Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete elevation control device and construction method
The invention provides a concrete elevation control device and a construction method.The concrete elevation control device comprises a fixing part and a positioning part, the fixing part comprises a bobbin and a plurality of standard lines, each standard line is wound around the bobbin, the positioning part comprises an adjusting part and a positioning part capable of being used for positioning the concrete elevation, and the adjusting part is used for adjusting the concrete elevation. The adjusting piece is arranged at the bottom of the bobbin, and the positioning piece is movably connected with the adjusting piece to adjust the vertical height. According to the construction method of the concrete elevation control device, at least two standard lines correspond to an elevation control line and are fixed, an adjusting piece is suspended on a formwork capable of bearing concrete through the multiple standard lines, the bottom of the adjusting piece abuts against the top of the formwork, and the concrete elevation can be positioned through a positioning piece; the device can be detached after being used. The device has the beneficial effects that the structure is simple, the manufacturing cost is low, repeated use is achieved, the concrete pouring quality is improved, meanwhile, the construction efficiency can be improved, and the labor and maintenance cost is reduced.
本发明提供一种混凝土标高控制装置及施工方法,混凝土标高控制装置包括固定部件和定位部件,固定部件包括线轴和多个标准线,每个标准线均被绕设于线轴,定位部件包括调节件和可用于定位混凝土标高的定位件,调节件设于线轴底部,定位件与调节件活动连接以调节竖向高度。本发明提供混凝土标高控制装置的施工方法,将至少两个标准线分别与标高控制线对应并固定,通过多个标准线将调节件悬置于可承载混凝土的模板上并将调节件底部与模板顶部抵接,通过定位件可定位混凝土标高;使用后装置可拆卸。本发明的有益效果是结构简单、制作成本低,可重复使用,提高混凝土浇筑质量同时可提高施工效率,降低人工和维修成本。
Concrete elevation control device and construction method
The invention provides a concrete elevation control device and a construction method.The concrete elevation control device comprises a fixing part and a positioning part, the fixing part comprises a bobbin and a plurality of standard lines, each standard line is wound around the bobbin, the positioning part comprises an adjusting part and a positioning part capable of being used for positioning the concrete elevation, and the adjusting part is used for adjusting the concrete elevation. The adjusting piece is arranged at the bottom of the bobbin, and the positioning piece is movably connected with the adjusting piece to adjust the vertical height. According to the construction method of the concrete elevation control device, at least two standard lines correspond to an elevation control line and are fixed, an adjusting piece is suspended on a formwork capable of bearing concrete through the multiple standard lines, the bottom of the adjusting piece abuts against the top of the formwork, and the concrete elevation can be positioned through a positioning piece; the device can be detached after being used. The device has the beneficial effects that the structure is simple, the manufacturing cost is low, repeated use is achieved, the concrete pouring quality is improved, meanwhile, the construction efficiency can be improved, and the labor and maintenance cost is reduced.
本发明提供一种混凝土标高控制装置及施工方法,混凝土标高控制装置包括固定部件和定位部件,固定部件包括线轴和多个标准线,每个标准线均被绕设于线轴,定位部件包括调节件和可用于定位混凝土标高的定位件,调节件设于线轴底部,定位件与调节件活动连接以调节竖向高度。本发明提供混凝土标高控制装置的施工方法,将至少两个标准线分别与标高控制线对应并固定,通过多个标准线将调节件悬置于可承载混凝土的模板上并将调节件底部与模板顶部抵接,通过定位件可定位混凝土标高;使用后装置可拆卸。本发明的有益效果是结构简单、制作成本低,可重复使用,提高混凝土浇筑质量同时可提高施工效率,降低人工和维修成本。
Concrete elevation control device and construction method
一种混凝土标高控制装置及施工方法
LI YADONG (Autor:in) / LI QUN (Autor:in) / ZHANG YUWEI (Autor:in)
27.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Concrete construction elevation control device and control method
Europäisches Patentamt | 2024
|Cement concrete pavement elevation control structure and construction method thereof
Europäisches Patentamt | 2021
|Ground elevation control device and construction method
Europäisches Patentamt | 2025
|