Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Repair structure and repair method suitable for uplift pile
The repairing structure comprises a pile cap capable of being arranged at the end of the broken pile in a sleeving mode, the pile cap comprises a sleeve and an end plate arranged at the upper end of the sleeve, a plurality of through holes are formed in the end plate, and the positions of the through holes correspond to the positions of main reinforcements in the broken pile one to one. The lower end of the through hole is fixedly connected with a sleeve allowing the corresponding main reinforcement to penetrate from bottom to top, the inner diameter of the sleeve is gradually increased from bottom to top, a connector used for clamping the corresponding main reinforcement is arranged in the sleeve, and the outer diameter of the connector is also gradually increased from bottom to top. And the connectors penetrate through the through holes from top to bottom, then are inserted into the corresponding sleeves and are matched with the sleeves. The method has the advantages that the pile head can be reinforced and repaired, and the anti-pulling capacity is high.
本发明公开了一种适用于抗拔桩的修补结构及修补方法,用于修复断桩,修补结构包括能套在断桩端部的桩帽,所述桩帽包括套管、以及设在套管上端的端板,所述端板上设有若干通孔,所述通孔位置和断桩中主筋的位置一一对应,所述通孔的下端固定连接有能供对应主筋从下往上穿过的套筒,所述套筒的内径从下往上逐渐扩大,所述套筒中设有用于夹持对应主筋的连接器,所述连接器的外径也从下往上逐渐扩大,且所述连接器从上往下穿过通孔后插入对应的套筒内并与其相互配合。本发明具有可加固修补桩头并且抗拔能力高的优点。
Repair structure and repair method suitable for uplift pile
The repairing structure comprises a pile cap capable of being arranged at the end of the broken pile in a sleeving mode, the pile cap comprises a sleeve and an end plate arranged at the upper end of the sleeve, a plurality of through holes are formed in the end plate, and the positions of the through holes correspond to the positions of main reinforcements in the broken pile one to one. The lower end of the through hole is fixedly connected with a sleeve allowing the corresponding main reinforcement to penetrate from bottom to top, the inner diameter of the sleeve is gradually increased from bottom to top, a connector used for clamping the corresponding main reinforcement is arranged in the sleeve, and the outer diameter of the connector is also gradually increased from bottom to top. And the connectors penetrate through the through holes from top to bottom, then are inserted into the corresponding sleeves and are matched with the sleeves. The method has the advantages that the pile head can be reinforced and repaired, and the anti-pulling capacity is high.
本发明公开了一种适用于抗拔桩的修补结构及修补方法,用于修复断桩,修补结构包括能套在断桩端部的桩帽,所述桩帽包括套管、以及设在套管上端的端板,所述端板上设有若干通孔,所述通孔位置和断桩中主筋的位置一一对应,所述通孔的下端固定连接有能供对应主筋从下往上穿过的套筒,所述套筒的内径从下往上逐渐扩大,所述套筒中设有用于夹持对应主筋的连接器,所述连接器的外径也从下往上逐渐扩大,且所述连接器从上往下穿过通孔后插入对应的套筒内并与其相互配合。本发明具有可加固修补桩头并且抗拔能力高的优点。
Repair structure and repair method suitable for uplift pile
一种适用于抗拔桩的修补结构及修补方法
ZHU YIHONG (Autor:in) / RUAN FANGLIN (Autor:in) / CHEN YE (Autor:in) / CAI LIN (Autor:in)
27.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
PILE FOUNDATION REPAIR METHOD, PILE FOUNDATION REPAIR KIT, AND PILE FOUNDATION STRUCTURE
Europäisches Patentamt | 2016
|REPAIR STRUCTURE OF PILE-TYPE CONSTRUCTION AND REPAIR METHOD
Europäisches Patentamt | 2015
|Uplift pile uplift test structure and test method thereof
Europäisches Patentamt | 2024
|