengths of all the anchor bolts are consistent; and the anchor bolt is convenient to stretch and draw.
本发明属于建设工程中的风机基础施工技术领域,具体涉及一种风力发电机基础锚栓施工方法。本发明在准备锚栓组件时,定位锚栓的上端面与尼龙螺母的上端面之间在定位锚栓轴向的间距设定为L1,定位锚栓的上端面与螺母二的下端面之间在定位锚栓轴向的间距设定为L2,然后在定位锚栓的顶端螺纹连接地同轴设置有可拆卸的导向套;普通锚栓的上端面与螺母二的下端面之间在普通锚栓轴向的间距设定为L3,L3=L2。在上锚板安装前,定位锚栓的顶端设置有导向套,可以方便上锚板的安装就位,在完成上锚板安装后,可利用螺纹连接结构直接旋出导向套,不影响锚栓的原有结构,此时定位锚栓和普通锚栓的上端面齐平,所有锚栓外露长度一致,锚栓张拉也较为方便。
Wind driven generator foundation anchor bolt construction method
风力发电机基础锚栓施工方法
DUAN LIAN (Autor:in) / ZHANG GUOZHI (Autor:in) / KANG JINGLAN (Autor:in) / TAO YONGBIN (Autor:in) / LI YILONG (Autor:in) / DENG KE (Autor:in) / QIN CHENGLONG (Autor:in)
24.09.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Secondary grouting process for pre-stressed anchor bolt cage of wind driven generator foundation
Europäisches Patentamt | 2024
|