Fabricated concrete integrated auxiliary house special for transformer substation and installation method
The invention provides an assembly type concrete integrated auxiliary house special for a transformer substation and an installation method, the assembly type concrete integrated auxiliary house comprises a first auxiliary house and a second auxiliary house, and the first auxiliary house and the second auxiliary house each comprise a plurality of entrance doors and an internal residence space formed by a wall body, a floor and a roof plate; a residence space formed by the first auxiliary room and the second auxiliary room is divided into a guard room, a bathroom, a meal preparation room, a duty room and a toilet, the guard room, the bathroom, the meal preparation room, the duty room and the toilet are each independently provided with an entrance door, and the first auxiliary room and the second auxiliary room are connected through filling mortar. According to the fabricated concrete integrated auxiliary house special for the transformer substation, the auxiliary house is divided into two or more independent parts, transportation of the auxiliary house is facilitated, and then the first auxiliary house and the second auxiliary house are connected through the filling mortar, so that cementing materials are saved, construction is facilitated, and the construction efficiency is improved. Therefore, on-site installation time is saved.
本发明提供一种变电站专用装配式混凝土一体化辅助用房及安装方法,包括第一辅助房和第二辅助房,第一辅助房和第二辅助房都包括多个入户门以及由墙体、地板和屋顶板形成的内部住宅空间,第一辅助房和第二辅助房形成的住宅空间分成警卫室、卫浴间、备餐间、值班室和卫生间,且警卫室、卫浴间、备餐间、值班室和卫生间均单独设置入户门,在第一辅助房和第二辅助房之间通过填充砂浆连接,由于本发明设置了一种变电站专用装配式混凝土一体化辅助用房,通过把辅助用房分成两个或者更多的单独部分,方便辅助用房的运输,再通过使用填充砂浆连接第一辅助房和第二辅助房,这样有利于节约胶凝材料,方便施工,从而节约现场安装时间。
Fabricated concrete integrated auxiliary house special for transformer substation and installation method
The invention provides an assembly type concrete integrated auxiliary house special for a transformer substation and an installation method, the assembly type concrete integrated auxiliary house comprises a first auxiliary house and a second auxiliary house, and the first auxiliary house and the second auxiliary house each comprise a plurality of entrance doors and an internal residence space formed by a wall body, a floor and a roof plate; a residence space formed by the first auxiliary room and the second auxiliary room is divided into a guard room, a bathroom, a meal preparation room, a duty room and a toilet, the guard room, the bathroom, the meal preparation room, the duty room and the toilet are each independently provided with an entrance door, and the first auxiliary room and the second auxiliary room are connected through filling mortar. According to the fabricated concrete integrated auxiliary house special for the transformer substation, the auxiliary house is divided into two or more independent parts, transportation of the auxiliary house is facilitated, and then the first auxiliary house and the second auxiliary house are connected through the filling mortar, so that cementing materials are saved, construction is facilitated, and the construction efficiency is improved. Therefore, on-site installation time is saved.
本发明提供一种变电站专用装配式混凝土一体化辅助用房及安装方法,包括第一辅助房和第二辅助房,第一辅助房和第二辅助房都包括多个入户门以及由墙体、地板和屋顶板形成的内部住宅空间,第一辅助房和第二辅助房形成的住宅空间分成警卫室、卫浴间、备餐间、值班室和卫生间,且警卫室、卫浴间、备餐间、值班室和卫生间均单独设置入户门,在第一辅助房和第二辅助房之间通过填充砂浆连接,由于本发明设置了一种变电站专用装配式混凝土一体化辅助用房,通过把辅助用房分成两个或者更多的单独部分,方便辅助用房的运输,再通过使用填充砂浆连接第一辅助房和第二辅助房,这样有利于节约胶凝材料,方便施工,从而节约现场安装时间。
Fabricated concrete integrated auxiliary house special for transformer substation and installation method
一种变电站专用装配式混凝土一体化辅助用房及安装方法
YANG ZHI (Autor:in) / ZHU BANGSHENG (Autor:in) / TU GUOBIN (Autor:in) / LU JUN (Autor:in) / ZHU XIANFENG (Autor:in) / WANG HONGBING (Autor:in) / ZHANG BO (Autor:in) / YE GUANGRONG (Autor:in) / YANG PENG (Autor:in) / QIU JIN (Autor:in)
24.09.2024
Patent
Elektronische Ressource
Chinesisch
Fabricated transformer substation with integrated base
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|Transformer installation foundation and transformer substation
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|