Cooling tower with steel pipe-steel plate-concrete prefabricated assembly structure and construction method thereof
The invention relates to a steel pipe-steel plate-concrete prefabricated assembly structure cooling tower and a construction method thereof. The steel pipe-steel plate-concrete prefabricated assembly structure cooling tower comprises outer side steel plates, inner side steel plates, steel pipes, welding stud connecting pieces and filling concrete. The outer side steel plate and the inner side steel plate enclose circumferences with different radiuses to form the outer side and the inner side of the tower wall of the cooling tower, a plurality of welding stud connecting pieces are arranged in a gap between the outer side steel plate and the inner side steel plate, and the filling concrete fills the residual gap part. Compared with the prior art, steel pipes and steel plate elements are prefabricated in a factory and assembled into a stiff steel framework on site, the structural mechanical property is enhanced, meanwhile, the stiff steel framework serves as a formwork for pouring concrete, the construction period is shortened, the construction complexity is reduced, the construction quality is improved, and the construction safety risk is reduced.
本发明涉及钢管‑钢板‑混凝土预制拼装结构冷却塔及其施工方法,包括外侧钢板,内侧钢板,钢管,焊钉连接件和填充混凝土;所述的外侧钢板和内侧钢板围成半径不同的圆周,组成冷却塔塔壁的外侧和内侧,所述的外侧钢板与所述的内侧钢板之间的间隙处置有多个焊钉连接件,且所述的填充混凝土填充剩余的间隙部分。与现有技术相比,本发明通过工厂预制钢管和钢板元件,在现场组装成劲性钢骨架,增强结构力学性能的同时作为浇筑混凝土的模板,减少施工工期和施工复杂程度,提高施工质量,降低施工安全风险。
Cooling tower with steel pipe-steel plate-concrete prefabricated assembly structure and construction method thereof
The invention relates to a steel pipe-steel plate-concrete prefabricated assembly structure cooling tower and a construction method thereof. The steel pipe-steel plate-concrete prefabricated assembly structure cooling tower comprises outer side steel plates, inner side steel plates, steel pipes, welding stud connecting pieces and filling concrete. The outer side steel plate and the inner side steel plate enclose circumferences with different radiuses to form the outer side and the inner side of the tower wall of the cooling tower, a plurality of welding stud connecting pieces are arranged in a gap between the outer side steel plate and the inner side steel plate, and the filling concrete fills the residual gap part. Compared with the prior art, steel pipes and steel plate elements are prefabricated in a factory and assembled into a stiff steel framework on site, the structural mechanical property is enhanced, meanwhile, the stiff steel framework serves as a formwork for pouring concrete, the construction period is shortened, the construction complexity is reduced, the construction quality is improved, and the construction safety risk is reduced.
本发明涉及钢管‑钢板‑混凝土预制拼装结构冷却塔及其施工方法,包括外侧钢板,内侧钢板,钢管,焊钉连接件和填充混凝土;所述的外侧钢板和内侧钢板围成半径不同的圆周,组成冷却塔塔壁的外侧和内侧,所述的外侧钢板与所述的内侧钢板之间的间隙处置有多个焊钉连接件,且所述的填充混凝土填充剩余的间隙部分。与现有技术相比,本发明通过工厂预制钢管和钢板元件,在现场组装成劲性钢骨架,增强结构力学性能的同时作为浇筑混凝土的模板,减少施工工期和施工复杂程度,提高施工质量,降低施工安全风险。
Cooling tower with steel pipe-steel plate-concrete prefabricated assembly structure and construction method thereof
钢管-钢板-混凝土预制拼装结构冷却塔及其施工方法
XU XIAOQING (Autor:in) / CHEN CHANGSHENG (Autor:in) / LIU YUQING (Autor:in)
24.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Prefabricated thin-wall concrete pipe tower and construction method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Prefabricated FRP pipe-concrete-steel pipe combined column and construction method thereof
Europäisches Patentamt | 2021
|Prefabricated light steel concrete plate column structure and construction method thereof
Europäisches Patentamt | 2016
|Prefabricated steel plate concrete bracket structure and construction method
Europäisches Patentamt | 2022
|